Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Remove existing shingles and re-roof single-family residence with 50-yr. Dimensional shingles. 42 squares, roof pitch represented by contractor to be 6:12. Date: July 30, 2010 Contractor: Van Lier Roofing Inc Client: Shirley Long | Applicant: Van Lier Roofing Inc | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family d | |||||
SCORE 100 After the fact permit, repair damaged roadway caused by heavy haul crane while working on substation. Date: August 5, 2015 Contractor: Xcel Energy Client: Shirley Long | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Remove existing shingles and re-roof single-family residence with 50-yr. Dimensional shingles. 42 squares, roof pitch represented by contractor to be 6:12. Client: Shirley Long | Permit type: Roofing | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-03182 | |||||
After the fact permit, repair damaged roadway caused by heavy haul crane while working on substation. Date: August 5, 2015 Client: Shirley Long | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2015-03291 |