Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit Date: September 21, 2016 Client: Maida Domenic S Tr | Permit status: Completed | Permit id: 723359 | |||||
Alteration permit Date: March 9, 2016 Client: Maida Domenic S Tr | Permit status: Completed | Permit id: 675232 | |||||
Use permit Date: September 21, 2016 Client: Chen Ying Wu Fang Ju | Permit status: Completed | Permit id: 723359 | |||||
Demolition permit Date: January 20, 2017 Client: Chen Ying Wu Fang Ju | Permit status: Active | Permit id: 753138 | |||||
Alteration permit Date: March 9, 2016 Client: Chen Ying Wu Fang Ju | Permit status: Completed | Permit id: 675232 | |||||
SCORE 100 Install light fixtures, relocate outlets and 5 fixtures as per 2008 nec (south district) Date: February 9, 2017 Contractor: Qq Construction Inc Client: Tang Weifeng Ou Yangsi | Permit type: Electrical permit | Permit status: Active | Completion date: August 23, 2017 | Permit id: 742381 | |||||
SCORE 100 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: January 20, 2017 Contractor: Qq Construction Inc Client: Tang Weifeng Ou Yangsi | Permit type: Demolition permit | Permit status: Completed | Completion date: March 27, 2017 | Permit id: 753138 | |||||
Remove old covering and replace with new vinyl siding to top of building Date: March 9, 2016 Client: Tang Weifeng Ou Yangsi | Permit type: Alteration permit | Permit status: Completed | Completion date: March 14, 2016 | Permit id: 675232 | |||||
For a vacant commercial space at first floor in the same building with single family household living at second floor. Date: September 21, 2016 Client: Tang Weifeng Ou Yangsi | Permit type: Use permit | Permit status: Completed | Completion date: March 13, 2017 | Permit id: 723359 | |||||
SCORE 100 Interior alteration to create a vacant commercial space on the 1st floor (use registration permit and certificate of occupancy required) and alterations to the single family dwelling on the 2nd floor level. Separate permit required for any mep work. Date: February 9, 2017 Contractor: Qq Construction Inc Client: Tang Weifeng Ou Yangsi | Permit type: Alteration permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 738999 | |||||
SCORE 100 Install backflow 3 4 rpz (mixed use)the installation shall comply with the philadelphia plumbing code, 2004 Date: February 15, 2017 Contractor: Marc Daniels Dba Daniel Inc Me Client: Tang Weifeng Ou Yangsi | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 759465 | |||||
SCORE 89 Install (1) 2 ton heat pump on the first floor. Install (1) 2 ton heat pump on the second floor. Install all ductwork without penetrating the fire wall. Date: February 28, 2017 Contractor: Tp Llc Client: Tang Weifeng Ou Yangsi | Permit type: Mechanical permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 760301 | |||||
SCORE 100 Install 1-water closet & 1-lav on 1st floor comm & 1-water closet, 1-lav, 1-bath tub, 1-kitchen sink &1-landry sink on 2nd floor the installation will comply with the philadelphia plumbing code 2004 Date: February 17, 2017 Contractor: Prompt Plumbing And Mechanical Client: Tang Weifeng Ou Yangsi | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 19, 2017 | Permit id: 760390 | |||||
SCORE 100 Replace 200amp with 200amp 2 v single phase service, 3 gang meter socket and two 100amp panel, 0ne 1 subpanel on second floor as per nec 2008 Date: March 15, 2017 Contractor: Prompt Plumbing And Mechanical Client: Tang Weifeng Ou Yangsi | Permit type: Electrical permit | Permit status: Expired | Completion date: March 15, 2017 | Permit id: 766842 |