Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Clean up third floor tenant space for show Parcel: 51035 0001 | |||||
SCORE 59 1st floor interior fit up construction. Parcel: 51035 0001 | |||||
SCORE 100 Remove interior office on first floor walls and build new walls per plans dated 7-23-13 Parcel: 51035 0001 | |||||
SCORE 100 Replace windows and add new windows Parcel: 51035 0001 | |||||
SCORE 100 Install new elevator and handicap accessible bathrooms. Must meet requirements of 521 cmr. Specs from elevator company due at rough inspection Parcel: 51035 0001 | |||||
SCORE 100 Ossipee road- on 1st and 2nd floor remove interior office partitions Parcel: 51035 0001 | |||||
SCORE 59 Installation of misc. Tenant fixtures according to floor plan a-1 by cunningham architects dated 10 1 13 Parcel: 51035 0001 | |||||
SCORE 100 Upgrade office for new tenant. Install bathrooms. No exterior work. Parcel: 51035 0001 | |||||
SCORE 100 4th floor: build a to-the ceiling tenant seperation wall for a new tenant Parcel: 51035 0001 | |||||
SCORE 100 1st floor: remove (4) office walls to create open space. Parcel: 51035 0001 | |||||
SCORE 69 Take out existing walls- non load bearing, 8 tall Parcel: 51035 0001 | |||||
SCORE 69 Install (2) bathrooms Parcel: 51035 0001 | |||||
SCORE 100 Telesonic solutions: remove office partitions, upgrade sprinkler system retrofit lighting and reallocate plugs. Parcel: 51035 0001 | |||||
SCORE 56 Interior, roof reenforcing. Fire watch required. Parcel: 51035 0001 | |||||
SCORE 100 Install 2 baths and finish office walls for "setpoint health" Parcel: 51035 0001 | |||||
SCORE 100 Demo of interior office walls Parcel: 51035 0001 | |||||
SCORE 100 Remove interior office partitions and construct 2 new office partition walls Parcel: 51035 0001 | |||||
SCORE 69 Demo one wall 2 doors Parcel: 51035 0001 | |||||
SCORE 80 Remove section of roof and install insulation and a folly adhered 0 inch versico epdm roof Parcel: 51035 0001 | |||||
SCORE 69 Demo 3 closets and build 3 offices. Work w o permit,final cost aff @ close, Parcel: 51035 0001 | |||||
SCORE 74 Interior reno to enlarge cafeteria, add nfpa storage room and two nfpa 45 class c application labs Parcel: 51035 0001 | |||||
SCORE 80 Strip and re roof in kind, back of bldg Parcel: 51035 0001 | |||||
SCORE 100 Interior ofice renovations Parcel: 51035 0001 | |||||
SCORE 74 Interior renovations to develop four control areas as per 7 cmr table 417. 2, within existing facility. These are upgrades to existing areas Parcel: 51035 0001 | |||||
SCORE 88 Microfluidics - cosmetic upgrade Parcel: 51035 0001 | |||||
SCORE 100 Install a new exterior door between and oak st. Parcel: 51035 0001 |