Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: May 3, 2013 Client: Muhammad Mahdi Shabazz | Permit status: Expired | Permit id: 469054 | |||||
Alteration permit Date: May 21, 2014 Client: Muhammad Mahdi Shabazz | Permit status: Completed | Permit id: 527478 | |||||
Zoning permit Date: May 21, 2014 Client: Muhammad Mahdi Shabazz | Permit status: Completed | Permit id: 530558 | |||||
Alteration permit Date: May 21, 2014 Client: Muhammad Mahdi Shabazz | Permit status: Completed | Permit id: 527478 | |||||
Alteration permit Date: May 3, 2013 Client: Muhammad Mahdi Shabazz | Permit status: Expired | Permit id: 469054 | |||||
Alteration permit Date: October 6, 2016 Client: Muhammad Mahdi Shabazz | Permit status: Active | Permit id: 727408 | |||||
Zoning permit Date: May 21, 2014 Client: Muhammad Mahdi Shabazz | Permit status: Completed | Permit id: 530558 | |||||
SCORE 88 Remove tree branch from wall, repair wall and roof make safe. Engineer report may be required by field inspector. Schedule initial inspection with inspector prior to start of work. Date: May 3, 2013 Contractor: Labor Of Love Home Impv And Land Client: Muhammad Mahdi Shabazz | Permit type: Alteration permit | Permit status: Expired | Completion date: December 22, 2015 | Permit id: 469054 | |||||
SCORE 100 Demolition of the rear two story portion of an existing three story attached single family household living structure as per the submitted documentation to create a safe condition. An additional building permit will be required to for any new construction. Call the inspector to comly the violation. Date: May 21, 2014 Contractor: Pedro Palmer Construction Inc Client: Muhammad Mahdi Shabazz | Permit type: Alteration permit | Permit status: Completed | Completion date: August 13, 2014 | Permit id: 527478 | |||||
SCORE 100 Demolition of rear two story structure of an existing three story attached single family household living structure to create a safe condition. An additional zoning permit will be required for any new construction. Date: May 21, 2014 Contractor: Pedro Palmer Construction Inc Client: Muhammad Mahdi Shabazz | Permit type: Zoning permit | Permit status: Completed | Completion date: May 21, 2014 | Permit id: 530558 | |||||
SCORE 88 For work as per engineer? S report to repair reaer and side breezway wall, installation of 2x12 16" on center covered by 5 8 sheathing covered by rubber roof. This will incapsolate rear damaged area. All intwerior work will be performed on building permit to be applied for at a later date this is issued to resolve case 378011. Abutting sidewalk must be closed with fencing a minimum of 6? In height. Separate streets department permit required for sidewalk closure. A separate permit is required for any additional alterations that are not specifically addressed on case 378011. Date: October 6, 2016 Contractor: Labor Of Love Home Impv And Land Client: Muhammad Mahdi Shabazz | Permit type: Alteration permit | Permit status: Completed | Completion date: May 10, 2017 | Permit id: 727408 | |||||
SCORE 88 Make safe ermit repair damed roof remove debris. Per submitted engineer report. Engineer report comfirms after repair to front porch roof strcuture is sufficient to apply for traditional building permit Date: May 25, 2017 Contractor: Labor Of Love Home Impv And Land Client: Muhammad Mahdi Shabazz | Permit type: Alteration permit | Permit status: Expired | Completion date: May 30, 2017 | Permit id: 785959 |