Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Temp power for construction Date: December 16, 2011 Contractor: Spartan Electric Inc Permit type: Electrical | Permit status: Closed | Current use: Residential | Permit id: Bld2011-05812 | |||||
SCORE 95 Elec service change to sfd Date: December 2, 2011 Contractor: Spartan Electric Inc Permit type: Electrical | Permit status: Closed | Current use: Residential | Permit id: Bld2011-07932 | |||||
SCORE 99 Run new b-vent for existing furnace and water heater. Date: December 12, 2011 Contractor: Lees Heat A C And Refrig Inc Permit type: Mechanical | Permit status: Closed | Current use: Residential | Permit id: Bld2011-08111 | |||||
Releates to the building permit for the torreano remodel bld2010-04358: current upstairs contains: 1 toilet, 2 sinks, 1 bathtub. Proposed upstairs will contain: 1 toilet, 1 sink, 1 shower, 1 laundry. Replace cast iron drains with abs. Replace cast iron vents with abs. Consolidate vents into 1 - 4" abs vent. Replace all existing galvanized steel supply lines with pex. Date: January 6, 2012 Permit type: Plumbing | Permit status: Inspections | Current use: Residential | Permit id: Bld2012-00157 | |||||
SCORE 95 Home owner only finishing main level at this time Date: January 16, 2012 Contractor: Spartan Electric Inc Permit type: Electrical | Permit status: Inspections | Current use: Residential | Permit id: Bld2012-00386 | |||||
SCORE 83 1-furnace, 1-a/c. Date: May 9, 2013 Contractor: Terry Joe Dipoma Permit type: Mechanical | Permit status: Inspections | Current use: Residential | Permit id: Bld2013-02979 |