Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 The project consists of non-vertical enabling work in preparation for construction of the phase 1 building of the pier 4 project located adjacent to seaport boulevard and northern avenue at the southern end of the pier. Work includes: 1. Repair of the existing seawall along the east side of the pier including placement of toe sheeting and concrete grade beam to stablize the wall and resetting of the existing granite blocks; and 2. Installation of piles floats and ramp in connection with the water commons feature of the project. Digsafe #20121405693 - diposal location northside carting inc. 2 holt rd. N. Andover - evirn. Sanitation #economy pest control inc . 617-361-5221. Permit type: Other | Permit status: Expired | Current use: Other | Permit id: Alt137577 | |||||
SCORE 79 Installtelephone duct bamk Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv162930 | |||||
SCORE 69 Continuation of current use. Pay outdoor parking for 3 vehicles. Permit type: Commercial parking | Permit status: Expired | Current use: Comm | Permit id: U4982653 | |||||
SCORE 79 Install primary that are being relocated for a new building. Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E162906 |