Addition permit Date: April 21, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 571345 | |||||
Operations permit Date: May 6, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 24189 | |||||
Electrical permit Date: December 31, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 624573 | |||||
Suppression permit Date: March 8, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 624905 | |||||
Alteration permit Date: November 6, 2014 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 572455 | |||||
Administrative permit Date: June 1, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 696508 | |||||
Zoning/use permit Date: February 10, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 551741 | |||||
Plumbing permit Date: November 19, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 643490 | |||||
Mechanical permit Date: July 24, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 627254 | |||||
Permit for the 2nd floor addition at rear (298"x10) for a legalization of a multi-family household living (7 dwelling units) from 2nd thru 3rd floor in the same building existing personal vehicle repair and maintenance (auto repair shop) on first floor. Size and location as shown in the application. No sign on this application. Client: Delcon Construction G P + R Capone | Applicant: Richard Demarco, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2014 | Permit id: 23621 | |||||
Mechanical permit Date: July 24, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 627254 | |||||
Alteration permit Date: November 6, 2014 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 572455 | |||||
Suppression permit Date: March 8, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 624905 | |||||
Operations permit Date: May 6, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 24189 | |||||
Plumbing permit Date: November 19, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 643490 | |||||
Electrical permit Date: December 31, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 624573 | |||||
Zoning use permit Date: February 10, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 551741 | |||||
Administrative permit Date: June 1, 2016 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 696508 | |||||
Addition permit Date: April 21, 2015 Client: Delcon Construction G P + R Capone | Permit status: Completed | Permit id: 571345 | |||||
Permit for the 2nd floor addition at rear (298"x10) for a legalization of a multi-family household living (7 dwelling units) from 2nd thru 3rd floor in the same building existing personal vehicle repair and maintenance (auto repair shop) on first floor. Size and location as shown in the application. No sign on this application. Client: Delcon Construction G P + R Capone | Applicant: Richard Demarco, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 27, 2014 | Permit id: 23621 | |||||
SCORE 89 Existing 6 amp service installing new receptacles, switches, gfci recptacles, and lighting as per 2008 nec. Installing new fire alarm as per nfpa 72 (south district) Date: December 31, 2015 Contractor: Dc Power Assoc Llc Client: Elcon Construction G P + R Capone | Permit type: Electrical permit | Permit status: Completed | Completion date: June 1, 2016 | Permit id: 624573 | |||||
SCORE 89 Replace 7 windows in existing openings on the 2nd & 3rd floors only, no change in size. New windows and doors must comply with all glazing requirements of the 2009 international energy conservation code. Ez windows & doors permit for replacement of exterior windows and doors without submitting plans by meeting the conditions and design limitations any deviations from this permit standard will result in permit revocation. Prescriptive energy code compliance. Window . 35 u-factor Date: November 6, 2014 Contractor: Dc Power Assoc Llc Client: Elcon Construction G P + R Capone | Permit type: Alteration permit | Permit status: Completed | Completion date: November 9, 2015 | Permit id: 572455 | |||||
SCORE 100 Install fire suppression system in three story mixed use bldg. 1st floor commercial auto mechanic 2nd & 3rd floor. Multi-family. Fire service 4" andrew harmen, pe: code certifying design prof: Date: March 8, 2016 Contractor: Cellich Fire Protection Inc Client: Elcon Construction G P + R Capone | Permit type: Suppression permit | Permit status: Completed | Completion date: May 12, 2016 | Permit id: 624905 | |||||
SCORE 62 Hotworks: welding cutting soldering torch work - permit expires: 10 10 18 Date: October 10, 2017 Contractor: Foreign Fix Auto Ctr Inc Client: Elcon Construction G P + R Capone | Permit type: Operations permit | Permit status: Completed | Permit id: 25191 | |||||
SCORE 93 Leagalize 7 residential dwellings units with rear addition Date: February 10, 2015 Contractor: Cgi Construction Inc Client: Elcon Construction G P + R Capone | Permit type: Zoning/use permit | Permit status: Completed | Completion date: February 10, 2015 | Permit id: 551741 | |||||
SCORE 75 Construct new 3rd story addition, lofts(bi level), new decks, egress stair and lift installation, fit out & alterations as completed 2nd floor. 1st floor commercial space not included in scope of application, except for above floor egress and lift. Building to be fully sprinklered. Additional permits req: electrical, plumbing, hvac, sprinklers, signs. Date: April 21, 2015 Contractor: Angelo Zaccardo Client: Elcon Construction G P + R Capone | Permit type: Addition permit | Permit status: Completed | Completion date: July 12, 2016 | Permit id: 571345 | |||||
SCORE 62 Hotworks: welding cutting soldering torch work - permit expires:050617 Date: May 6, 2016 Contractor: Foreign Fix Auto Ctr Inc Client: Elcon Construction G P + R Capone | Permit type: Operations permit | Permit status: Completed | Permit id: 24189 | |||||
SCORE 100 Plumbing construction for (7)residential units on the 2nd & 3rd floors - 1st floor commercial space is not included in the scope of this permit work - vent terminations at the roof decks must extend to at least 7-0" above the walking surface per section p-1103. 4. 1 of the philadelphia plumbing code 2004 - flat offsets of soil waste stacks must comply with section p-1107 and branch venting must comply with section p-1105 of the philadelphia plumbing code 2004 - note: exterior, storm, sewer water connections (if required) and the installation of a backflow prevention containment device require separate permit(s) Date: November 19, 2015 Contractor: Jr Mcgee Plumbing Llc Client: Elcon Construction G P + R Capone | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 30, 2016 | Permit id: 643490 | |||||
SCORE 89 Temporary co for units a, b, and f and common areas Date: June 1, 2016 Contractor: Dc Power Assoc Llc Client: Elcon Construction G P + R Capone | Permit type: Administrative permit | Permit status: Completed | Completion date: February 24, 2017 | Permit id: 696508 | |||||
SCORE 100 Installing 7-heaters (70,0 btus 92 percent eff), 7-coil (2 1 2 ton), 7-a c units (2 1 2 ton) ductwork, grills, regs Date: July 24, 2015 Contractor: Dj Tracy Mechanical Llc Client: Elcon Construction G P + R Capone | Permit type: Mechanical permit | Permit status: Completed | Completion date: June 16, 2016 | Permit id: 627254 |