Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: June 18, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 541595 | |||||
New construction permit Date: September 3, 2015 Client: New Bridge Foundation Llc | Permit status: Active | Permit id: 629630 | |||||
Electrical permit Date: February 18, 2016 Client: Pia Properties Llc | Permit status: Completed | Permit id: 670034 | |||||
Electrical permit Date: April 6, 2015 Client: Hanes Christopher B | Permit status: Expired | Permit id: 600819 | |||||
Plumbing permit Date: October 3, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 566108 | |||||
Suppression permit Date: February 10, 2016 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 663189 | |||||
Suppression permit Date: December 5, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 576882 | |||||
Zoning permit Date: June 3, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 539277 | |||||
Plumbing permit Date: February 12, 2016 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 654292 | |||||
Zoning/use permit Date: June 16, 2015 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 615551 | |||||
Mechanical permit Date: March 22, 2016 Client: New Bridge Foundation Llc | Permit status: Active | Permit id: 678149 | |||||
New construction permit Date: September 16, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 561356 | |||||
Demolition permit Date: December 12, 2014 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 576761 | |||||
Mechanical permit Date: August 13, 2015 Client: Hanes Christopher B | Permit status: Completed | Permit id: 631783 | |||||
Permit for the erection of an attached structure (nte 38 high) with roof top deck (accessed by a pilot house); bay windows at 2nd and 3rd floors for a multi-family household living (three (3) dwelling units) from first floor through third floors. Size and location as shown in the application. Date: February 12, 2015 Client: New Bridge Foundation Llc | Applicant: Roger Perry, Esq. | Permit type: Appeal | Permit status: Withdrawn | Permit id: 24614 | |||||
Electrical permit Date: April 6, 2015 Client: Hanes Christopher B | Permit status: Expired | Permit id: 600819 | |||||
Zoning use permit Date: June 18, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 541595 | |||||
Electrical permit Date: February 18, 2016 Client: Pia Properties Llc | Permit status: Completed | Permit id: 670034 | |||||
Suppression permit Date: February 11, 2016 Client: Pia Properties Llc | Permit status: Completed | Permit id: 667808 | |||||
Mechanical permit Date: August 13, 2015 Client: Hanes Christopher B | Permit status: Completed | Permit id: 631783 | |||||
Demolition permit Date: December 12, 2014 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 576761 | |||||
Mechanical permit Date: March 22, 2016 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 678149 | |||||
Zoning use permit Date: August 24, 2015 Client: Pia Properties Llc | Permit status: Completed | Permit id: 633552 | |||||
Plumbing permit Date: December 10, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 578974 | |||||
New construction permit Date: September 3, 2015 Client: New Bridge Foundation Llc | Permit status: Completed | Permit id: 629630 | |||||
Suppression permit Date: December 5, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 576882 | |||||
New construction permit Date: September 16, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 561356 | |||||
Plumbing permit Date: February 18, 2016 Client: Pia Properties Llc | Permit status: Completed | Permit id: 670787 | |||||
Zoning permit Date: June 3, 2014 Client: Hanes Christopher B | Permit status: Completed | Permit id: 539277 | |||||
Permit for the erection of an attached structure (nte 38 high) with roof top deck (accessed by a pilot house); bay windows at 2nd and 3rd floors for a multi-family household living (three (3) dwelling units) from first floor through third floors. Size and location as shown in the application. Date: February 12, 2015 Client: New Bridge Foundation Llc | Applicant: Roger Perry, Esq. | Permit type: Appeal | Permit status: Withdrawn | Permit id: 24614 | |||||
SCORE 100 Curb trap,lateral,partial main drain and 1 rfss meter service pa20160470235 (two family)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: February 18, 2016 Contractor: Excel Plumbing Heating Ac Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 670787 | |||||
SCORE 100 Installation of automatic sprinkler system in accordance with nfpa 13-d throughout a three (3) story attached structure with partial basement, carport and pilot house for roof deck access (single-family dwelling). This is a multi-purpose system utilizing a combined one inch (1") domestic and fire service line. Separate permit required for all plumbing work. See permit # 565826 for plans and calculations. Date: December 5, 2014 Contractor: Elite Fire Protection Client: Hanes Christopher B | Permit type: Suppression permit | Permit status: Completed | Completion date: October 20, 2015 | Permit id: 576882 | |||||
New construction of a three (3) story two (2) family dwelling with a roof deck and pilot house (access to roof deck only) as per approved plans. Building to be fully sprinklered. See a p 634518 for plans separate permits required for mep & fire suppression work Date: December 29, 2015 Permit type: New construction permit | Permit status: Completed | Completion date: July 7, 2016 | Permit id: 638371 | |||||
SCORE 100 2 mamp service and interior work all work according to 2008 nec Date: April 6, 2015 Contractor: Dm Electric Llc Client: Hanes Christopher B | Permit type: Electrical permit | Permit status: Expired | Completion date: May 11, 2015 | Permit id: 600819 | |||||
SCORE 93 Install (1) hvac system with ductwork Date: August 13, 2015 Contractor: Green Way Solutions Inc Client: Hanes Christopher B | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 20, 2015 | Permit id: 631783 | |||||
Proposed new construction three story with cellar. The building will have one commercial unit located at the front portion of the building on the 1st floor and cellar levels. The building will have (2) residential units, one located at the front of the 2nd fl and the entire 3rd floor. Proposed roof top deck accessed by a pilot house that is used for stair access only. Certificate of occupancy is required for commercial space prior to occupancy Date: September 3, 2015 Client: New Bridge Foundation Llc | Permit type: New construction permit | Permit status: Completed | Completion date: November 22, 2016 | Permit id: 629630 | |||||
For the erection of an attached structure(maximum height nte 38 feet) with a roof deck above accessed by a pilot house (for roof access only) for use as two dwelling units with one accessory off street parking space accessed from a rear street. Date: August 24, 2015 Permit type: Zoning/use permit | Permit status: Completed | Completion date: August 24, 2015 | Permit id: 633552 | |||||
SCORE 89 Install a 400amp service with new wiring,lights,outlets,switches,fixtures,smokes and co detectors as per 2008 nec (east district) Date: January 27, 2016 Contractor: Affinity Technologies Inc Client: New Bridge Foundation Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 658590 | |||||
SCORE 100 Install new auto wet sprinkler throughout per nfpa 13 and 13r, 2", fdc Date: February 10, 2016 Contractor: Oneida Fire Protection Client: New Bridge Foundation Llc | Permit type: Suppression permit | Permit status: Completed | Completion date: October 8, 2016 | Permit id: 663189 | |||||
For a new 3 story, 3 unit mixed use bldg with cellar, roof top deck, and a rear deck at the 2nd floor level. A commercial unit will be located at the front portion of the 1st floor and cellar. One residential unit will be located at the front portion of the 2nd floor and all of the 3rd floor. The roof top deck will only be accessed by residential unit #2. Also proposed is a 4 tall fence around perimeter. Date: June 16, 2015 Client: New Bridge Foundation Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 16, 2015 | Permit id: 615551 | |||||
SCORE 93 Complete demo Date: December 12, 2014 Contractor: Rlc Contractors Inc Client: New Bridge Foundation Llc | Permit type: Zoning/use permit | Permit status: Completed | Completion date: December 12, 2014 | Permit id: 576764 | |||||
SCORE 93 For the complete demolition of an existing building. All construction must be in compliance with code bulletin no. B-1302. Full sidewalk closure required as reflected on approved site plan and in accordance with section 3306 of the ibc. Separate street closure permit required prior to start of work. Any deviation will require an amended building permit. 21 day notification to adjacent property owners to be waived as per section a-303. 2 of the phila administrative code. Date: December 12, 2014 Contractor: Rlc Contractors Inc Client: New Bridge Foundation Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: May 16, 2015 | Permit id: 576761 | |||||
Certificate of occupancy for first floor and cellar shell commercial space for a business and professional office with maximum 6 employees as per approved plans. Existing building fully sprinklered. No alterations on this permit. Date: April 27, 2017 Client: New Bridge Foundation Llc | Permit type: Administrative permit | Permit status: Active | Completion date: November 22, 2017 | Permit id: 770020 | |||||
SCORE 100 Install a new complete plumbing system inside building (sfd) Date: October 3, 2014 Contractor: T Shannon Conaboy Plumbing And He Client: Hanes Christopher B | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 17, 2016 | Permit id: 566108 | |||||
SCORE 100 Rough in and finish plumbing for 5 full baths half bath - 6 water closets, 6 lavy sinks, 5 tubs, 2 washers and 2 kithcen sinks. - the installation will compy with the philadephia plubming code 2004 Date: February 8, 2016 Contractor: Wayne Williams Jr Permit type: Plumbing permit | Permit status: Completed | Completion date: July 7, 2016 | Permit id: 668564 | |||||
SCORE 96 New construction: new 3- gang, 200a service, 90-outlets, 1 light fixtures, switches, 14- 120v interconnected smoke detectors... In accordance with 2008 nec for a two family building Date: February 18, 2016 Contractor: Sfb Wiring Systems Llc Permit type: Electrical permit | Permit status: Completed | Completion date: July 7, 2016 | Permit id: 670034 | |||||
SCORE 100 Install (3) hvac systems with ductwork. (mixed use) Date: March 22, 2016 Contractor: Above And Below Heating And Air Client: New Bridge Foundation Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: October 8, 2016 | Permit id: 678149 | |||||
SCORE 100 Install 1 new fire alarm system including pullstations,strobes,horns,strobe horns,panels as per nfpa 72 Date: May 25, 2016 Contractor: Tech Electric Services Inc Client: New Bridge Foundation Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: October 28, 2016 | Permit id: 685841 | |||||
New construction for a sfd. Date: June 18, 2014 Client: Hanes Christopher B | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 18, 2014 | Permit id: 541595 | |||||
New construction of a three story, flat roofed sfd, with partial cellar, and upper level roof deck with access via pilot house. Construction as per plans approved under ap# 549322. Date: September 16, 2014 Client: Hanes Christopher B | Permit type: New construction permit | Permit status: Completed | Completion date: September 17, 2015 | Permit id: 561356 | |||||
For the relocation of lot lines to create five(5) lots from five(5) opa accounts. Date: June 3, 2014 Client: Hanes Christopher B | Permit type: Zoning permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 539277 | |||||
SCORE 100 Install a new residential fire sprinkler system (rfss) in accordance with nfpa 13d and l&i code bulletin 1001-r with a common 1" underground service that feeds both the fire and domestic water systems. See ap #666121 for plans. Date: February 11, 2016 Contractor: Metropolitan Fire Protection Permit type: Suppression permit | Permit status: Completed | Completion date: July 7, 2016 | Permit id: 667808 | |||||
SCORE 89 Installation of (2) 40,0 btu 95% gas furnace with 2 ton a c with all required ductwork ez permit ductwork & warm-air appliances- for the installation of new ductwork, registers grilles diffusers, and warm-air appliances as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: March 17, 2016 Contractor: Sanks Mechanical Permit type: Mechanical permit | Permit status: Completed | Completion date: July 7, 2016 | Permit id: 677225 | |||||
For a business and professional office from cellar thru first floor in the same building with existing two(2) family household living above. No sign on this application. Date: March 28, 2017 Client: New Bridge Foundation Llc | Permit type: Use permit | Permit status: Completed | Completion date: March 28, 2017 | Permit id: 769988 | |||||
SCORE 100 Lateral,ct,fai,water distribution pa20143440136 (sfd)"self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: December 10, 2014 Contractor: Cullinan Plumbing And Heating Ll Client: Hanes Christopher B | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 15, 2015 | Permit id: 578974 | |||||
SCORE 100 New construction: interior plumbing for mixed use 3-story building with (1) commercial unit and (2) residential units. Exterior plumbing which includes a curb trap, 5-inch sewer lateral, & 1-inch domestic water service. All work to comply with the philadelphia plumbing code, 2004. Self certifications are no longer permitted & all excavations & plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection. A separate permit is required for the backflow prevention containment device. Date: February 12, 2016 Contractor: Tommys Plumbing Client: New Bridge Foundation Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 8, 2016 | Permit id: 654292 |