SCORE 100 Steel plate- single location Date: April 30, 2017 Contractor: William Washington Permit status: Expired | Expiration date: May 5, 2017 | Permit id: Pa10398121 | |||||
SCORE 98 Steel plate- single location Date: May 22, 2017 Contractor: Robert Major Permit status: Expired | Expiration date: May 26, 2017 | Permit id: Pa10401867 | |||||
SCORE 100 1. Abandonment removal of small sewer lateral connected to the existing sewer main in the alley. 2. Abandonment of a small water service lateral connected to an existing ; water main in h st ne. . 3. Water tee connection- inspect installation of new 3" fire service connection to existing main Date: June 14, 2017 Contractor: William Washington Permit status: Issued | Expiration date: July 20, 2017 | Permit id: Pa200104 | |||||
SCORE 98 Roll off debris container Date: June 12, 2017 Contractor: Robert Major Permit status: Expired | Expiration date: June 21, 2017 | Permit id: Pa10424689 | |||||
SCORE 98 This is the 2nd phase to tracking number 200104. We are proposing to dig a two feet wide to bring the water service into the building. Date: July 14, 2017 Contractor: Robert Major Client: Saeed Momenia | Permit type: Paving; sidewalk(s) | Permit status: Cancel/withdrawn | Expiration date: August 17, 2017 | Permit id: 0 | |||||
SCORE 98 1. Abandonment removal of small sewer lateral connected to the existing sewer main in the alley. 2. Abandonment of a small water service lateral connected to an existing ; water main in h st ne. . 3. Water tee connection- inspect installation of new 3" fire service connection to existing main Date: July 19, 2017 Contractor: Robert Major Client: Saeed Momenia | Permit type: Excavation; water service lateral abandonment (trench), excavation; sewer service lateral abandonment, excavation; water lateral conn over 2" pipe (trench) | Permit status: Permit expired | Expiration date: September 18, 2017 | Permit id: Pa200104-R1 | |||||
SCORE 98 Proposing to build a temporary ramp for pedestrian to on the sidewalk right of way. Date: August 12, 2017 Contractor: Robert Major Client: Saeed Momenia | Permit type: Projections; ada ramp | Permit status: Assigned | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 98 1. Abandonment removal of small sewer lateral connected to the existing sewer main in the alley. 2. Abandonment of a small water service lateral connected to an existing ; water main in h st ne. . 3. Water tee connection- inspect installation of new 3" fire service connection to existing main Contractor: Robert Major Client: Saeed Momenia | Permit type: Excavation; water service lateral abandonment (trench), excavation; sewer service lateral abandonment, excavation; water lateral conn over 2" pipe (trench) | Permit status: Issued | Expiration date: November 20, 2017 | Permit id: Pa200104-R2 | |||||
SCORE 98 1. Abandonment removal of small sewer lateral connected to the existing sewer main in the alley. 2. Abandonment of a small water service lateral connected to an existing ; water main in h st ne. . 3. Water tee connection- inspect installation of new 3" fire service connection to existing main Date: June 14, 2017 Contractor: Robert Major Client: Saeed Momenia | Permit type: Excavation; water service lateral abandonment (trench), excavation; sewer service lateral abandonment, excavation; water lateral conn over 2" pipe (trench) | Permit status: Issued | Expiration date: July 20, 2017 | Permit id: Pa200104 | |||||
SCORE 98 Paving; sidewalk(s) Contractor: Robert Major Permit status: 3 | Expiration date: August 17, 2017 | Permit id: 0 | |||||
SCORE 98 Projections; ada ramp Contractor: Robert Major Permit status: 12 | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 98 Roll off debris container Date: July 14, 2017 Contractor: Robert Major Permit status: Expired | Expiration date: August 10, 2017 | Permit id: Pa10431154 | |||||
SCORE 98 Steel plate- single location Date: July 14, 2017 Contractor: Robert Major Permit status: Expired | Expiration date: July 20, 2017 | Permit id: Pa10430681-R1 | |||||
SCORE 98 Steel plate- single location Date: July 20, 2017 Contractor: Robert Major Permit status: Expired | Expiration date: July 27, 2017 | Permit id: Pa10453677 | |||||
SCORE 100 Construction staging area Contractor: William Washington Permit status: Approved | Expiration date: October 12, 2017 | Permit id: 0 | |||||
SCORE 88 Proposing to build a temporary ramp for pedestrian to on the sidewalk right of way. Contractor: Bill Washington Permit status: Assigned | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 88 This is the 2nd phase to tracking number 200104. We are proposing to dig a two feet wide to bring the water service into the building. Contractor: Bill Washington Permit status: Cancel/withdrawn | Expiration date: August 17, 2017 | Permit id: 0 | |||||
SCORE 98 Roll off debris container Date: August 14, 2017 Contractor: Robert Major Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa10431154-R1 | |||||
SCORE 100 Construction staging area Date: August 4, 2017 Contractor: William Washington Permit status: Permit expired | Expiration date: August 31, 2017 | Permit id: Pa10453501 | |||||
SCORE 100 Construction staging area Contractor: William Washington Permit status: Approved (pending payment | Expiration date: October 12, 2017 | Permit id: 0 | |||||
SCORE 100 Roll off debris container Date: May 8, 2017 Contractor: William Washington Permit status: Permit expired | Expiration date: May 31, 2017 | Permit id: Pa10398122 |