Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
3400sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material conc. Tile proposed roofing material conc. Tile manufacturer eagle brand and model capistran color (if cool roof required) tuscan blend built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) removing old tile completely note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Date: June 29, 2016 Value: $20,162 Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 25, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 91 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 20, 2016 Contractor: Alltech Solar Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 27, 2016 | Permit id: Pds2016-Resalt- | |||||
Replace furnace and ac split system; electrical Date: July 27, 2016 Permit type: Residential alteration-addn | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 86 3400sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material conc. Tile proposed roofing material conc. Tile manufacturer eagle brand and model capistran color (if cool roof required) tuscan blend built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) removing old tile completely note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Residential alteration-addn | Permit status: Completed | Completion date: July 25, 2016 | Permit id: Pds2016-Resalt- | |||||
Final Date: December 6, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 91 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: June 20, 2016 Contractor: Alltech Solar Inc Permit type: Res roof mt solar pv | Permit status: Issued | Permit id: Pds2016-Resalt- | |||||
SCORE 86 3400sf reroof for existing sfd. If a re-roof project is proposed, the following specifications apply. Existing roofing material conc. Tile proposed roofing material conc. Tile manufacturer eagle brand and model capistran color (if cool roof required) tuscan blend built-up roofing assembly system number per attached listing report (if applicable) specific exemption from cool roof requirements (if applicable) required building inspector field verification (if applicable) removing old tile completely note self-certification by a licensed contractor is acceptable if a signed letter on company letterhead is provided to the building inspector. Permit type: Misc. (antennas, tennis cts, gazebo) | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 5022013900 | |||||
Replace furnace and ac split system; electrical Date: July 27, 2016 Permit type: Plumbing only | Permit status: Issued | Permit id: Pds2016-Resalt- | Parcel: 5022013900 |