Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 89 (3) 15 cfm, (1) 545 cfm, (1) cfm, (1) 10 cfm, (1) 3 cfm, (2) ceiling fans, (1) ductless split ac @ 31, 4 btu cooling Date: April 19, 2010 Contractor: Meyers, Heath Permit id: Mech20101478 | |||||
(1) gal wh (2) open site drains (2) eye shower (1) catch basin Date: May 14, 2009 Permit id: Plum20091332 | |||||
In floor heat one zone Date: April 5, 2010 Permit id: Mech20101419 | |||||
(3) 15 cfm, (1) 545 cfm, (1) cfm, (1) 10 cfm, (1) 3 cfm, (2) ceiling fans, (1) ductless split ac @ 31, 4 btu cooling Date: April 19, 2010 Permit id: Mech20101478 | |||||
SCORE 70 In floor heat one zone Date: April 5, 2010 Contractor: Griffey Al Permit id: Mech20101419 | |||||
SCORE 89 (3) 15 cfm, (1) 545 cfm, (1) cfm, (1) 10 cfm, (1) 3 cfm, (2) ceiling fans, (1) ductless split ac @ 31, 4 btu cooling Date: April 19, 2010 Contractor: Meyers Heath Permit id: Mech20101478 | |||||
SCORE 75 (1) gal wh (2) open site drains (2) eye shower (1) catch basin Date: May 14, 2009 Contractor: Ginger Christopher Permit id: Plum20091332 | |||||
SCORE 70 In floor heat one zone Date: April 5, 2010 Contractor: Griffey, Al Permit id: Mech20101419 | |||||
SCORE 75 (1) gal wh (2) open site drains (2) eye shower (1) catch basin Date: May 14, 2009 Contractor: Ginger, Christopher Permit id: Plum20091332 |