Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Replace furnace, coil and condenser for existing sfd Date: February 24, 2014 Value: $8,894 Permit type: Mechanical : 80 - ac | Permit status: Permit finaled | Completion date: April 22, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 82 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 27, 2014 Contractor: John Lavendar Permit type: Electrical : 8003 - | Permit status: Permit finaled | Completion date: January 31, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Replace furnace, coil and condenser for existing sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 22, 2014 | Permit id: Pds2014-Resalt- | |||||
Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 27, 2014 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 31, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Replace furnace, coil and condenser for existing sfd Permit type: Residential alteration-addn | Permit status: Completed | Completion date: April 22, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 100 Roof mount residential solar pv for existing sfd per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: January 27, 2014 Contractor: Solar West Electric Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: January 31, 2014 | Permit id: Pds2014-Resalt- | |||||
SCORE 89 Re-roof if a re-roof project is proposed, the following specifications apply. Existing roofing material comp shingles proposed roofing material comp shingles manufacturer certain teed brand and model landmark color (if cool roof required) georgetown gray built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: January 31, 2005 Permit status: Pass | Permit id: Pds2004-1004-20 | |||||
Final Date: April 14, 2014 Permit status: Pass | Permit id: Pds2014-Resalt- |