Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit Date: February 2, 2009 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 192618 | |||||
Mechanical permit Date: December 9, 2008 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 191827 | |||||
Alteration permit Date: January 11, 2016 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Expired | Permit id: 648395 | |||||
Plumbing permit Date: January 21, 2009 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 197506 | |||||
Demolition permit Date: July 10, 2015 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 623920 | |||||
Electrical permit Date: December 4, 2008 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 191151 | |||||
Use permit Date: October 28, 2015 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 648389 | |||||
SCORE 100 The purpose of this project is to renovate the 1st floor entrance partial 2nd flr and entire 3rd flr for the prurposed of residential dwelling units. A total of 7 dwelling units is proposed there shall be no changes to the envelope of the building aside from the entry door on sanson st. There shall also be no changes of use to the exising 2 commercial tenants occupying the 1st floor and part of the 2nd floor adjustments for utilites is required Date: October 28, 2015 Contractor: Cvm Construction Managers Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Use permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 648389 | |||||
SCORE 93 Install 16 high hats, 5 receptacles, 2 exit signs and 5 receptacles with no additional wiring, as per 2005 nec (cc dist) Date: December 4, 2008 Contractor: Feliciano Electric Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Electrical permit | Permit status: Completed | Completion date: December 9, 2009 | Permit id: 191151 | |||||
SCORE 100 For the installation of six (6) heat pumps, with associated ductwork, registers diffusers, as per approved plans. Date: March 6, 2017 Contractor: First State Mechanical Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Mechanical permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 759844 | |||||
SCORE 97 Remove old drop ceiling tiles and wall paneling and replace with 1-1 2"gwb on walls and double 5 8" gwb on the ceiling joists and a 1 2" gwb drop ceiling. Install new bar area as per plan. Date: February 2, 2009 Contractor: Garcia Construction Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Alteration permit | Permit status: Completed | Completion date: March 25, 2009 | Permit id: 192618 | |||||
SCORE 100 Install 3-compartment sink, hand wash sink, indirect waste in basement, ice bin for store Date: January 21, 2009 Contractor: Ricardo Diana Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Plumbing permit | Permit status: Completed | Completion date: September 8, 2009 | Permit id: 197506 | |||||
SCORE 100 Ez interior demolition- for the interior demolition of non load-bearing partition walls and ceilings as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. Date: July 10, 2015 Contractor: Cvm Construction Managers Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Demolition permit | Permit status: Completed | Completion date: April 13, 2016 | Permit id: 623920 | |||||
Partial change in use and occupancy classification. Level iii interior alterations to the 2nd and 3rd floor to create seven (7) dwelling units. Dwelling units on the 2nd floor to by type b dwelling units. Building to fully sprinklered. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Asbestos abatement required prior to commencement of work. Date: January 19, 2017 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Alteration permit | Permit status: Active | Completion date: October 17, 2017 | Permit id: 746839 | |||||
Amend permit 746839 to correct the permit wording to reference six (6) dwelling units. Partial change in use and occupancy classification. Level iii interior alterations to the 2nd and 3rd floor to create six (6) dwelling units. Dwelling units on the 2nd floor to by type b dwelling units. Building to fully sprinklered. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Asbestos abatement required prior to commencement of work. Date: February 15, 2017 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Administrative permit | Permit status: Completed | Completion date: September 5, 2017 | Permit id: 759740 | |||||
SCORE 100 Installation of a new fire suppression system design per nfpa 13r and nfpa 13 standard with a 4 inch fire service line and sprinkler layout as per plans. Date: March 31, 2017 Contractor: Oneida Fire Protection Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Suppression permit | Permit status: Active | Completion date: October 4, 2017 | Permit id: 760460 | |||||
For a multi-family houshold living ( six-dwelling units) from second floor rear through third floors in the same building with an existing two(2) sit-down reataurants at first floor through second floor front as previously approved. No sign on this application. Date: January 3, 2017 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Use permit | Permit status: Completed | Completion date: January 3, 2017 | Permit id: 746838 | |||||
SCORE 100 Replace existing ductwork with new ductwork 10 5 openings Date: December 9, 2008 Contractor: Rosenberg Neil Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Mechanical permit | Permit status: Completed | Completion date: March 18, 2009 | Permit id: 191827 | |||||
Use permit Date: October 28, 2015 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 648389 | |||||
Plumbing permit Date: January 21, 2009 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 197506 | |||||
Alteration permit Date: February 2, 2009 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 192618 | |||||
Use permit Date: January 3, 2017 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 746838 | |||||
Alteration permit Date: January 11, 2016 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Expired | Permit id: 648395 | |||||
Electrical permit Date: December 4, 2008 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 191151 | |||||
Mechanical permit Date: December 9, 2008 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 191827 | |||||
Demolition permit Date: July 10, 2015 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Completed | Permit id: 623920 | |||||
Alteration permit Date: January 19, 2017 Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit status: Active | Permit id: 746839 | |||||
SCORE 89 New 2" water service Date: April 21, 2017 Contractor: Leuzzi Mark Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Plumbing permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 777093 | |||||
SCORE 100 Install fire alarm devices and booster panel to existing system as per nfpa 72 cc district Date: May 8, 2017 Contractor: Mcgoldrick Electric Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Electrical permit | Permit status: Expired | Completion date: May 8, 2017 | Permit id: 772631 | |||||
SCORE 100 Provide new 800a electrical service to serve existing loads and 6 new apts located on the 2nd and 3rd floors. Provide common area light power furnish and install power light for each apt. Provide hvac power for floors 2-3 as per nec 2008 cc district Date: April 17, 2017 Contractor: Mcgoldrick Electric Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Electrical permit | Permit status: Expired | Completion date: April 17, 2017 | Permit id: 765781 | |||||
SCORE 100 Partial change in use and occupancy classification. Level iii interior alterations to the 2nd and 3rd floor to create seven (7) dwelling units. Dwelling units on the 2nd floor to by type b dwelling units. Building to fully sprinklered. Separate permit required for mechanical, electrical, plumbing, and fire suppression work. Asbestos abatement required prior to commencement of work. Date: January 11, 2016 Contractor: Cvm Construction Managers Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Alteration permit | Permit status: Expired | Completion date: September 20, 2016 | Permit id: 648395 | |||||
SCORE 100 Alterations: interior plumbing; 2nd and 3rd floor;multi-family houshold living; create seven (7) dwelling units -the installation will comply with the philadephia plubming code 2004 Date: March 6, 2017 Contractor: First State Mechanical Inc Client: Samuel Rappaport Inc | Client Company: Samson Asset Mgmt Etal | Permit type: Plumbing permit | Permit status: Active | Completion date: October 10, 2017 | Permit id: 759431 |