Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Permit for the removal of rear second floor window bay, and for the erection of an addition to the rear third floor of an existing attached structure, size and location as shown on plan/application. For use as multi-family household living (four (4) dwelling units). Date: September 20, 2016 Client: Henry Milliken Fletcher Thomas Tr | Client Company: Galilee Bapt Church | Applicant: Michael Mattioni | Permit type: Appeal | Permit id: 28861 | |||||
Permit for the removal of rear second floor window bay, and for the erection of an addition to the rear third floor of an existing attached structure, size and location as shown on plan application. For use as multi-family household living (four (4) dwelling units). Date: September 20, 2016 Client: Henry Milliken Fletcher Thomas Tr | Client Company: Galilee Bapt Church | Applicant: Michael Mattioni | Permit type: Appeal | Permit status: Granted | Completion date: November 10, 2016 | Permit id: 28861 | |||||
SCORE 83 For the erection of a one (1) story rear addition at third floor level and level iii interior alterations to existing 3 story multi family structure as per plans. Separate permits required for all mechaical, electrical, plumbing and fire suppression. Date: July 31, 2017 Contractor: Donat Incorporated Client: Federal 4 Lp | Permit type: Addition permit | Permit status: Active | Completion date: September 27, 2017 | Permit id: 763837 | |||||
For the removal of rear second floor window bay, and for the erection of an addition to the rear third floor of an existing attached structure, size and location as shown on plan application. For use as multi-family household living (four (4) dwelling units). Date: June 27, 2017 Client: Federal 4 Lp | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 27, 2017 | Permit id: 710924 |