Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Hvac change out - fau or wall heater - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: July 14, 2016 Contractor: Complete Comfort And Maintenance Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 96 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 200a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 12, 2016 Contractor: Zero Energy Contracting Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 99 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: August 19, 2016 Contractor: Advanced Comfort Solutions Inc Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 72 - 17 sqft re-roof for (e) sfd if a re-roof project is proposed, the following specifications apply. Existing roofing material asphalt proposed roofing material asphalt manufacturer owens corning brand and model color (if cool roof required) yes built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 15, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: September 16, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- |