Building Permits at 1215 N Carousel St Salt Lake City, UT 84116 1607


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1215 N Carousel St Salt Lake City, UT 84116 1607 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
64
Please pay balance due re-roof remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7 16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1 2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing).
Date:  September 1, 2015

Permit type: Permit | Permit status: Pass | Completion date: September 2, 2015 | Current use: Residential | Permit id: Bld2015-07080
2015/09/010641215 N Carousel St Salt Lake City, Ut 84116 1607Standard Roofing And Construction
SCORE
61
Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7/16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1/2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a/c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing).
Date:  September 1, 2015

Permit type: Permit | Permit status: Closed | Completion date: September 9, 2015 | Current use: Residential | Permit id: Bld2015-07080
2015/09/010611215 N Carousel St Salt Lake City, Ut 84116 1607Standard Roofing And Constructionjames And Coral Coffey
SCORE
61
Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7/16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1/2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a/c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing).
Date:  September 9, 2015

Permit status: Closed | Current use: Residential | Permit id: Bld2015-07080
2015/09/090611215 N Carousel St Salt Lake City, Ut 84116 1607James And Coral Coffeyindalesio Rodriguez
SCORE
61
Remove 17,0 sq. Ft. Of hot tar, asphalt and asphalt shingle material, down to the wood decking. Install 7 16 osb plywood sheets, as needed. ( first five sheets of osb will be included in bid, every sheet after will be 25. Each). Install 1 2 inch fan fold insolation, fastened with plates and screws. Install tpo drip edge metals around the perimeters of roof. Install mil johns manville tpo roofing membrane. Install termination bars for flashing on walls or a c unit bases. ( membrane will be installed mechanically, membrane will be directly welded to tpo drip edge metal , and termination bars will be installed around chimney for tpo flashing).
Date:  September 1, 2015

Permit status: Closed | Completion date: September 9, 2015 | Current use: Residential | Permit id: Bld2015-07080
2015/09/010611215 N Carousel St Salt Lake City, Ut 841161607Standard Roofing And Constructionjames And Coral Coffey
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.