Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Roof-mounted solar photo-voltaic system for (e) sfd as follows: 12 modules, 12 inverters, 2. 2 kw. Roof mounted solar voltaic, per section 4620(1) of the zoning ordinance, is not to extend greater that 5 feet above the highest point of the existing roof. Date: September 2, 2009 Contractor: Jamar Electric San Diego Inc Permit type: Residential alterati | Permit status: Issued expired | Permit id: Pds2009-1030-20 | Parcel: 377-240-20-00 | |||||
SCORE 100 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: April 17, 2017 Contractor: Jamar Electric San Diego Inc Permit type: Res roof mt solar pv | Permit status: Completed | Permit id: Pds2017-Resalt- |