SCORE 100 (4) branch circuits for exit signs Date: October 11, 2011 Contractor: Stoner Electric Client: Tigard Cinema | Permit type: Electrical | Permit status: Issued | Permit id: Elc2011-00559 | |||||
Install (2) roof exhaust fans and ducting for popcorn makers. Demo cap existing ducts as needed. Date: January 15, 2015 Value: $15,660 Client: Tigard Cinemas | Permit type: Mechanical | Permit status: Pending | Permit id: Mec2015-00019 | |||||
SCORE 98 Add (1) sink, (4) 2" floor drains, (1) water heater and (6) primers for floor drains; move (2) sinks and (2) 2" floor drains. Date: May 1, 2003 Contractor: Mckinstry Co Client: Tigard Cinema | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2003-00167 | |||||
SCORE 100 Relocate 18 sprinkler heads and add 4 new heads. Client: Tigard Cinema | Permit type: Fire protection syst | Permit status: Closed | Permit id: Bup2003-00082 | |||||
. 2 wdu increase. Previous edu=9 for a total of 144 fixture values. Addition of .. 2 fixture values, for a new total of 147 fixture values= 9. 2 current edus. Date: February 14, 2003 Client: Tigard Cinema | Permit type: Sewer | Permit status: Closed | Permit id: Swr2003-00058 | |||||
SCORE 100 Install branch circuits and (1) low voltage system. Date: February 19, 2003 Contractor: Capitol Electric Co Inc Client: Tigard Cinema | Permit type: Electrical | Permit status: Closed | Permit id: Elc2003-00078 | |||||
SCORE 98 Adding 2 new sinks, replacing 3, capping 1, relocating (4) 2" floor drain, and 1 water heater. Date: February 14, 2003 Contractor: Mckinstry Co Client: Tigard Cinema | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2003-00048 | |||||
SCORE 99 Add (4) & relocate (2) sprinkler heads. Client: Tigard Cinemas | Permit type: Fire protection syst | Permit status: Closed | Permit id: Bup2004-00501 | |||||
SCORE 99 Box office remodel. Client: Tigard Cinemas | Permit type: Building | Permit status: Closed | Permit id: Bup2004-00447 | |||||
SCORE 100 Installation of ductless split system heat pump unit. Project value: 4,800 Date: October 1, 2004 Contractor: American Heating Inc Client: Tigard Cinemas | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2004-00657 | |||||
SCORE 85 Install new counters, extend storage room and finish work. Client: Tigard Cinema | Permit type: Building | Permit status: Closed | Permit id: Bup2002-00367 | |||||
SCORE 98 . 7 edu increase: previous fixture count of 147. 2, plus added fixtures of 11, for a new total of 158. 2 fixtures, or 9. 9 edu. Date: May 1, 2003 Contractor: Mckinstry Co Client: Tigard Cinemas | Permit type: Sewer | Permit status: Closed | Permit id: Swr2003-00136 | |||||
SCORE 98 Moving grilles to new ceiling hgt. Add 1 exhaust in concession area. Valuation 4728. 47 Date: February 14, 2003 Contractor: Mckinstry Co Client: Tigard Cinema | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2003-00058 | |||||
SCORE 99 (1) temporary service and (1) branch circuit for concession televisions. Date: October 9, 2008 Contractor: Ideal Services Inc Client: Tigard Cinema | Permit type: Electrical | Permit status: Expired | Permit id: Elc2008-00575 | |||||
SCORE 100 Install small ems panel in main electrical room. Job #22-171 Date: March 22, 2002 Contractor: Capitol Electric Co Inc Client: Tigard Cinema | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2002-00042 | |||||
SCORE 62 Data cabling. Date: November 8, 2004 Contractor: Lake Electronic Contractors Client: Tigard Cinemas | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00345 | |||||
SCORE 98 Hvac wiring Date: October 25, 2004 Contractor: American Heating Client: Tigard Cinemas | Permit type: Electrical limited e | Permit status: Closed | Permit id: Elr2004-00333 | |||||
SCORE 100 (1) service and (21) branch circuits for box office remodel. Job no. 71507 Date: October 8, 2004 Contractor: E C Company Client: Tigard Cinemas | Permit type: Electrical | Permit status: Closed | Permit id: Elc2004-00649 | |||||
SCORE 99 Reroof, overlay. Per planning department, screening must be installed prior to building final. Client: Tigard Cinemas | Permit type: Building | Permit status: Closed | Permit id: Bup2004-00166 | |||||
Expansion of parking lot per mis91-0004. Correct grading of bank along drainage ditch. Date: July 30, 1991 Value: $16,000 Client: Orewash Theaters | Permit type: Site work | Permit status: Closed | Permit id: Sit91-00009 | |||||
Six screen addn to theater complex Date: August 28, 1989 Permit type: Mechanical | Permit status: Closed | Permit id: Mec891393 | |||||
Storm drain system around new addition, plus san. Conn. For floor drains Date: August 14, 1989 Permit type: Plumbing | Permit status: Closed | Permit id: Plm891717 | |||||
Other: roof drain. There may be fixtures added to this permit as plans show more. Date: August 8, 1989 Permit type: Plumbing | Permit status: Closed | Permit id: Plm891392 | |||||
Note: foundation only.. Construction access from pacific hwy only !! Date: July 17, 1989 Permit type: Building | Permit status: Closed | Permit id: Bup891534 | |||||
Note; access to construction site to be from pacific highway only !! Date: April 20, 1989 Permit type: Building | Permit status: Closed | Permit id: Bup891391 | |||||
Other is 5 roof drains,supplement to plbg. Permit #5430 Date: March 8, 1988 Permit type: Plumbing | Permit status: Closed | Permit id: Plm880416 |