Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Re-drain (6) fixtures vertical and horizontal pipe,copper re-pipe (1) fixture,shower valve,new toilet Date: July 6, 2011 Contractor: Right On Time Plumbing Inc Applicant: Hadar Peretz | Permit status: Permisud | Permit id: 1107060002 | |||||
SCORE 93 Re-pipe for (8) points Date: July 11, 2011 Contractor: Right On Time Plumbing Inc Applicant: Hadar Peretz | Permit status: Permisud | Permit id: 1107110025 |