Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 15-1131: deferred buckling-restrained brace design. Date: September 30, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: In plan check | Permit id: 15rev-00558 | |||||
SCORE 100 Construction of a 77,634 sf two-story office building with 41,2 sf below ground parking. ( concurrent arb 15pln-00011 ) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01131 | |||||
SCORE 95 Temp power Date: August 25, 2015 Contractor: Sasco Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-02250 | |||||
SCORE 93 15000-01191: deferred submittal for structural improvements at fixed glass partitions, stairs, slab penetrations and anchorage at shelving Date: June 1, 2015 Contractor: Bcci Construction Company Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 15rev-00315 | |||||
SCORE 96 14-2969: new 250amp panel due to lack of correct number of breaker spaces in 600a panel. Date: June 12, 2015 Contractor: Sun Light And Power Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00343 | |||||
SCORE 100 Demo (e) commercial building Date: May 7, 2015 Contractor: Devcon Construction Incorporated Permit type: Project - building permit | Permit status: In plan check | Permit id: 15000-01132 | |||||
SCORE 100 Repair failing retaining wall ~365lf. No grading excavation. Permit type: Project - building permit | Permit status: Approved | Permit id: 15000-00534 | |||||
SCORE 100 13-3225: mechanical revisions within shell including rooftop equipment, electrical changes and grading changes on civil sheets Date: January 21, 2015 Contractor: Devcon Construction Incorporated Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00025 | |||||
SCORE 96 14000-02969: revise structural plans to match the calculations Date: January 9, 2015 Contractor: Sun Light And Power Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 15rev-00011 | |||||
SCORE 96 Commercial pv: 413kw solar electric grid tied system mounted to (2) carports, trellis and roof of a 2-story building Date: November 17, 2014 Contractor: Sun Light And Power Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-02969 | |||||
SCORE 59 Stanford: replace existing 4 ton gas unit on the roof of the building. Replace unit in the same location as existing. Date: October 16, 2012 Contractor: Leland Stanford Jr University Board Of Tr Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02597 | |||||
SCORE 100 15-1131: revision includes changes to roof anchor system clarification and irrigation system. Lighting changes and associated panel changes. Revise backflow device and associated plumbing change. New rail around roof hatch. Stair rail change. Rooftop mechanical duct chagne. Date: August 19, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00512 | |||||
SCORE 100 Install electric vehicle supply equipment (evse), level 2, (1) surface parking lot and (6) below grade garage Date: September 30, 2016 Contractor: Devcon Construction Incorporated Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02478 | |||||
SCORE 93 Ti for new tenant "infosys limited" phase 1 replacement of two interior stairs demo portion of slab to enlarge opening. New stadium seating. Structural review only. Build out to be under separate permit. Permit type: Project - building permit | Permit status: In plan check | Permit id: 16000-02619 | |||||
SCORE 100 15-1131: deferred 2nd floor balcony divider rail design. Date: July 20, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00464 | |||||
SCORE 96 Install a ballasted, roof-mounted 282. 11 kw solar photovoltaic electric power system with (960) sunpower spr-e20-327 327 w modules Date: September 28, 2016 Contractor: Sun Light And Power Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-02450 | |||||
SCORE 100 15-1131: deferred stair 1,2 and 3 10 26 16 re-submittal for deferred stair #3 only dt. 11 9 2016 removed from scope of revision deferred stair 2&3 hr, this revision now only includes stair #1 Date: July 20, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00463 | |||||
SCORE 100 15-1131: stair 4 5 and rail system at balcony rail and site vehicle barrier. Date: June 8, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00355 | |||||
SCORE 100 15-1131: deferred glazing and skylight design. Date: June 8, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00354 | |||||
SCORE 93 Ti and u&o for new tenant "morgan stanley" to occupy ground floor. Scope of work includes interior remodel new partions, milwork and ceiling tile. New roof top equipment. Area of work 25647 sf Permit type: Project - building permit | Permit status: Permit issued | Permit id: 16000-01114 | |||||
SCORE 93 16-1114: existing panel for temp power construction. Date: November 4, 2016 Contractor: Bcci Construction Company Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00709 | |||||
SCORE 100 15-1131: revision includes field construction clarifications and design changes to interior stair and space layout. Revised landscape and civil. Date: July 12, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: In plan check | Permit id: 16rev-00430 | |||||
15000-01131: revision to include gas regulator to relocate from existing (ext of glass curtain wall) to interior of bike storage, water prv to relocate from existing (ext of glass curtain wall) to exterior bfp Date: December 23, 2016 Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00795 | |||||
SCORE 100 15-1131: revised plans removal of scope at the south patio area of the site. The south patio will be completed as part of the tenant improvement scope and the submitted under separate permit. Said proposed landscape to be reviewwed by landscape under separate ti plans. Date: November 9, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Permit issued | Permit id: 16rev-00713 | |||||
SCORE 100 15ooo-01131: revised scope to exclude stair rails, lighting generator acoustic enclosure . Minor electrical and restroom layout clarification. Date: October 4, 2016 Contractor: Devcon Construction Incorporated Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00632 | |||||
SCORE 93 Morgan lewis and bockius llp: ti and u&o for a 51379 sf tenant space on first and second floors. Scope of work includes new rooftop equipment. U&o sent 7 25 16 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-01191 | |||||
SCORE 93 16000-01114: revised interior layout Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00470 |