Building Permits at 1304 S Foothill Dr Salt Lake City, UT 84108 2321


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1304 S Foothill Dr Salt Lake City, UT 84108 2321 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
100
Furnish and place dump truck in driveway as close to roof eave as possible, permission assumed unless otherwise instructed. Place tape and tarps on ground around perimeter of building to ensure a safe work area. Removal and disposal of 1 layer of 68 sq. Ft of existing metal roofing. Remove tarps and all debris from ground. Magnetic sweep of nails on ground. Clean out roof gutters. Pitch: 6 12 occupants should remove any objects that could fall due to vibrations telegraphed through the structure while roofing work is conducted. Typical objects include pictures on walls or loose light fittings. Install a layer of 7 16 inch wafer board decking over existing plywood. This will cover over existing internal rain gutter system that has caused considerable damage to structure through leakage. Degree color-clad drip edge installed around perimeter. Ice and water shield installed on eaves up 6 feet (2 courses) and a 40" wide roll installed in valleys. Ice and water shield turned up against wall
Date:  February 25, 2013

Permit type: Roofing | Permit status: Completed | Completion date: February 28, 2013 | Current use: Commercial | Permit id: Bld2013-01055
2013/02/2501001304 S Foothill Dr Salt Lake City, Ut 84108 2321Far West Roofing Inc
SCORE
64
Furnish and place dump truck in driveway as close to roof eave as possible, permission assumed unless otherwise instructed. Place tape and tarps on ground around perimeter of building to ensure a safe work area. Removal and disposal of 1 layer of 68 sq. Ft of existing metal roofing. Remove tarps and all debris from ground. Magnetic sweep of nails on ground. Clean out roof gutters. Pitch: 6/12 occupants should remove any objects that could fall due to vibrations telegraphed through the structure while roofing work is conducted. Typical objects include pictures on walls or loose light fittings. Install a layer of 7/16 inch wafer board decking over existing plywood. This will cover over existing internal rain gutter system that has caused considerable damage to structure through leakage. Degree color-clad drip edge installed around perimeter. Ice and water shield installed on eaves up 6 feet (2 courses) and a 40" wide roll installed in valleys. Ice and water shield turned up against wall
Date:  February 25, 2013

Permit type: Roofing | Permit status: Inspections | Completion date: February 28, 2013 | Current use: Commercial | Permit id: Bld2013-01055
2013/02/250641304 S Foothill Dr Salt Lake City, Ut 84108 2321Far West Roofing Inczions Bank Foothill Office
SCORE
64
Furnish and place dump truck in driveway as close to roof eave as possible, permission assumed unless otherwise instructed. Place tape and tarps on ground around perimeter of building to ensure a safe work area. Removal and disposal of 1 layer of 68 sq. Ft of existing metal roofing. Remove tarps and all debris from ground. Magnetic sweep of nails on ground. Clean out roof gutters. Pitch: 6 12 occupants should remove any objects that could fall due to vibrations telegraphed through the structure while roofing work is conducted. Typical objects include pictures on walls or loose light fittings. Install a layer of 7 16 inch wafer board decking over existing plywood. This will cover over existing internal rain gutter system that has caused considerable damage to structure through leakage. Degree color-clad drip edge installed around perimeter. Ice and water shield installed on eaves up 6 feet (2 courses) and a 40" wide roll installed in valleys. Ice and water shield turned up against wall
Date:  February 25, 2013

Permit type: Roofing | Permit status: Inspections | Completion date: February 28, 2013 | Current use: Commercial | Permit id: Bld2013-01055
2013/02/250641304 S Foothill Dr Salt Lake City, Ut 841082321Far West Roofing Inczions Bank Foothill Office
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?