Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 New 821 square foot single family detached dwelling with 8 square foot garage below. (building g1-a. Same plan set for two permits see also pmt 2003-03892) Client: Mile Four | Applicant: Shaw Construction Company | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 95 New 821 square foot single family detached dwelling with 8 square foot garage below. (building g1-a. Same plan set for two permits see also pmt 2003-03892) Client: Mile Four | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new, ga | Permit id: Pmt2003-03889 | |||||
SCORE 70 Relocation of an existing temp electrical power for the village at uptown. 15 rosewood Date: October 15, 2008 Contractor: 1st Electrical Contractors Inc Client: At Village | Applicant: 1st Electrical Contractors Inc | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Commercial/reta | |||||
SCORE 70 Relocation of an existing temp electrical power for the village at uptown. 15 rosewood Client: At Village | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Commercial/retail, existing | Permit id: Pmt2008-04580 | |||||
SCORE 82 Uptown broadway; bldg. 5: 3-story, three unit multi-family dwelling unit, w attached garages. 4,579 finished & 946 sf in garages. See adr2007-00097, tec2008-00021, lur2002-00019 & lur2005-00018 for supplemental information. Client: At Village | Applicant: Carter Cm Corporation | Permit type: Building, electrical | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 82 Uptown broadway phase 2; building 8: 2-story one unit sfd attached dwelling unit with four attached garages. 1,008 sf finished, 1771 sf in garages. See adr2007-00097, tec2008-00021, lur2002-00019 & lur2005-00018 for supplemental information. Client: At Village | Applicant: Carter Cm Corporation | Permit type: Building, electrical | Permit status: Co | Current use: Single family d | |||||
SCORE 82 Construction of a 6 unit multi-family dwelling unit 4,888 sf conditioned, 29 sf sprinkler room, 504 in decks porches and 1,902 sf in 8 attached garages. Client: At Village | Applicant: Carter Cm Corporation | Permit type: Building, electrical | Permit status: Co | Current use: Multifamily dwe | |||||
SCORE 99 Tap install services to bldg 9: 1-1 2inch domestic, 6inch fireline, 6inch sanitary sewer, 3 4inch irrigation --- (see pmt2009-01255 for addfootl fees and meters) Date: August 10, 2009 Contractor: Total Site Utilities Inc Client: At Village | Applicant: Total Site Utilities, Inc. | Permit type: Fire, water, wastewa | Permit status: Iss | |||||
SCORE 100 New fire alarm system for bldg 8 village at uptown broadway Date: September 1, 2009 Contractor: Metro Fire Detection Inc Client: At Village | Applicant: Metro Fire Detection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 New fire alarm system for bldg. 5 Date: September 11, 2009 Contractor: Metro Fire Detection Inc Client: At Village | Applicant: Metro Fire Detection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 New fire alarm system for building 9 uptown broadway Date: September 11, 2009 Contractor: Metro Fire Detection Inc Client: At Village | Applicant: Metro Fire Detection, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwe | |||||
SCORE 72 R&r handicap ramps, sidewalks & drive pans Date: November 6, 2009 Contractor: Cain And Fay Construction Co Client: At Village | Applicant: Cain And Fay Construction Co. | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 82 Construction of a 6 unit multi-family dwelling unit 4,888 sf conditioned, 29 sf sprinkler room, 504 in decks porches and 1,902 sf in 8 attached garages. Client: At Village | Permit type: Building, electrical, mechanical, plumbing, fire, water, wastewater, flood not required | Permit status: Co | Current use: Multifamily dwellings, new | Permit id: Pmt2009-01255 | |||||
SCORE 95 Tap install services to bldg 9: 1-1 2inch domestic, 6inch fireline, 6inch sanitary sewer, 3 4inch irrigation --- (see pmt2009-01255 for addfootl fees and meters) Date: August 10, 2009 Contractor: Total Site Utilities, Inc Client: At Village | Permit type: Fire, water, wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2009-03103 | |||||
SCORE 100 New fire alarm system for bldg 8 village at uptown broadway Client: At Village | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-03454 | |||||
SCORE 100 New fire alarm system for bldg. 5 Client: At Village | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-03577 | |||||
SCORE 100 New fire alarm system for building 9 uptown broadway Client: At Village | Permit type: Fire | Permit status: Cmp | Completion date: June 4, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2009-03594 | |||||
SCORE 82 Uptown broadway; bldg. 5: 3-story, three unit multi-family dwelling unit, w attached garages. 4,579 finished & 946 sf in garages. See adr2007-00097, tec2008-00021, lur2002-00019 & lur2005-00018 for supplemental information. Client: At Village | Permit type: Building, electrical, mechanical, plumbing, fire, water, wastewater | Permit status: Iss | Current use: Multifamily dwellings, new, garage - att | Permit id: Pmt2008-05455 | |||||
SCORE 82 Uptown broadway phase 2; building 8: 2-story one unit sfd attached dwelling unit with four attached garages. 1,008 sf finished, 1771 sf in garages. See adr2007-00097, tec2008-00021, lur2002-00019 & lur2005-00018 for supplemental information. Client: At Village | Permit type: Building, electrical, mechanical, plumbing, water, wastewater | Permit status: Co | Current use: Single family detached dwelling, new, ga | Permit id: Pmt2008-05459 | |||||
SCORE 100 Erosion control grading permit for the 10 rosewood development. See lur2010-00038, -00039 and tec2012-00015 for supplemental information. Date: October 29, 2012 Contractor: Ez Excavating Inc Client: Rosewood 1000.0 | Applicant: E-Z Excavating, Inc | Permit type: Flood accessory/remo | Permit status: Cmp | Completion date: September 11, 2014 | Current use: Single family d | |||||
SCORE 100 New utilities site infrastructure to include new 8inch water main, 8inch sewer main, storm, inlets, san sew taps, water services, 5 storm manholes, 4 sanitary manholes, curb & gutter, drive pans, bike path Date: November 6, 2012 Contractor: Ez Excavating Inc Client: Rosewood 1000.0 | Applicant: E-Z Excavating, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Installing gas main distribution across under cherry ave (65foot) into new subdivision via bore working from south - grass area outside of street row into easement on the north side. Trucks and equipment only in row. Wo:1174332 Date: December 10, 2012 Contractor: Xcel Energy Client: Rosewood 1000.0 | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Installing underground primary distribution acros under 9th st into new subdivision in a customer provided sleeve. Working from easement on west side to easement on east side. Trucks and equipment only in row. Wo:11742340 Date: December 10, 2012 Contractor: Xcel Energy Client: Rosewood 1000.0 | Applicant: Xcel Energy | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 New asphalt street alley paving for the 10 rosewood project Date: December 28, 2012 Contractor: Cdc Development Porchfront Homes Client: Of City | Applicant: Cdc Development/porchfront Homes | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 New comcast underground along the north side of cherry ave for service to the rosewood subdivision Date: February 5, 2013 Contractor: Comcast Client: Of City | Applicant: Comcast | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Install new 1inch irrigation meter pit service pif included in fees Date: May 30, 2013 Contractor: Cdc Development Porchfront Homes Client: Of City | Applicant: Cdc Development/porchfront Homes | Permit type: Water, right-of-way | Permit status: Iss | |||||
SCORE 95 Installation of 18 3 4inch water meter pits for each newly constructed home within the 10 rosewood project. Date: June 21, 2013 Contractor: Cdc Development Porchfront Homes Client: Of City | Applicant: Cdc Development/porchfront Homes | Permit type: Right-of-way | Permit status: Iss | |||||
New comcast underground along the north side of cherry ave for service to the rosewood subdivision Date: February 5, 2013 Client: Of City | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2013-00273 | |||||
SCORE 95 Erosion control grading permit for the 10 rosewood development. See lur2010-00038, -00039 and tec2012-00015 for supplemental information. Date: November 6, 2012 Contractor: Ez Excavating, Inc Client: Rosewood | Permit type: Flood accessory/remodel, grading | Permit status: Cmp | Completion date: September 11, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05175 | |||||
SCORE 95 New utilities site infrastructure to include new 8inch water main, 8inch sewer main, storm, inlets, san sew taps, water services, 5 storm manholes, 4 sanitary manholes, curb & gutter, drive pans, bike path Date: November 6, 2012 Contractor: E Z Excavating Inc Client: Rosewood | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05352 | |||||
Installing gas main distribution across under cherry ave (65foot) into new subdivision via bore working from south - grass area outside of street row into easement on the north side. Trucks and equipment only in row. Wo:1174332 Date: December 10, 2012 Client: Rosewood | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05831 | |||||
Installing underground primary distribution acros under 9th st into new subdivision in a customer provided sleeve. Working from easement on west side to easement on east side. Trucks and equipment only in row. Wo:11742340 Date: December 10, 2012 Client: Rosewood | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05832 |