Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Use permit Date: February 10, 2016 Permit status: Completed | Permit id: 649724 | |||||
Alteration permit Date: September 30, 2016 Permit status: Active | Permit id: 717094 | |||||
Plumbing permit Date: September 29, 2016 Permit status: Active | Permit id: 716782 | |||||
Suppression permit Date: February 23, 2016 Permit status: Active | Permit id: 647602 | |||||
Alteration permit Date: January 4, 2017 Permit status: Active | Permit id: 739332 | |||||
Alteration permit Date: September 30, 2016 Permit status: Active | Permit id: 717094 | |||||
Suppression permit Date: February 23, 2016 Permit status: Active | Permit id: 647602 | |||||
Use permit Date: February 10, 2016 Permit status: Completed | Permit id: 649724 | |||||
Zoning use permit Date: December 29, 2016 Permit status: Completed | Permit id: 734037 | |||||
Plumbing permit Date: September 29, 2016 Permit status: Active | Permit id: 716782 | |||||
Electrical permit Date: October 4, 2016 Permit status: Active | Permit id: 724305 | |||||
Mechanical permit Date: October 21, 2016 Permit status: Active | Permit id: 727795 | |||||
SCORE 100 Upgrade service from 200amp to 400amp and wiring throughout per 2008 nec (mixed use)east distric6t install fire alarm per nfpa 72 Date: October 4, 2016 Contractor: Polaris Brown Llc Permit type: Electrical permit | Permit status: Completed | Completion date: June 12, 2017 | Permit id: 724305 | |||||
Space was previously in shell condition but has been fully built out with new mechanical. Electrical, plumbing and fire suppression systems, as well as floating, cieling and storefront. Date: October 4, 2016 Permit type: Use permit | Permit status: Completed | Completion date: October 4, 2016 | Permit id: 726639 | |||||
For the installation of interior finishes to existing space, as per approved plans. See app# 717094 for tenant fitout permit. Date: January 4, 2017 Permit type: Alteration permit | Permit status: Completed | Completion date: March 21, 2017 | Permit id: 739332 | |||||
SCORE 99 For the installation of a mechanical system to include registers diffusers, appliances, supply exhaust ductwork, and associated work as per approved plans. Separate permit required for any electrical and plumbing work. Date: October 21, 2016 Contractor: Jamco Heating And Air Conditioni Permit type: Mechanical permit | Permit status: Active | Completion date: September 25, 2017 | Permit id: 727795 | |||||
SCORE 100 Upgrade service from 200amp to 400amp and wiring throughout per 2008 nec (mixed use)east district install fire alarm per nfpa 72 Date: July 31, 2017 Contractor: Fortuna Louis Permit type: Electrical permit | Permit status: Active | Completion date: July 31, 2017 | Permit id: 789808 | |||||
To amend existing electrical permit # 724305 to include addition of 12 recepts and 4 under counter lights within commercial unit on first floor - (east district) code inspection agency Date: March 10, 2017 Permit type: Administrative permit | Permit status: Completed | Completion date: March 21, 2017 | Permit id: 758448 | |||||
SCORE 100 Install (1) set of channel letters to store front 19" x 153 7 8" = 20sqft Date: February 15, 2017 Contractor: Ez Signs Llc Permit type: Sign permit | Permit status: Completed | Completion date: March 21, 2017 | Permit id: 746663 | |||||
SCORE 59 Interior alterations to first floor to include the installation of one (1) accessible bathroom as per approved plans. Separate permit required for certificate of occupancy for first floor prior to occupancy. Separate permits required for m. E. P. And fire suppression work. Date: September 30, 2016 Contractor: W G Straga Inc Permit type: Alteration permit | Permit status: Completed | Completion date: March 21, 2017 | Permit id: 717094 | |||||
SCORE 93 Alterations: interior plumbing; commercial space on the first floor with a two family dwelling above - the installation will compy with the philadelphia plumbing code 2004 Date: September 29, 2016 Contractor: M E B Plumbing Permit type: Plumbing permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 716782 | |||||
SCORE 59 For level iii alterations to an existing building for use as a commercial space on the first floor with a two family dwelling above. Building to be fully sprinklered. All work to be done per aprpoved plans. If field conditions vary contact design professional prior to the start of any work. Separate permits required for mechanical, electrical, plumbing and fire suppression work. Date: February 10, 2016 Contractor: W G Straga Inc Permit type: Alteration permit | Permit status: Active | Completion date: September 5, 2017 | Permit id: 649733 | |||||
SCORE 100 For the installation of a 13 13r fire supression system for a commercial space on the first floor with a mult-family dwelling serviced by a two inch fire service line with a back flow preventer assembly. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Fire suppression system to be installed in accordance with npfa 13 on the first floor and nfpa 13r on the second and third floor level. Date: February 23, 2016 Contractor: B. M. Consulting Services Inc Permit type: Suppression permit | Permit status: Completed | Completion date: March 21, 2017 | Permit id: 647602 |