Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Sidewalk deposit during demolition and future erection of a new structure on the site.; this is not a permit to occupy excavate and /or install driveway openings; - separate permits are required.; deposit will be held until;construction is completely finished and the site is in walk-away condition.; upon written request a pwd engineer will inspect the site to verify that the restore sidewalk meets ada and city standards.; permit fee 60. 00; inspection:; 100. 00;deposit; ;6 640. 00 Date: January 20, 2016 Client: Chestnut Hill 99 Llc | Permit type: Sidewalk deposit | Permit id: Sdep-554709 | Parcel: 2102551000 | |||||
Abandon gas service for demo; (sdep-554709); 5 x 4 rdwy; 9:30am-3:30pm; mon thru sat; boston police detail area d; 343-4210; (1) Date: February 1, 2016 Client: Chestnut Hill 99 Llc | Permit type: Excavation permit | Expiration date: March 1, 2016 | Permit id: Exca-558921 | Parcel: 2102551000 | |||||
Eight to ten test borings will be drilled on the property. Depth will range from 15 to feet. The purpose is for subsurface investigation to develop foundation recommendations for a future building. Date: January 23, 2015 Value: $20,000 Client: Chestnut Hill 99 Llc | Permit type: Short form bldg permit | Expiration date: July 23, 2015 | Current use: Vacld | Permit id: Sf443261 | Parcel: 2102551000 | |||||
Transport 1 oversized load 9:30am-3:30pm Date: September 22, 2016 Client: Boston Redevelop Authority | Permit type: Street occupancy permit | Expiration date: September 23, 2016 | Permit id: Occu-639634 | Parcel: 2102551000 | |||||
Sidewalk deposit during demolition and future erection of a new structure on the site.; this is not a permit to occupy excavate and or install driveway openings; - separate permits are required.; deposit will be held until;construction is completely finished and the site is in walk-away condition.; upon written request a pwd engineer will inspect the site to verify that the restore sidewalk meets ada and city standards.; permit fee 60. 00; inspection:; 100. 00;deposit; ;6 640. 00 Date: January 20, 2016 Client: Boston Redevelop Authority | Permit type: Sidewalk deposit | Permit id: Sdep-554709 | Parcel: 2102551000 | |||||
Cut &; cap existing water &; sewer for demo ; (3); 5 x 5 street only; (money on deposit for sdwk); 9:30am-3:30pm; boston police detail area d; 343-4210; jackies law permit on file; no street sdwk closure; eric cavaliere; he-140662; exp 10 15 20-17 Date: April 4, 2017 Client: Boston Redevelop Authority | Permit type: Excavation permit | Expiration date: April 30, 2017 | Permit id: Exca-695102 | Parcel: 2102551000 | |||||
SCORE 56 Jewish community housing for the elderly -; erect a new 7 story steel and wood framed building with new driveway and associated site improvements. There will be a retail / commercial space on the ground level.; there will be 68 one-bedroom affordable apartments built above. Date: October 22, 2015 Contractor: Jessica Boatright Client: Boston Redevelop Authority | Permit type: Board of appeals | Expiration date: October 22, 2017 | Current use: Multi | Permit id: Boa472319 | Parcel: 2102551000 | |||||
SCORE 86 Demolish the entire existing wood framed condemned building and foundation remove all walls floors ceilings roof and concrete foundation Date: June 20, 2017 Contractor: Dana Marcotte Client: Boston Redevelop Authority | Permit type: Bfd construction demo reno | Permit id: Fdc720982 | Parcel: 2102551000 | |||||
SCORE 86 Temporary placement of dumpster for debris removal Date: June 22, 2017 Contractor: Dana Marcotte Client: Boston Redevelop Authority | Permit type: Bfd temporary dumpster | Permit id: Td720981 | Parcel: 2102551000 | |||||
SCORE 82 Bfd asbestos removal Date: July 20, 2017 Contractor: Nolberto Galicia Client: Boston Redevelop Authority | Permit id: Asb733455 | Parcel: 2102551000 |