Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Hyde, taletha ![]() Permit status: Closed | Permit id: 11-03347 | |||||
SCORE 100 Hyde, taletha Client: Hyde Mobile Home | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-03347 | Parcel: 20106 | |||||
SCORE 100 Hyde, taletha Client: Hyde Mobile Home | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-03347 | Parcel: 20106 | |||||
June 14, 2011 12:14:18 pm heatherr. Residential mobile home for taletha hyde to move used mobile home into park lot #13 with electrical and plumbing; call redacted phone number for inspection har location: take i2 to 19/23 turn onto louisiane ave right onto moss wood.; july 6, 2011 1:28:11 pm kneel. Used mobile home into park lot #13; 1 for 1 replacement of existing mobile home with newer mobile home in established park. Approved - no additional conditions; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sid Permit type: Permits - historical | Permit status: Closed | Permit id: 11-03347 | Parcel: 20106 | |||||
Hyde, taletha ![]() ![]() Permit type: Historical | Permit status: Closed | Permit id: 11-03347 | |||||
June 14, 2011 12:14:18 pm heatherr. Residential mobile home for taletha hyde to move used mobile home into park lot #13 with electrical and plumbing; call redacted phone number for inspection har location: take i2 to 19 23 turn onto louisiane ave right onto moss wood.; july 6, 2011 1:28:11 pm kneel. Used mobile home into park lot #13; 1 for 1 replacement of existing mobile home with newer mobile home in established park. Approved - no additional conditions; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sid ![]() Permit type: Permits - historical | Permit status: Closed | Permit id: 11-03347 | Parcel: 20106 |