Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Installation of automatic sprinkler system with six inch (6") fire service line, backflow prevention device and fire department connections in accordance with nfpa 13, and two (2) automatic wet class i standpipes at exit enclosures and roof in accordance with nfpa 14, throughout a five story (1st-ia, 2nd-5th-va const.) structure (32 apts & vacant comm. Space). Separate permits required for all electrical and plumbing work. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Separate permits required for all other work. Date: December 20, 2016 Contractor: Accelerated Fire Protection In Permit type: Suppression permit | Permit status: Completed | Completion date: May 18, 2017 | Permit id: 737498 | |||||
For the erection of modular construction to include four story addition above an existing one (1) story structure that was previously approved.. The 2nd - 5th floor to be use as 32 dwelling units. See ap# 640574 for foundation and 1st floor construction. Date: April 12, 2016 Permit type: New construction permit | Permit status: Completed | Completion date: May 18, 2017 | Permit id: 678287 | |||||
Admin review to add addition of 1 sfd unit into existing4 units Date: February 24, 2016 Permit type: Zoning admin review | Permit status: Completed | Completion date: May 5, 2017 | Permit id: 672120 | |||||
SCORE 82 For interior level 2 alterations for initial fit-out of first floor commercial space including drop ceiling, sheetrock walls, concrete floor, frame out office and bathroom as per plans. Separate permits required for mechanical, electrical, plumbing and fire suppression work. Date: November 10, 2017 Contractor: Jeffrey Millner Permit type: Alteration permit | Permit status: Active | Completion date: November 28, 2017 | Permit id: 825779 | |||||
SCORE 93 New modular construction to include four story addition above an existing one (1) story structure that was previously approved (2nd - 5th floor as 32 dwelling units) - the installation will compy with the philadelphia plumbing code 2004 Date: August 24, 2016 Contractor: Lepore Plumbing Inc Permit type: Plumbing permit | Permit status: Completed | Completion date: May 18, 2017 | Permit id: 712492 | |||||
SCORE 100 Install (1) heat pump with ductwork. (mixed-use) Date: December 13, 2016 Contractor: Fresh Air Services Inc Permit type: Mechanical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 742725 | |||||
SCORE 82 16 plumbing fixtures with piping for interior level 2 alterations for initial fit-out of first floor commercial space (restaurant). Date: November 27, 2017 Contractor: Jeffrey Millner Permit type: Plumbing permit | Permit status: Active | Completion date: November 29, 2017 | Permit id: 825021 | |||||
Use to grocery meat deli Date: October 5, 2017 Permit type: Use permit | Permit status: Completed | Completion date: October 5, 2017 | Permit id: 770227 | |||||
Extend permit number 421726 Date: September 17, 2014 Permit type: Zoning admin review | Permit status: Completed | Completion date: September 17, 2014 | Permit id: 561962 | |||||
New construction of a four story apt building with accessory parking. Date: April 10, 2013 Permit type: Zoning/use permit | Permit status: Completed | Completion date: April 22, 2013 | Permit id: 421726 | |||||
For the erection of a foundation system as per approved foundation plan & geotechnical report. For the erection of a one (1) story structure, five (5) story self supporting exit enclosures and elevator pit for future modular residential construction on the 2nd - 5th floor, non load bearing partitions, creation of accessory spaces on the 1st floor for future residential construction, three (3) hour fire resistance floor ceiling assembly to separate 1st floor and future 2nd - 5th story(s), ada ramp to comply with section 10 of the 2009 ibc (see attached document), exterior canopy, and all other work as per approved plans. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Separate use registration permits for commercial space certificate of occupancy(s). Date: November 20, 2015 Permit type: New construction permit | Permit status: Completed | Completion date: May 18, 2017 | Permit id: 640574 | |||||
SCORE 96 Install 15kv service to peco 7 kw transformer, 3000amp main switch board, 5 meter section switch boards, 36-120 208 volt panels, 139 fixtures per 2008 nec (mixed use) install 57 devices for fire alarm per nfpa 72 Date: December 31, 2015 Contractor: Jw Carrigan Llc Permit type: Electrical permit | Permit status: Completed | Completion date: May 17, 2017 | Permit id: 654764 | |||||
SCORE 98 Making final plumbing connection above-grade for new modular construction - flat offsets of stacks must comply with section p-1107, branch venting must comply with section p-1105 and venting at the lowest level must comply with section p1110. 3 of the philadelphia plumbing code 2004 - note: all underground piping including storm, sanitary, water distribution, 8"sanitary storm 3"water connections to the city mains and the domestic reduced pressure zone backflow prevention containment assembly are "by others" (separate permits required) - a separate permit is required for the fuel gas piping Date: August 12, 2016 Contractor: James Brooks Permit type: Plumbing permit | Permit status: Completed | Completion date: May 18, 2017 | Permit id: 659029 |