Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 468975 | |||||
Electrical permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 566761 | |||||
New construction permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 518585 | |||||
Plumbing permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 551468 | |||||
Demolition permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 525196 | |||||
Zoning permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 454361 | |||||
Mechanical permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 566874 | |||||
Mechanical permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 566874 | |||||
Demolition permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 525196 | |||||
Electrical permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 566761 | |||||
New construction permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 518585 | |||||
Plumbing permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 551468 | |||||
Zoning use permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 468975 | |||||
Zoning permit ![]() Client: Zhang Tony | Permit status: Completed | Permit id: 454361 | |||||
SCORE 79 For the erection of a detached structure with a interior parking space, a front and rear yard deck on the first floor level; building not to exceed 38-0" in height. Size and location as shown in application plan. Building for use as a single family dwelling. Requires streets department approval in building application as stated by the streets department stamp ![]() ![]() Client: Zhang Tom | Permit type: Zoning/use permit | Permit status: Completed | Completion date: May 3, 2013 | Permit id: 468975 | |||||
SCORE 100 Total rewire (sfd) as per nec 2008 (south dist) ![]() ![]() Client: Zhang Tom | Permit type: Electrical permit | Permit status: Completed | Completion date: February 13, 2017 | Permit id: 566761 | |||||
SCORE 100 Install 1 hvac unit with ductwork(sfd) ![]() ![]() Client: Zhang Tom | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 2, 2015 | Permit id: 566874 | |||||
SCORE 88 Complete demolition of an existing two (2) story structure with detached garage. All permitted demolition activity to be in accordance with approved site safety demolition plan & such plan to be maintained on site at all times. ![]() ![]() Client: Zhang Tom | Permit type: Demolition permit | Permit status: Completed | Completion date: October 10, 2014 | Permit id: 525196 | |||||
SCORE 100 New construction 12 fixtures with piping ![]() ![]() Client: Zhang Tom | Permit type: Plumbing permit | Permit status: Completed | Completion date: June 6, 2015 | Permit id: 551468 | |||||
SCORE 79 For the demolition of all existing structures on the lot and for the relocation of lot lines to create two (2) lots from three (3) existing lots (1418 aldine street-premises a (two (2) lots) and premises b (one (1)lot) under one opa account #561285700, size and location as shown in application plan. ![]() ![]() Client: Zhang Tom | Permit type: Zoning permit | Permit status: Completed | Completion date: April 30, 2013 | Permit id: 454361 | |||||
SCORE 99 New construction two-story detached single-family dwelling with a interior parking space, a front and rear yard deck on the first floor level as per the sealed submitted plans. See a p # 518575 for the approved plans. Plumbing, electrical, and mechanical work requires additional permits. Call the inspector prior to starting work. ![]() ![]() Client: Zhang Tom | Permit type: New construction permit | Permit status: Completed | Completion date: May 11, 2015 | Permit id: 518585 |