Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Electrical Date: February 27, 2015 Contractor: Rodrigo Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10001-041 | |||||
SCORE 59 Electrical Date: June 2, 2015 Contractor: Roberto Alcantar Permit status: Issued | Current use: Commercial | Permit id: 15041-30000-168 | |||||
SCORE 100 Electrical Date: June 8, 2015 Contractor: Rodrigo Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-30000-176 | |||||
SCORE 83 Supplemental to #07010-10000-00273 for stair reconstruction & lobby re Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10003-002 | |||||
SCORE 65 Plumbing Date: October 26, 2010 Contractor: Phil Keeny Permit status: Permit finaled | Current use: Commercial | Permit id: 10042-10000-184 | |||||
SCORE 56 Supplemental to revise level one landing for stair #1. Refer to 07010 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10007-002 | |||||
SCORE 61 Revise mid-level landing connection to stair # 6. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10005-002 | |||||
Electrical Date: February 10, 2011 Permit status: Permit finaled | Current use: Commercial | Permit id: 11041-10000-026 | |||||
SCORE 79 Supplemental to revise level one landing for stair #3. Refer to 07010 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10006-002 | |||||
SCORE 56 Electrical Date: October 25, 2010 Contractor: Cosimo Rosssetti Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-211 | |||||
Electrical Date: September 16, 2010 Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-20001-178 | |||||
SCORE 86 Hvac Date: October 6, 2010 Contractor: Gerardus Opzeeland Permit status: Permit finaled | Current use: Commercial | Permit id: 10044-90000-097 | |||||
SCORE 86 Hvac Date: December 17, 2010 Contractor: Gerardus Opzeeland Permit status: Permit finaled | Current use: Commercial | Permit id: 10044-90000-125 | |||||
SCORE 62 Ti in an office building in playa vista. Epc is for power and energy. Date: February 23, 2011 Contractor: Marvin Jeraz Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-252 | |||||
SCORE 79 Deferred window washing permit for bldg 2. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10002-002 | |||||
SCORE 83 Supplemental to #07010-10000-00272 to refinish lobby Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10008-002 | |||||
SCORE 70 Install two (2) elevator passenger cable elevators ( gen2). Date: February 25, 2010 Contractor: Joe Thomas Permit type: Elevator | Permit status: Permit finaled | Current use: Commercial | Permit id: 09046-10000-016 | |||||
SCORE 60 Revision to previously approved plan. Installation of 2-1/2 inch prv a Date: February 5, 2010 Contractor: Mark Felten Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 09043-10003-006 | |||||
T. I. Added sprinkler under new soffit and in new office area Date: December 16, 2010 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 10043-10000-027 | |||||
SCORE 64 Plan check and permit for revisions made to a previously approved meth Date: May 13, 2010 Contractor: Patrick Sheehan Permit type: Hvac | Permit status: Permit finaled | Current use: Apartment | Permit id: 10044-10000-034 | |||||
SCORE 62 Electrical Date: December 20, 2010 Contractor: Marvin Jeraz Permit status: Permit finaled | Current use: Commercial | Permit id: 10041-10000-252 | |||||
SCORE 61 Install store front glazing under (e)concrete canopy. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10000-163 | |||||
SCORE 59 (ti) property management space - adding non bearing walls, 10% act, Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10016-10000-211 | |||||
SCORE 56 Proposed (1) 70" high x 168" wide (69 sqft.) single sided, illuminated Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 10048-10000-000 | |||||
SCORE 79 Deferred window washing permit for bldg 1. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10005-002 | |||||
SCORE 75 Approve for recording five(5) covenants in connection with the above a Permit type: Bldg-alter/repair | Permit status: Permit expired | Current use: Commercial | Permit id: 11016-10000-245 | |||||
SCORE 83 Supplemental permit to convert (e)91 x 24 portion of garage to (n)se Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 07010-10006-002 | |||||
SCORE 64 Revisions made to previously approved plans for methane ventilation of Date: March 23, 2010 Contractor: Patrick Sheehan Permit type: Hvac | Permit status: Permit finaled | Current use: Apartment | Permit id: 09044-10000-002 | |||||
SCORE 61 Install architectural screen panel at north elevation wall. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 10014-10000-033 | |||||
SCORE 79 Removel dimizing wall to create one suite. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-112 | |||||
SCORE 100 Electrical Date: March 31, 2015 Contractor: Enrique Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-094 | |||||
SCORE 84 Installation of new fire sprinkler system for new restaurant inside op Date: January 20, 2015 Contractor: Aravind Rav Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-001 | |||||
Electrical Date: June 16, 2015 Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-188 | |||||
SCORE 91 (1) set illuminated channel letters "samsung" 1-2" x 8-2". Permit type: Sign | Permit status: Issued | Current use: Onsite | Permit id: 16048-10000-007 | |||||
SCORE 96 Hvac Date: January 6, 2015 Contractor: Aron Lilland Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-000 | |||||
SCORE 68 (aluminum folding door) installation of nanawall on 3rd floor of exist Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-121 | |||||
SCORE 99 Pc for power and energy. First time tenant from parking to business of Date: February 12, 2015 Contractor: Scott Poston Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-009 | |||||
Full plan check for outdoor lighting for playa vista. The area is in a Date: August 21, 2014 Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-062 | |||||
Electrical Date: February 11, 2016 Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-050 | |||||
SCORE 93 Electrical Date: February 22, 2016 Contractor: Lauren Ebalo Permit status: Issued | Current use: Commercial | Permit id: 16041-90000-061 | |||||
Plan check for outdoor lighting for playa vista. This area is in a met Date: August 21, 2014 Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-062 | |||||
SCORE 99 Interior ti to 5th floor of (e) office bldg. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-067 | |||||
SCORE 99 Electrical Date: March 17, 2015 Contractor: Scott Poston Permit status: Issued | Current use: Commercial | Permit id: 15041-90000-078 | |||||
SCORE 89 Meteane gas detection system level3. Addition 7 new sensors. 3 story c Date: March 14, 2016 Contractor: Fernando Monay Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-071 | |||||
SCORE 93 Electrical Date: January 11, 2016 Contractor: Martha Diaz Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-423 | |||||
SCORE 86 Plan check for power and title-24 (energy). Total area = 70,0 sq. F Date: November 4, 2015 Contractor: Tik Wong Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 15041-20000-230 | |||||
SCORE 86 Electrical Date: March 27, 2015 Contractor: Steven Polinsky Permit status: Issued | Current use: Commercial | Permit id: 15041-90000-092 | |||||
SCORE 93 Supplement permit to permit # 15016-10000-27563; alteration of one res Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10001-275 | |||||
SCORE 98 Plumbing Date: November 25, 2014 Contractor: Daniel Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-231 | |||||
SCORE 100 Plumbing Date: August 28, 2015 Contractor: Paul Andersen Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-90000-174 | |||||
SCORE 59 Commercial office t. I. To floors 4, 5, 6. Install interior access stai Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-151 | |||||
SCORE 100 Electrical Date: January 6, 2015 Contractor: Arica Simpson Permit status: Issued | Current use: Commercial | Permit id: 15041-90000-002 | |||||
SCORE 88 Electrical Date: February 10, 2015 Contractor: Paul Warner Permit status: Issued | Current use: Commercial | Permit id: 15041-90000-040 | |||||
SCORE 82 Plumbing Date: December 4, 2014 Contractor: Greg Caldwell Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-236 | |||||
Plumbing Date: November 25, 2014 Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-231 | |||||
SCORE 89 New roof terrace (uncovered) located at level 5 of the existing buildi Permit type: Bldg-addition | Permit status: Cofo issued | Current use: Commercial | Permit id: 15014-10000-027 | |||||
SCORE 79 Interior tenant improvement.-(commercial) new non-load bearing partiti Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-038 | |||||
SCORE 84 Electrical Date: March 16, 2015 Contractor: Muhannad Abdulhamid Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-20000-034 | |||||
SCORE 80 Deferred submittal for structural review of two exterior steel stairs, Date: December 11, 2015 Contractor: Brian Dimaggio Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15014-10002-027 | |||||
SCORE 100 Electrical Date: November 20, 2014 Contractor: Cesar Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10000-324 | |||||
SCORE 100 Tenant improvment. Commercial office space. Add 49 water curtain heads Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-038 | |||||
SCORE 99 Hvac Date: August 5, 2015 Contractor: Luis Lopez Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-079 | |||||
SCORE 100 Install (1) detached structure ( (h) x 16 (w) = 3 sq) in front Permit type: Nonbldg-new | Permit status: Issued | Current use: Commercial | Permit id: 15020-10000-006 | |||||
SCORE 88 Supplemental permit to 14030-10000-01734: revise approved grading plan Permit type: Grading | Permit status: Issued | Current use: Commercial | Permit id: 14030-10001-017 | |||||
SCORE 100 Plumbing Date: October 13, 2015 Contractor: Sherri Taylor Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-90000-206 | |||||
SCORE 79 Interior tenant improvement to (e) office. Construct non bearing part Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-034 | |||||
SCORE 65 New tenant partition wall at ground floor of existing 6-sty office bui Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-040 | |||||
SCORE 100 Hvac Date: May 14, 2015 Contractor: Bob Youngsma Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-90000-045 | |||||
SCORE 59 Install access control device at elevator lobbies. See the comment. Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-029 | |||||
SCORE 97 Add new openning between retail and parking structure. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10001-042 | |||||
SCORE 100 Hvac Date: March 26, 2015 Contractor: Russell Wright Permit status: Issued | Current use: Commercial | Permit id: 15044-90000-027 | |||||
SCORE 81 Early start interior demolition of a (e) office tenant space (5000sf) Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 14016-10000-240 | |||||
SCORE 100 Non-structural interior office 1,803 sf ti work including new demisin Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-258 | |||||
SCORE 74 Fire sprinkler Date: June 19, 2015 Contractor: Daniel Delahoussaye Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-026 | |||||
SCORE 64 Installation of two split systems, modification of existing methane ex Date: March 5, 2015 Contractor: Bob Youngsman Permit type: Hvac | Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-10000-002 | |||||
SCORE 86 Supplement to 14016-20000-22644 for t. I. On floor 1 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-20001-226 | |||||
SCORE 86 Electrical Date: January 25, 2016 Contractor: Steven Polinsky Permit status: Issued | Current use: Commercial | Permit id: 16041-90000-027 | |||||
SCORE 99 Electrical Date: January 25, 2016 Contractor: Scott Poston Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-026 | |||||
SCORE 88 Site preparation and grading for lattitude 34 at playa vista. Fill = Permit type: Grading | Permit status: Permit finaled | Current use: Commercial | Permit id: 14030-10000-017 | |||||
Installation of aduplex packeged sewage ejectoer for sink. Due to stru Date: April 22, 2015 Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-071 | |||||
SCORE 59 Install 1 wall sign 3 x 14 2" Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-10000-012 | |||||
SCORE 86 T. I. On ground floor: (n) interior non-bearing walls, ceiling work, mi Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-148 | |||||
SCORE 71 Electrical Date: June 29, 2015 Contractor: Hector Navarro Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-203 | |||||
SCORE 67 Proposed 4-0" h x long retaining wall. Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Commercial | Permit id: 14020-10000-029 | |||||
SCORE 100 Electrical Date: September 3, 2015 Contractor: Cesar Fortuno Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-292 | |||||
SCORE 86 Electrical Date: August 18, 2015 Contractor: Dawn Macfadyen Permit status: Issued | Current use: Commercial | Permit id: 15041-10001-156 | |||||
T. I. Within 1st and 2nd floor. Added extended coverage (max 4 sq. F Date: January 20, 2015 Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-001 | |||||
SCORE 79 Interior ti to (e) office: non-bearing partitions, suspended ceilings, Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-029 | |||||
SCORE 89 Electrical Date: May 18, 2015 Contractor: Noel Ortiz Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-150 | |||||
SCORE 79 Supplemental to permit #15016-10000-11283 installation of sliding Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10001-112 | |||||
SCORE 86 Electrical Date: March 16, 2016 Contractor: Valerie Brooks Permit status: Issued | Current use: Commercial | Permit id: 16041-90000-092 | |||||
SCORE 97 Alterations to common areas outside three buildings affecting the exit Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10001-041 | |||||
SCORE 79 Tenant improvement - addition of (92) fire sprinkler heads on first fl Date: September 18, 2015 Contractor: Brian Galleano Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-041 | |||||
SCORE 89 Reinforcement of existing steel beams at level 5 per engineers plan. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-148 | |||||
SCORE 100 Installation of new toilet room in existing core and shell space, inc Date: March 2, 2016 Contractor: Randy Jenkins Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10000-035 | |||||
SCORE 97 Building 3 of 3. Renovation of parking garage by updating outdoor spac Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-042 | |||||
SCORE 65 Locking elevator lobby doors on the 2nd floor of a 5-storyy office bui Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 15016-10000-032 | |||||
SCORE 96 T. I. To existing building on the 1st and 2nd floors. Install subpanel Date: January 5, 2015 Contractor: Arc Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-306 | |||||
SCORE 100 Electrical Date: February 10, 2016 Contractor: Gene Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-047 | |||||
SCORE 89 (15) additonal devices to an existing methane system. Date: January 7, 2016 Contractor: Noel Ortiz Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-001 | |||||
SCORE 86 T. I. On 1st & 2nd flr to (e) office Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-20000-226 | |||||
SCORE 89 (1) new on-site channel letter wall sign. "the honest co." with logo Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-10000-027 | |||||
SCORE 100 Plumbing Date: December 16, 2014 Contractor: Paul Andersen Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-90000-244 | |||||
SCORE 96 Electrical Date: January 14, 2015 Contractor: Lily Iryami Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-328 | |||||
SCORE 100 Fire sprinkler Date: July 21, 2015 Contractor: Randy Howell Permit status: Issued | Current use: Commercial | Permit id: 15043-90000-031 | |||||
SCORE 61 Electrical Date: April 9, 2015 Contractor: Seyes Ahrar Permit status: Issued | Current use: Commercial | Permit id: 15041-10000-104 | |||||
SCORE 80 New exterior finish upgrades, open partitions, and new doors. No chang Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-050 | |||||
SCORE 86 Full plan check for first time tenant, office located at the 5th floor Date: June 18, 2015 Contractor: Dawn Macfadyen Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-156 | |||||
SCORE 84 Electrical Date: July 27, 2015 Contractor: Muhannad Abdulhamid Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-20000-171 | |||||
SCORE 96 Electrical Date: September 2, 2015 Contractor: Mariano Cabrera Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-20000-225 | |||||
SCORE 100 Tenant improvement on fourth floor of (e) office. Installation of (31 Date: August 26, 2015 Contractor: Mahmoud Fazlali Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 15043-10000-038 | |||||
SCORE 64 Hvac Date: June 2, 2015 Contractor: Bob Youngsman Permit status: Permit finaled | Current use: Commercial | Permit id: 15044-40002-002 | |||||
Revision to previosuly approved plans for a t. I. Within 1st and 2nd f Date: February 2, 2015 Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 15043-10001-001 | |||||
SCORE 100 Tenant improvement: revision to nfpa13 sprinkler system for new walls Date: February 5, 2016 Contractor: Mahmoud Fazlali Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 16043-10000-005 | |||||
SCORE 80 Two new openings (3x5 and 3x6) in exterior of retail space. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-048 | |||||
SCORE 89 Electrical Date: February 22, 2016 Contractor: Noel Ortiz Permit status: Permit closed | Current use: Commercial | Permit id: 16041-10000-060 | |||||
Previously approved for sewer ejectors. Relocating the location of dis Date: April 22, 2015 Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10001-071 | |||||
SCORE 93 Interior tenant improvement. New nonbearing walls, finishes, and suspe Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15016-10000-275 | |||||
SCORE 100 Electrical Date: February 26, 2016 Contractor: Jorge Mejia Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-069 | |||||
SCORE 80 Add fire rated glazing at first and four levels. Add egress door at 4t Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 15014-10001-027 | |||||
SCORE 93 Electrical Date: March 25, 2016 Contractor: Martha Diaz Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10001-423 | |||||
SCORE 100 Hvac Date: April 6, 2016 Contractor: Russell Wright Permit status: Issued | Current use: Commercial | Permit id: 16044-90000-036 | |||||
SCORE 82 Tenant improvement for potable water only. Existing 2" water meter, ex Date: June 2, 2016 Contractor: Greg Ferraro Permit type: Plumbing | Permit status: Issued | Current use: Commercial | Permit id: 16042-10000-101 | |||||
SCORE 82 Pc for power and energy. Ti and change of use from office to restauran Date: June 16, 2016 Contractor: Greg Ferraro Permit type: Electrical | Permit status: Issued | Current use: Commercial | Permit id: 16041-10000-172 | |||||
SCORE 75 Fire sprinkler tenant improvement for "the chicken or the egg." Date: June 22, 2016 Contractor: Geoff Baum Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 16043-10000-028 | |||||
SCORE 82 Ti to (e) a3 core and shell space for new restaurant including install Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10000-111 | |||||
SCORE 82 (2) type i hoods with make-up air, environmental exhaust, and air con Date: May 18, 2016 Contractor: Greg Ferraro Permit type: Hvac | Permit status: Issued | Current use: Commercial | Permit id: 16044-10000-049 | |||||
SCORE 99 Remodel of two (e) 5th floor uncovered patios to be occupied with adj Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-30000-154 | |||||
SCORE 82 Hvac Date: August 1, 2016 Contractor: Greg Ferraro Permit status: Issued | Current use: Commercial | Permit id: 16044-10002-049 | |||||
SCORE 82 Electrical Date: August 1, 2016 Contractor: Greg Ferraro Permit status: Issued | Current use: Commercial | Permit id: 16041-10001-172 | |||||
SCORE 93 Plumbing Date: November 25, 2014 Contractor: Muirchase Plumbing Co Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-231 | |||||
SCORE 93 Plumbing Date: November 3, 2015 Contractor: Muirchase Plumbing Co Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-220 | |||||
SCORE 95 Fire sprinkler Date: April 9, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10001-012 | |||||
SCORE 82 Supplemental to 16016-10000-11163 to correct address and legal. Date: September 16, 2016 Contractor: Greg Ferraro Permit type: Bldg-alter/repair | Permit status: Issued | Current use: Commercial | Permit id: 16016-10001-111 | |||||
SCORE 59 Electrical Date: September 6, 2016 Contractor: Elite Concept Services Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-316 | |||||
SCORE 93 Plumbing Date: August 1, 2016 Contractor: Buffalo Plumbing Permit status: Permit finaled | Current use: Commercial | Permit id: 16042-10001-101 | |||||
SCORE 95 Hvac Date: March 25, 2016 Contractor: Swinerton Builders Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-10000-032 | |||||
SCORE 98 Hvac Date: January 28, 2016 Contractor: Acco Engineered Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 16044-10000-010 | |||||
SCORE 93 Electrical Date: April 8, 2015 Contractor: Reliable Monitoring Services Permit status: Permit finaled | Current use: Public safety only | Permit id: 15041-10000-103 | |||||
SCORE 93 Installation of aduplex packeged sewage ejectoer for sink. Due to stru Date: April 22, 2015 Contractor: Andersen Commercial Plumbing Inc Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10000-071 | |||||
SCORE 90 T. I. Within 1st and 2nd floor. Added extended coverage (max 4 sq. F Date: January 20, 2015 Contractor: Kimble And Company Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-001 | |||||
SCORE 71 Electrical Date: March 26, 2015 Contractor: United Electrical Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-10001-062 | |||||
SCORE 90 Plumbing Date: February 23, 2016 Contractor: Sierra Commercial Plumbing Inc Permit status: Issued | Current use: Commercial | Permit id: 16042-10000-036 | |||||
SCORE 90 Revision to previosuly approved plans for a t. I. Within 1st and 2nd f Date: February 2, 2015 Contractor: Kimble And Company Permit type: Fire sprinkler | Permit status: Issued | Current use: Commercial | Permit id: 15043-10001-001 | |||||
SCORE 93 Previously approved for sewer ejectors. Relocating the location of dis Date: April 22, 2015 Contractor: Andersen Commercial Plumbing Inc Permit type: Plumbing | Permit status: Permit finaled | Current use: Commercial | Permit id: 15042-10001-071 | |||||
SCORE 97 Electrical Date: October 14, 2015 Contractor: Diversified Protection Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-342 | |||||
SCORE 93 Electrical Date: February 11, 2016 Contractor: Pyro Comm Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 16041-10000-050 | |||||
SCORE 71 Full plan check for outdoor lighting for playa vista. The area is in a Date: August 21, 2014 Contractor: United Electrical Inc Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 14041-20000-062 | |||||
SCORE 95 Fire sprinkler Date: April 9, 2015 Contractor: Red Hawk Fire And Security Ca Llc Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10001-012 | |||||
SCORE 100 Install new cabinet on existing monument sign footing/pedestal. Permit type: Sign | Permit status: Permit finaled | Current use: Onsite | Permit id: 15048-30000-015 | |||||
SCORE 93 Electrical Date: June 16, 2015 Contractor: Pyro Comm Systems Inc Permit status: Permit finaled | Current use: Commercial | Permit id: 15041-10000-188 | |||||
SCORE 97 Building 2 of 3. Renovation of existing office buildings. Addition of Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Commercial | Permit id: 14016-10000-041 | |||||
SCORE 100 T. I. Adding (115) and relocating (13) sprinkler heads on the 3rd floor Date: March 31, 2015 Contractor: Mahmoud Fazlali Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 15043-10000-012 | |||||
SCORE 84 Install 26 new water curtain fire sprinkler heads on 2nd and 3rd floo Date: September 17, 2014 Contractor: Aravind Rav Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Commercial | Permit id: 14043-10000-038 | |||||
SCORE 100 Install (1) illum channgel letter wall sign 13-6" x 1-3 1/4" Permit type: Sign | Permit status: Issued | Current use: Onsite | Permit id: 15048-30000-017 | |||||
SCORE 84 Tenant improvment. Addd/relocate fire spirnkler heads. New water curta Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Apartment | Permit id: 15043-10000-052 |