Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace existing building fire alarm system Date: October 19, 2012 Client: Roman Catholic Archbishop Of Washington Dc | Applicant: Rick Farrell Salsbury Electric Co., Inc. | Permit type: Addition alteration | Permit status: Permit issued | Permit id: B1300731 | |||||
Electrical Date: July 13, 2012 Client: Roman Catholic Archbishop Of Washington | Applicant: Dennis R. Woode; Raymond A Wycoff | Permit status: Permit issued | Permit id: E1207643 | |||||
We will perform two soil borings on the proposed site. The boring will be advanced to a depth of 25 feet, and will be located within the bounds of the property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The boring will be performed utilizing an atv- mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the boring will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Date: July 24, 2013 Client: Roman Catholic Archbishop Of Washington | Applicant: Ecs Mid-Atlantic | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300287 | |||||
The school is proposing a complete renovation of the upper school existing classroom areas to create more efficient floor plans with classroom that better serve the size of the existing classes and that incorporate modern technologies. New bathrooms and an elevator serving all three floor are proposed to be constructed within the renovated areas. Because of the limited work duration imposed by the school year cycle, the work is proposed to be constructed in two phases, with the theater reconstruction and new classroom being constructed in the summer of 2014 and the interior renovation including new bathroom and elevator being constructed in the summer of 2015. Date: June 26, 2014 Client: Archdiocese Of Washington Holy Trinity School | Applicant: Douglas Foster | Permit type: Alteration and repai | Permit status: Completed | Permit id: B1310967 | |||||
Demolition only Date: June 13, 2014 Client: Archiocese Of Washington Holy Trinity School | Applicant: Douglas Foster | Permit type: Demolition | Permit status: Permit issued | Permit id: D1400422 | |||||
Mechanical Date: December 11, 2014 Client: Roman Catholic Archbishop Of Washington | Applicant: George Barberoglou | Permit status: Completed | Permit id: M1500643 | |||||
SCORE 59 Electrical Date: July 13, 2012 Contractor: Dennis R. Woode; Raymond A Wycoff Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: E1207643 | |||||
SCORE 56 Electrical Date: July 13, 2012 Contractor: Dennis R. Woode Raymond A Wycoff Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: E1207643 | |||||
SCORE 88 Mechanical Date: December 11, 2014 Contractor: George Barberoglou Client: Roman Catholic Archbishop Of Washington | Permit status: Completed | Permit id: M1500643 | |||||
Plumbing and gas Date: August 28, 2014 Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1408195 | |||||
SCORE 56 Replace existing building fire alarm system Date: October 19, 2012 Contractor: Rick Farrell Salsbury Electric Co. Inc Client: Roman Catholic Archbishop Of Washington Dc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1300731 | |||||
SCORE 88 Mechanical Date: December 11, 2014 Contractor: George Barberoglou Client: Roman Catholic Archbishop Of Washington | Permit status: Completed | Permit id: M1500643 | |||||
Plumbing and gas Date: August 28, 2014 Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1408195 | |||||
SCORE 88 Mechanical Date: December 11, 2014 Contractor: George Barberoglou Client: Roman Catholic Archbishop Of Washington | Permit status: Completed | Permit id: M1500643 | |||||
Plumbing and gas Date: August 28, 2014 Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1408195 | |||||
SCORE 83 We will perform two soil borings on the proposed site. The boring will be advanced to a depth of 25 feet, and will be located within the bounds of the property. The borings will be drilled utilizing 3. 25-inch hollow stem, continuous flight augers. The boring will be performed utilizing an atv- mounted drill rig and will generate an approximate 6-inch annulus. After geotechnical exploration is completed, the boring will be backfilled with bentonite slurry, which has a consistency of two pounds bentonite powder to one gallon water. Date: July 24, 2013 Contractor: Ecs Midatlantic Client: Roman Catholic Archbishop Of Washington | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300287 | |||||
SCORE 99 The school is proposing a complete renovation of the upper school existing classroom areas to create more efficient floor plans with classroom that better serve the size of the existing classes and that incorporate modern technologies. New bathrooms and an elevator serving all three floor are proposed to be constructed within the renovated areas. Because of the limited work duration imposed by the school year cycle, the work is proposed to be constructed in two phases, with the theater reconstruction and new classroom being constructed in the summer of 2014 and the interior renovation including new bathroom and elevator being constructed in the summer of 2015. Date: June 26, 2014 Contractor: Douglas Foster Client: Archdiocese Of Washington Holy Trinity School | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1310967 | |||||
SCORE 99 Demolition only Date: June 13, 2014 Contractor: Douglas Foster Client: Archiocese Of Washington Holy Trinity School | Permit type: Demolition | Permit status: Permit issued | Permit id: D1400422 | |||||
SCORE 56 Replace existing building fire alarm system Date: October 19, 2012 Contractor: Rick Farrell Salsbury Electric Co., Inc Client: Roman Catholic Archbishop Of Washington Dc | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1300731 | |||||
SCORE 59 Electrical Date: July 13, 2012 Contractor: Dennis R. Woode; Raymond A Wycoff Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: E1207643 | |||||
Plumbing and gas Date: August 28, 2014 Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: P1408195 | |||||
SCORE 88 Mechanical Date: December 11, 2014 Contractor: George Barberoglou Client: Roman Catholic Archbishop Of Washington | Permit status: Completed | Permit id: M1500643 | |||||
SCORE 62 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilelsda8p458nybc%2ffe1vbtr Date: October 21, 2015 Client: Archidiocess Of Washington Holy Trinity School | Permit type: Electrical | Permit status: Completed | Permit id: E29388249 | |||||
SCORE 84 Type of elevator :one (1) electrical /steel/center/ passenger Date: June 15, 2015 Contractor: John Denny Client: Archdiocese Of Washington Holy Trinity School | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1502184 | |||||
SCORE 62 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildesthkgawal3tfu0iuiigg Date: October 21, 2015 Client: Archdiocese Of Washington Holy Trin Archdiocese Of Washington Ho | Permit type: Plumbing and gas | Permit status: Completed | Permit id: P66408627 | |||||
SCORE 96 Electrical Date: March 31, 2015 Contractor: David C. Williams Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: E1504511 | |||||
SCORE 96 Electrical Date: March 31, 2015 Contractor: David C. Williams Client: Roman Catholic Archbishop Of Washington | Permit status: Permit issued | Permit id: E1504511 |