Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 Two secondary bathroom remodels, remove (e) shower, toilet, lav. At ba Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12016-30000-040 | |||||
SCORE 77 Supplemental to permit# 12016-30000-04003 to revise scope of work to Date: March 6, 2012 Contractor: Kevin Roach Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12016-30001-040 | |||||
SCORE 84 Pv1 install roof mounted pv system sized 9. 84kw interconnected with ma Date: July 18, 2014 Contractor: Hovsep Hovhannisyan Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194 | |||||
SCORE 84 Pv1 install roof mounted pv system sized 9. 84kw interconnected with ma Date: July 18, 2014 Contractor: Hovsep Hovhannisyan Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194 |