Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Install (8) glass partition & (4) glass doors (1) sliding door in the back of bldg @ ground floor. ; revision to pa201308235157 & 201308285531; separate ti permit for future tenant. Current use: Office | Permit id: #201311071420 | |||||
Compliance with ordinance no. 155-13 not required. Excavation cu. Yd. Change of use. Change front space use from office to education. Depth only. No work beyond first of space from folsom. Upgrade bathrooms & egress components. ![]() ![]() Current use: School | Permit id: #201312204715 | |||||
SCORE 100 Remove existing windows to left front of bldg glass block and replace with aluminum windows. Current use: Office | Permit id: #201307222474 | |||||
SCORE 100 Replace two windows and 1 door in kind in front of building. No structural changes with aluminum (u factor 0. 4 max) Current use: Office | Permit id: #201307262872 | |||||
SCORE 100 Upgrade handicap bathroom Current use: Office | Permit id: #201308073721 | |||||
SCORE 100 Reroofing Current use: Office | Permit id: #201308073741 | |||||
SCORE 100 Replace garage door to back of bldg - no structural changes. Current use: Office | Permit id: #201308134159 | |||||
SCORE 100 New cafe restaurant bar height counter tops furnishing equipment light fixtures exhaust hood to the roof new door wall and ceiling. ![]() ![]() Current use: Food/beverage h | Permit id: #201308164556 | |||||
SCORE 100 Interior work only-replace (e) wood stairs handrails with new steel stairs & handrails. Replace guardrail at mezzanine level with 42 high steel guardrail. Install door at mezzanine corridor area install glass panels at mezzanine Current use: Office | Permit id: #201308235157 | |||||
SCORE 100 Revision to 201308073721 to reflect as built plan of gr fl plumbing fisture layout and breakrm requested by plumbing inspection. New front door at front entrance Current use: Office | Permit id: #201308285531 | |||||
SCORE 100 Exploration work to remove plaster in walls in restroom; ab-017 applies. Current use: Office | Permit id: #201407252253 | |||||
SCORE 100 Installation of a fire alarm system with a voice communication evac system for e occupancy installed per nfpa 72 codes and standards. Ref 201312204715. Compliance with maher ordinance no 155-13 not required. Current use: Office | Permit id: #201409126257 | |||||
SCORE 95 200amp service panel upgrade. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201308072758 | |||||
SCORE 95 Rear yard container unit office: 3 ckts 3#6 4 lights 3 switches 8 receptacles. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: E20140707961 | |||||
SCORE 95 Amend e201308072758 for additional work scope: upgrade ada bathroom; 1 fan 2 swtches 1 light 1 subpanel in back; replace 8 lights 8 switches emergency lights. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201308273208 | |||||
SCORE 93 Install new restroom light fixtures backup lights plug exhaust fan install new ckt for remodel kitchen with lights relocate (e) subpanel. ![]() ![]() Permit type: Electrical permit | Permit status: Complete | Permit id: E201411054197 | |||||
SCORE 95 Amend e201308273208 for additional work scope and to abate eid nov:201319421 - replace outlet in break room fan in front. Install lights outlets 5 switches. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201309033379 | |||||
SCORE 95 Installation of a manual and automatic fire alarm system with emergency voice communication system for "e"occupancy including fire alarm panel amplifier pull stations smoke detectors heat detectors and notification devices installed per nfpa 72 codes and standards. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20140912681 | |||||
SCORE 100 New cafe restaurant bar height counter tops furnishing equipment light fixtures exhaust hood to the roof new door wall and ceiling. ![]() ![]() Permit type: Building permit | Current use: Food/beverage hndlng | Permit id: #201308164556 | |||||
SCORE 100 Upgrade handicap bathroom Permit type: Building permit | Expiration date: February 7, 2014 | Current use: Office | Permit id: #201308073721 | |||||
SCORE 95 Upgrade bathroom for ada. Replace copper pipes. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130807087 | |||||
SCORE 100 Replace garage door to back of bldg - no structural changes. Permit type: Building permit | Expiration date: February 13, 2014 | Current use: Office | Permit id: #201308134159 | |||||
Compliance with ordinance no. 155-13 not required. Excavation < cu. Yd. Change of use. Change front space use from office to education. Depth only. No work beyond first of space from folsom. Upgrade bathrooms & egress components. ![]() ![]() Permit type: Building permit | Expiration date: August 25, 2015 | Current use: School | Permit id: #201312204715 | |||||
SCORE 100 Reroofing Permit type: Building permit | Expiration date: February 7, 2014 | Current use: Office | Permit id: #201308073741 | |||||
SCORE 100 Revision to 201308073721 to reflect as built plan of gr fl plumbing fisture layout and breakrm requested by plumbing inspection. New front door at front entrance Permit type: Building permit | Expiration date: February 28, 2014 | Current use: Office | Permit id: #201308285531 | |||||
SCORE 100 Interior work only-replace (e) wood stairs handrails with new steel stairs & handrails. Replace guardrail at mezzanine level with 42" high steel guardrail. Install door at mezzanine corridor area install glass panels at mezzanine Permit type: Building permit | Expiration date: August 26, 2014 | Current use: Office | Permit id: #201308235157 | |||||
Compliance with ordinance no. 155-13 not required. Excavation < cu. Yd. Change of use. Change front space use to education. Upgrade bathrooms & egress components. ![]() Permit type: Building permit | Current use: School | Permit id: #201312204715 | |||||
SCORE 100 Work category: 2pb; replacement and install 4" sewer ppipe from house to house trap. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pw20140119359 | |||||
SCORE 100 Work category: 1p; install approx 9 ft of sewer and one house trap ![]() ![]() Permit type: Plumbing permit | Permit status: Complete | Permit id: Pw20140124510 | |||||
SCORE 100 Remove existing windows to left front of bldg glass block and replace with aluminum windows. Permit type: Building permit | Expiration date: November 22, 2013 | Current use: Office | Permit id: #201307222474 | |||||
SCORE 100 Replace two windows and 1 door in kind in front of building. No structural changes with aluminum (u factor 0. 4 max) Permit type: Building permit | Expiration date: January 26, 2014 | Current use: Office | Permit id: #201307262872 | |||||
SCORE 100 Install 2 package (ac) unit on the roof ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pm20130724648 | |||||
SCORE 100 Exploration work to remove plaster in walls in restroom; ab-017 applies. Permit type: Building permit | Expiration date: July 23, 2015 | Current use: Office | Permit id: #201407252253 | |||||
SCORE 93 Install 7 toilets and 5 handsinks in office for bathroom remodel ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20140728749 | |||||
Remove existing windows to left front of bldg glass block and replace with aluminum windows. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 22, 2013 | Expiration date: July 17, 2014 | Current use: Office | Permit id: 201307222474 | |||||
Pizza parlor occupancy tenant improvement ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 14, 1990 | Expiration date: November 3, 1990 | Current use: Retail sales | Permit id: 9009217 | |||||
SCORE 100 Install (8) glass partition & (4) glass doors (1) sliding door in the back of bldg @ ground floor. ; revision to pa201308235157 & 201308285531; separate ti permit for future tenant. Permit type: Building permit | Expiration date: May 7, 2014 | Current use: Office | Permit id: #201311071420 | |||||
SCORE 95 Remove tile; install shower and shower pan. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20131003715 | |||||
SCORE 100 Installation of a fire alarm system with a voice communication evac system for e occupancy installed per nfpa 72 codes and standards. Ref 201312204715. Compliance with maher ordinance no 155-13 not required. Permit type: Building permit | Expiration date: March 15, 2015 | Current use: Office | Permit id: #201409126257 | |||||
Parapet bracing ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: June 6, 1990 | Expiration date: November 6, 1990 | Current use: Printing plant | Permit id: 9011193 | |||||
Reroofing ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 7, 2013 | Expiration date: August 2, 2014 | Current use: Office | Permit id: 201308073741 | |||||
Revision to 201308073721 to reflect as built plan of gr fl plumbing fisture layout and breakrm requested by plumbing inspection. New front door at front entrance ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 28, 2013 | Expiration date: August 25, 2014 | Current use: Office | Permit id: 201308285531 | |||||
Compliance with ordinance no. 155-13 not required. Excavation < cu. Yd. Change of use. Change front space use from office to education. Depth only. No work beyond first of space from folsom. Upgrade bathrooms & egress components. ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: December 20, 2013 | Expiration date: August 9, 2017 | Current use: Office | Permit id: 201312204715 | |||||
Install new acoust. Panels on ceiling. Remove old and install new light fixtures. Install pre-fab walls and doors and room divider. N/a mahner. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 1, 2015 | Expiration date: July 8, 2016 | Current use: School | Permit id: 201507010458 | |||||
Street space and sidewalk repair Permit type: Otc alterations permit | Permit status: Issued | Completion date: January 27, 2014 | Permit id: M459647 | |||||
New cafe restaurant bar height counter tops furnishing equipment light fixtures exhaust hood to the roof new door wall and ceiling. ![]() Permit type: Additions alterations or repairs | Permit status: Withdrawn | Completion date: August 16, 2013 | Current use: Food/beverage hndlng | Permit id: 201308164556 | |||||
Exploration work to remove plaster in walls in restroom; ab-017 applies. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 25, 2014 | Expiration date: July 23, 2015 | Current use: Office | Permit id: 201407252253 | |||||
Install (8) glass partition & (4) glass doors (1) sliding door in the back of bldg @ ground floor. ; revision to pa201308235157 & 201308285531; separate ti permit for future tenant. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: November 7, 2013 | Expiration date: November 2, 2014 | Current use: Office | Permit id: 201311071420 | |||||
Install pizza hood and duct type 2 make up air unit ![]() Permit type: Additions alterations or repairs | Permit status: Complete | Completion date: May 29, 1990 | Expiration date: January 25, 1991 | Current use: Office | Permit id: 9010160 | |||||
Interior work only-replace (e) wood stairs handrails with new steel stairs & handrails. Replace guardrail at mezzanine level with 42" high steel guardrail. Install door at mezzanine corridor area install glass panels at mezzanine ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 23, 2013 | Expiration date: August 21, 2014 | Current use: Office | Permit id: 201308235157 | |||||
Upgrade handicap bathroom ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 7, 2013 | Expiration date: August 2, 2014 | Current use: Office | Permit id: 201308073721 | |||||
Replace two windows and 1 door in kind in front of building. No structural changes with aluminum (u factor 0. 4 max) ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: July 26, 2013 | Expiration date: July 21, 2014 | Current use: Office | Permit id: 201307262872 | |||||
New section 14x14 of floor and 2 walls some electrical addition minor plumbing modification ![]() Permit type: Additions alterations or repairs | Permit status: Cancelled | Completion date: May 14, 2002 | Current use: Office | Permit id: 200205146509 | |||||
Street s[ace Permit type: Otc alterations permit | Permit status: Issued | Completion date: January 21, 2014 | Permit id: M458547 | |||||
Installation of a fire alarm system with a voice communication evac system for e occupancy installed per nfpa 72 codes and standards. Ref 201312204715. Compliance with maher ordinance no 155-13 not required. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: September 12, 2014 | Expiration date: September 10, 2015 | Current use: Office | Permit id: 201409126257 | |||||
Replace garage door to back of bldg - no structural changes. ![]() Permit type: Otc alterations permit | Permit status: Complete | Completion date: August 13, 2013 | Expiration date: August 8, 2014 | Current use: Office | Permit id: 201308134159 | |||||
Install new acoust. Panels on ceiling. Remove old and install new light fixtures. Install pre-fab walls and doors and room divider. N a mahner. ![]() ![]() Permit type: Otc alterations permit | Permit status: Complete | Expiration date: July 1, 2015 | Current use: School | Permit id: 201507010458 | |||||
Installation of a manual and automatic fire alarm system with emergency voice communication system for "e"occupancy including fire alarm panel amplifier pull stations smoke detectors heat detectors and notification devices installed per nfpa 72 codes and standards. Permit status: Complete | Permit id: Ew20140912681 | |||||
Rear yard container unit office: 3 ckts 3#6 4 lights 3 switches 8 receptacles. Permit status: Complete | Permit id: E20140707961 | |||||
Amend e201308072758 for additional work scope: upgrade ada bathroom; 1 fan 2 swtches 1 light 1 subpanel in back; replace 8 lights 8 switches emergency lights. Permit status: Complete | Permit id: E201308273208 | |||||
Install new restroom light fixtures backup lights plug exhaust fan install new ckt for remodel kitchen with lights relocate (e) subpanel. Permit status: Complete | Permit id: E201411054197 | |||||
200amp service panel upgrade. Permit status: Complete | Permit id: E201308072758 | |||||
Amend e201308273208 for additional work scope and to abate eid nov:201319421 - replace outlet in break room fan in front. Install lights outlets 5 switches. Permit status: Complete | Permit id: E201309033379 | |||||
Studio classroom install 11 suspended led fixtures. Install lighting controls and sensors Permit status: Filed | Permit id: Ew20150713501 | |||||
Installing e. M. T electrical wire. Provide conduit and conductors from existing new termination can to the tenant weatherhead. Tie into existing feeders and make splice connections. Demolition of existing overhead feeders to be coordinated with the local utility company. Permit status: Issued | Permit id: E201612281925 | |||||
Removetile;installshowerandshowerpan. ![]() Permit status: Complete | Expiration date: October 3, 2013 | Permit id: Pp20131003715 | |||||
Workcategory:2pb;replacementandinstall4"sewerppipefromhousetohousetrap. ![]() Permit status: Complete | Expiration date: January 19, 2014 | Permit id: Pw20140119359 | |||||
Upgradebathroomforada. Replacecopperpipes. ![]() Permit status: Complete | Expiration date: August 7, 2013 | Permit id: Pp20130807087 | |||||
Amendpp20130807087:installnewgaslinetoroofforfurnace. Breakroom:sink dishwasher. ![]() Permit status: Complete | Expiration date: September 3, 2013 | Permit id: Pp20130903821 | |||||
Workcategory:1p;installapprox9ftofsewerandonehousetrap ![]() Permit status: Complete | Expiration date: January 24, 2014 | Permit id: Pw20140124510 | |||||
Install7toiletsand5handsinksinofficeforbathroomremodel ![]() Permit status: Complete | Expiration date: July 28, 2014 | Permit id: Pp20140728749 | |||||
Install2package(ac)unitontheroof ![]() Permit status: Complete | Expiration date: July 24, 2013 | Permit id: Pm20130724648 | |||||
Amend e201308273208 for additional work scope and to abate eid nov:201319421 - replace outlet in break room fan in front. Install lights outlets 5 switches. Permit status: Complete | Permit id: E201309033379 | |||||
200amp service panel upgrade. Permit status: Complete | Permit id: E201308072758 | |||||
Install new restroom light fixtures backup lights plug exhaust fan install new ckt for remodel kitchen with lights relocate (e) subpanel. Permit status: Complete | Permit id: E201411054197 | |||||
Amend e201308072758 for additional work scope: upgrade ada bathroom; 1 fan 2 swtches 1 light 1 subpanel in back; replace 8 lights 8 switches emergency lights. Permit status: Complete | Permit id: E201308273208 | |||||
Rear yard container unit office: 3 ckts 3#6 4 lights 3 switches 8 receptacles. Permit status: Complete | Permit id: E20140707961 | |||||
Installation of a manual and automatic fire alarm system with emergency voice communication system for "e"occupancy including fire alarm panel amplifier pull stations smoke detectors heat detectors and notification devices installed per nfpa 72 codes and standards. Permit status: Complete | Permit id: Ew20140912681 | |||||
Studio classroom install 11 suspended led fixtures. Install lighting controls and sensors Permit status: Filed | Permit id: Ew20150713501 | |||||
Installing e. M. T electrical wire. Provide conduit and conductors from existing new termination can to the tenant weatherhead. Tie into existing feeders and make splice connections. Demolition of existing overhead feeders to be coordinated with the local utility company. Permit status: Issued | Permit id: E201612281925 | |||||
Remove existing windows to left, front of bldg, glass block and replace with aluminum windows. ![]() ![]() Permit type: Otc alterations permit | Completion date: December 17, 2013 | Expiration date: July 22, 2013 | Current use: Office | Permit id: 201307222474 | |||||
New cafe restaurant, bar height counter tops, furnishing, equipment, light fixtures, exhaust hood to the roof, new door, wall and ceiling. ![]() ![]() Permit type: Additions alterations or repairs | Expiration date: August 16, 2013 | Current use: Food/beverage hndlng | Permit id: 201308164556 | |||||
Interior work only-replace (e) wood stairs, handrails with new steel stairs & handrails. Replace guardrail at mezzanine level with 42" high steel guardrail. Install door at mezzanine corridor area, install glass panels at mezzanine ![]() ![]() Permit type: Otc alterations permit | Completion date: December 17, 2013 | Expiration date: August 23, 2013 | Current use: Office | Permit id: 201308235157 | |||||
Install (8) glass partition, & (4) glass doors, (1) sliding door in the back of bldg @ ground floor. ; revision to pa201308235157 & 201308285531; separate ti permit for future tenant. ![]() ![]() Permit type: Otc alterations permit | Completion date: December 16, 2013 | Expiration date: November 7, 2013 | Current use: Office | Permit id: 201311071420 | |||||
Compliance with ordinance no. 155-13 not required. Excavation < cu. Yd. Change of use. Change front space use from office to education. Depth only. No work beyond first of space from folsom. Upgrade bathrooms & egress components. ![]() ![]() Permit type: Additions alterations or repairs | Completion date: December 23, 2015 | Expiration date: December 20, 2013 | Current use: Office | Permit id: 201312204715 | |||||
Install new restroom light fixtures, backup lights, plug , exhaust fan, install new ckt for remodel kitchen with lights, relocate (e) subpanel. ![]() Permit status: Complete | Completion date: November 19, 2014 | Permit id: E201411054197 | |||||
Installing e. M. T electrical wire. Provide conduit and conductors from existing new termination can to the tenant weatherhead. Tie into existing feeders and make splice connections. Demolition of existing overhead feeders to be coordinated with the local utility company. ![]() Permit status: Issued | Permit id: E201612281925 | |||||
Rear yard container unit office: 3 ckts, 3#6, 4 lights, 3 switches, 8 receptacles. ![]() Permit status: Complete | Completion date: July 28, 2014 | Permit id: E20140707961 | |||||
Installation of a manual and automatic fire alarm system with emergency voice communication system for "e"occupancy including fire alarm panel, amplifier, pull stations, smoke detectors, heat detectors, and notification devices installed pernfpa 72 codes and standards. ![]() Permit status: Complete | Completion date: November 14, 2014 | Permit id: Ew20140912681 | |||||
Amend e201308072758 for additional work scope: upgrade ada bathroom; 1 fan, 2 swtches, 1 light, 1 subpanel in back; replace 8 lights, 8 switches, emergency lights. ![]() Permit status: Complete | Completion date: December 12, 2013 | Permit id: E201308273208 | |||||
200amp service panel upgrade. ![]() Permit status: Complete | Completion date: December 12, 2013 | Permit id: E201308072758 | |||||
Amend e201308273208 for additional work scope and to abate eid nov:201319421 - replace outlet in break room fan in front. Install lights, outlets, 5 switches. ![]() Permit status: Complete | Completion date: December 12, 2013 | Permit id: E201309033379 | |||||
Studio classroom install 11 suspended led fixtures. Install lighting controls and sensors ![]() Permit status: Issued | Permit id: Ew20150713501 | |||||
Upgrade bathroom for ada. Replace copper pipes. ![]() Permit status: Complete | Completion date: December 9, 2013 | Expiration date: August 7, 2013 | Permit id: Pp20130807087 | |||||
Install 2 package (ac) unit on the roof ![]() Permit status: Complete | Completion date: December 30, 2013 | Expiration date: July 24, 2013 | Permit id: Pm20130724648 | |||||
Work category: 1p; install approx 9 ft of sewer and one house trap ![]() Permit status: Complete | Completion date: January 31, 2014 | Expiration date: January 24, 2014 | Permit id: Pw20140124510 | |||||
Work category: 2pb; replacement and install 4" sewer ppipe from house to house trap. ![]() Permit status: Complete | Completion date: March 11, 2014 | Expiration date: January 19, 2014 | Permit id: Pw20140119359 | |||||
Amend pp20130807087: install new gas line to roof for furnace. Break room: sink dishwasher. ![]() Permit status: Complete | Completion date: December 9, 2013 | Expiration date: September 3, 2013 | Permit id: Pp20130903821 | |||||
Install 7 toilets and 5 handsinks in office for bathroom remodel ![]() Permit status: Complete | Completion date: November 14, 2014 | Expiration date: July 28, 2014 | Permit id: Pp20140728749 | |||||
Remove tile; install shower and shower pan. ![]() Permit status: Complete | Completion date: December 9, 2013 | Expiration date: October 3, 2013 | Permit id: Pp20131003715 | |||||
SCORE 93 Installing e. M. T electrical wire. Provide conduit and conductors from existing new termination can to the tenant weatherhead. Tie into existing feeders and make splice connections. Demolition of existing overhead feeders to be coordinated with the local utility company. ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: E201612281925 | |||||
SCORE 95 Studio/classroom install 11 suspended led fixtures. Install lighting controls and sensors ![]() ![]() Permit type: Electrical permit | Permit status: Issued | Permit id: Ew20150713501 | |||||
SCORE 100 Install new acoust. Panels on ceiling. Remove old and install new light fixtures. Install pre-fab walls and doors and room divider. N/a mahner. Permit type: Building permit | Expiration date: July 8, 2016 | Current use: School | Permit id: #201507010458 | |||||
SCORE 95 Amend pp20130807087: install new gas line to roof for furnace. Break room: sink/dishwasher. ![]() ![]() Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20130903821 |