Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Electrical permit Date: May 4, 2016 Client: Dimopoulos Antonios Sophia | Permit status: Active | Permit id: 689479 | |||||
Electrical permit Date: May 23, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 538807 | |||||
Plumbing permit Date: May 21, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 538207 | |||||
Use permit Date: May 12, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 535322 | |||||
Alteration permit Date: May 12, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 523428 | |||||
Mechanical permit Date: October 27, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 570444 | |||||
Mechanical permit Date: October 27, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 570444 | |||||
Electrical permit Date: May 4, 2016 Client: Dimopoulos Antonios Sophia | Permit status: Expired | Permit id: 689479 | |||||
Plumbing permit Date: May 30, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 538890 | |||||
Use permit Date: May 12, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 535322 | |||||
Alteration permit Date: May 12, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 523428 | |||||
Electrical permit Date: June 9, 2014 Client: Dimopoulos Antonios Sophia | Permit status: Completed | Permit id: 540305 | |||||
SCORE 100 Replace riser to 2nd 3rd floors, 100a panel & 4 120v circuits. Date: May 23, 2014 Contractor: Matthew Maiolino Client: Mopoulos Antonios Sophia | Permit type: Electrical permit | Permit status: Completed | Completion date: March 30, 2016 | Permit id: 538807 | |||||
SCORE 100 1st floor hair salon electrical alterations - installing all outlets, switches and customer supplied luminaires - existing circuits being reused - all work will comply with the 2008 nec Date: June 9, 2014 Contractor: Mecca Electric Inc Client: Mopoulos Antonios Sophia | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 540305 | |||||
SCORE 100 Install drains and waterlines for (4)hair sinks, (3)wash sinks, handicap lav sink, handicap water closet and a washer Date: May 30, 2014 Contractor: All Pro Plumbing Client: Mopoulos Antonios Sophia | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 13, 2015 | Permit id: 538890 | |||||
SCORE 100 2-curb traps & fai (mixed use) pa20141821751 self-cerifications are no longer permitted - all excavations & plumbing trenches in excess of 5 in depth must have approved shoring in place at the time of inspection Date: July 3, 2014 Contractor: Excel Plumbing Heating Ac Inc Client: Mopoulos Antonios Sophia | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 15, 2014 | Permit id: 547291 | |||||
SCORE 90 Installation of 5 carrier hvac units, 92% efficiency 45,0 btu & 2 ton a c units. Out door units to be located at grade at rear of prperty as per historical approval. No work changes to exterior or windows doors as per historical commission. Installation of mechanical equipment. All equipment and associated duct work is to be installed entirely within the same dwelling unit with no penetrations of fire rated assemblies and installed as per manufactures specifications. Installation must meet the code requirements of the international mechanical code and the international energy conservation code. Date: October 27, 2014 Contractor: Taylor Jeffrey Client: Mopoulos Antonios Sophia | Permit type: Mechanical permit | Permit status: Completed | Completion date: September 21, 2016 | Permit id: 570444 | |||||
SCORE 87 For level ii alterations to the first floor of an existing building. First floor for use as a hair salon. Alterations to include the erection of partition walls, provide accessiblity and finishing improvements throughout. All work to be done per approved plans. Separate permits required for mechanical, electrical, and plumbing work. Date: May 12, 2014 Contractor: Pendino Construction Client: Mopoulos Antonios Sophia | Permit type: Alteration permit | Permit status: Completed | Completion date: July 29, 2014 | Permit id: 523428 | |||||
SCORE 100 Replacement only of receptacles and lighting and replace panels in 2 units 3r & 2f (mixed use)cc district Date: May 4, 2016 Contractor: Matthew Maiolino Client: Mopoulos Antonios Sophia | Permit type: Electrical permit | Permit status: Expired | Completion date: May 4, 2016 | Permit id: 689479 | |||||
For the use of personal services on the first floor with a multi family householding living on the second through fourth floor as previously approved in an existing building. Size and location as shown per application plan. Please refer to ap#523428 for approved plans. Date: May 12, 2014 Client: Mopoulos Antonios Sophia | Permit type: Use permit | Permit status: Completed | Completion date: May 12, 2014 | Permit id: 535322 | |||||
SCORE 100 1" & 3 4 water serv, install tub toilet, van & kit 2nd floor & drain & fix 1st floor powder room (mixed use) self-cerifications are no longer permitted - all excavations & plumbing trenches in excess of 5 in depth must have approved shoring in place at the time of inspection Date: May 21, 2014 Contractor: John De Stefano Client: Mopoulos Antonios Sophia | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 13, 2015 | Permit id: 538207 |