Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Please pay balance due re-roof remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7 16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1 2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing). Date: September 1, 2015 Contractor: Standard Roofing And Construction Permit type: Permit | Permit status: Pass | Completion date: September 2, 2015 | Current use: Residential | Permit id: Bld2015-07080 | |||||
SCORE 61 Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7/16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1/2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a/c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing). Date: September 1, 2015 Permit type: Permit | Permit status: Closed | Completion date: September 9, 2015 | Current use: Residential | Permit id: Bld2015-07080 | |||||
SCORE 61 Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7/16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1/2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a/c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing). Date: September 9, 2015 Contractor: James And Coral Coffeyindalesio Rodriguez Permit status: Closed | Current use: Residential | Permit id: Bld2015-07080 | |||||
SCORE 61 Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7 16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1 2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing). Date: September 1, 2015 Permit status: Closed | Completion date: September 9, 2015 | Current use: Residential | Permit id: Bld2015-07080 |