Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hra- gas line repair Date: February 19, 2014 Permit type: Plumbing : 80 - acc | Permit status: Permit finaled | Completion date: February 21, 2014 | Permit id: Pds2014-Resalt- | |||||
- gas line repair Date: February 19, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: February 21, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 93 20 sq ft, re-roof for (e) sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt shingles proposed roofing material asphalt shingles manufacturer gaf brand and model timberline color (if cool roof required) hickory built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Completed | Completion date: October 11, 2017 | Permit id: Pds2017-Resalt- | |||||
SCORE 82 Windows and or sliding glass door replacements with the same net openable area. (replacement windows must meet state of california energy code requirements for u-factor and shgc for package d of the applicable climate zone (see pds #409). Also, per county building code 704a. 3. 2. 2; windows shall be dual-glazed with a minimum of one tempered pane, and glazing frames made of vinyl shall have welded corners and metal reinforcing in the interlock area.) Date: July 11, 2017 Contractor: Home Depot U S A Inc Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
House gas 1st Date: February 19, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |