Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Replace sewer service line from house to main Date: October 29, 2008 Contractor: Pipeline Industries Inc Client: Leonard Levy | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss | |||||
SCORE 86 Tear-off & reroof of sfd, 25 squares on a pitch represented as 2 12. No overlay allowed, approved per the 2006 irc and 1981 brc as amended. Shingles to comply with astm d 225 or 3462 and astm d 3161 class f. Shingle must be listed for low slope use -- shingles not allowed on pitches under 2 12 per the irc. Mid-roof inspection reqsuired. Date: September 30, 2010 Contractor: 3m Construction Services Client: Leonard Levy | Applicant: 3m Construction Services | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Single family d | |||||
SCORE 86 Tear-off & reroof of sfd, 25 squares on a pitch represented as 2 12. No overlay allowed, approved per the 2006 irc and 1981 brc as amended. Shingles to comply with astm d 225 or 3462 and astm d 3161 class f. Shingle must be listed for low slope use -- shingles not allowed on pitches under 2 12 per the irc. Mid-roof inspection reqsuired. Client: Leonard Levy | Permit type: Roofing | Permit status: Cmp | Completion date: August 15, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04245 | |||||
SCORE 95 Replace sewer service line from house to main Date: October 29, 2008 Contractor: Pipeline Industries, Inc Client: Leonard Levy | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2008-04729 |