Alteration permit Date: August 1, 2013 Client: Edwards Janene | Permit status: Completed | Permit id: 486633 | |||||
Plumbing permit Date: February 10, 2012 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 387535 | |||||
Electrical permit Date: September 8, 2016 Client: Duffy Thomas | Permit status: Active | Permit id: 720502 | |||||
Electrical permit Date: July 19, 2007 Client: Dunbar Hard Mary | Permit status: Completed | Permit id: 90358 | |||||
Zoning use permit Date: September 16, 2011 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 359109 | |||||
Electrical permit Date: April 19, 2012 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 400193 | |||||
Alteration permit Date: August 19, 2016 Client: Duffy Thomas | Permit status: Active | Permit id: 716275 | |||||
Electrical permit Date: June 30, 2014 Client: Edwards Janene | Permit status: Completed | Permit id: 545964 | |||||
Plumbing permit Date: June 10, 2014 Client: Edwards Janene | Permit status: Completed | Permit id: 542160 | |||||
Plumbing permit Date: December 17, 2007 Client: Dunbar Hard Mary | Permit status: Completed | Permit id: 122019 | |||||
Mechanical permit Date: May 22, 2012 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 406538 | |||||
New construction permit Date: October 6, 2011 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 367207 | |||||
Suppression permit Date: December 22, 2011 Client: Diffenderfer Elizabeth M Sosa Christhian | Permit status: Completed | Permit id: 376286 | |||||
SCORE 100 200amp service, range, heater, ac line (south dist) Date: September 21, 2007 Contractor: Filippone Alfonso Jr Client: Uffy Thomas | Permit type: Electrical permit | Permit status: Completed | Completion date: March 25, 2008 | Permit id: 104550 | |||||
Ez permit standard alterations - for alterations to an existing one family dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. (all work to be performed by home owner) Date: August 19, 2016 Client: Uffy Thomas | Permit type: Alteration permit | Permit status: Active | Completion date: June 14, 2017 | Permit id: 716275 | |||||
SCORE 100 Install (1) hvac system with ductwork. . Date: March 23, 2017 Contractor: Niels Ac Client: Uffy Thomas | Permit type: Mechanical permit | Permit status: Expired | Completion date: March 28, 2017 | Permit id: 758364 | |||||
SCORE 100 Rewire 1st and 2nd floor,install 18 light fixtures, 26 receptacles, 12 switches, and hardwire smoke and co detectors as per 2008 nec (south district) Date: September 8, 2016 Contractor: Martin Robert Client: Uffy Thomas | Permit type: Electrical permit | Permit status: Expired | Completion date: September 8, 2016 | Permit id: 720502 | |||||
SCORE 100 2-water closet, 2-lavs, 2-tub shower, 1-kit sink, 1-laundry, 1-water heater the installation will comply with the philadelphia plumbing code 2004 Date: March 6, 2017 Contractor: Big Dawgs Plumbing And Heating Client: Uffy Thomas | Permit type: Plumbing permit | Permit status: Expired | Completion date: March 28, 2017 | Permit id: 764474 | |||||
SCORE 100 Install wiring for 1 bathroom and 1 bedroom with 6-recepts,12-lights and 4-switches as per 2008 nec (south district) Date: April 18, 2017 Contractor: Martin Robert Client: Uffy Thomas | Permit type: Electrical permit | Permit status: Expired | Completion date: April 18, 2017 | Permit id: 775970 | |||||
SCORE 99 Replacement 100a service with same..(14 ckt panel)... In accordance with 2008 nec for a one family building Date: June 30, 2014 Contractor: Lion Electrical Client: Edwards Janene | Permit type: Electrical permit | Permit status: Completed | Completion date: October 1, 2014 | Permit id: 545964 | |||||
SCORE 100 Replace stack waste and water line set fixture 1 kitchen sink,1 wc,1 lav sink and 1 bath tub (sfd) Date: June 10, 2014 Contractor: Norman Cole Sr, Client: Edwards Janene | Permit type: Plumbing permit | Permit status: Completed | Completion date: April 19, 2016 | Permit id: 542160 | |||||
Applicant agrees to limit the construction to comply with ez permit standard for interior alterations, dated january 2011. Deviations from this standard will result in the revocation of this permit and imposition of further penalties." separate permits required for plumbing, electrical and mechanical work Date: August 1, 2013 Client: Edwards Janene | Permit type: Alteration permit | Permit status: Completed | Completion date: April 18, 2016 | Permit id: 486633 | |||||
SCORE 79 Replace defective receptacles (10), 1st and 2nd floor. Replace light and switch (3), 2nd floor. Replace 1 amp service, basement. (south dist) Date: July 19, 2007 Contractor: Kedar Corporation Client: Unbar Hard Mary | Permit type: Electrical permit | Permit status: Completed | Completion date: November 12, 2008 | Permit id: 90358 | |||||
SCORE 100 Yard drain, kitchen sink faucet, waste, trap, strainer, stand pipe,19" vanity, handicap toilet Date: December 17, 2007 Contractor: Edward Hughes And Sons Inc Client: Unbar Hard Mary | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 21, 2008 | Permit id: 122019 | |||||
SCORE 100 Rough plumbing and set fixtures for 3wc,2 tubs,3 lav sinks,1 ks,1 laundry bx heater (sfd) Date: November 14, 2012 Contractor: Garry Dabney Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 5, 2013 | Permit id: 437948 | |||||
SCORE 100 Install 1 goodman hvac unit (90,0 btus) Date: May 22, 2012 Contractor: Rosenberg Neil Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 1, 2013 | Permit id: 406538 | |||||
SCORE 100 Install 200a serv, cir mb panl, instl grounding, 120v circ, refrig, disposal, micro, 2 kit gfci, 3 bedrm & liv rm recpts, 3 light, bath gfci, heater, 240v ac condensor, 120v smoke co2 det throughout, all devices tamp res, all breaker arc fault as per 2008 nec(south dist) sfd Date: April 19, 2012 Contractor: Baldwin Electrical Const Llc Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Electrical permit | Permit status: Completed | Completion date: February 8, 2013 | Permit id: 400193 | |||||
SCORE 100 1" water dist, 5" lateral, 5" curb trap, and house drain(sfd) Date: February 10, 2012 Contractor: Garry Dabney Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Plumbing permit | Permit status: Completed | Completion date: February 24, 2012 | Permit id: 387535 | |||||
SCORE 100 Installation new sprinkler service - 13d, 1" Date: December 22, 2011 Contractor: B. M. Consulting Services Inc Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Suppression permit | Permit status: Completed | Completion date: March 1, 2013 | Permit id: 376286 | |||||
New construction, scattered sites 8 new attached and semi detached single family dwelling structures, as per plans. No underpinning proposed or approved of by this office. Must adequately brace and protect adjacent foundations and walls. Building fully sprinklered. Date: October 6, 2011 Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: New construction permit | Permit status: Completed | Completion date: February 25, 2013 | Permit id: 367207 | |||||
For the new construction of a 3 story, attached sfd with full cellar and a roof deck above 2nd floor roof with railings, 6 high ornamental fence, sidewalk and curb replacment. Bay windows and concrete steps. Date: September 16, 2011 Client: Ffenderfer Elizabeth M Sosa Christhian | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 16, 2011 | Permit id: 359109 |