Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Second and third floor. Build new bathrooms. Tenant finish permit future. Pifs approved as part of core and shell Client: Condominiu Canyon | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 27, 2009 | Current use: Commercial/reta | |||||
SCORE 60 Replace surface mounted light fixtures with recessed fixtures in two locations in parking garage (first lower level) by elevators. Light fixtures to be same or lesser wattage than existing. Date: February 20, 2009 Contractor: Mercury Electric Co. Inc Applicant: Mercury Electric Co., Inc. | Permit type: Electrical | Permit status: N&v | Current use: Parking garage, | |||||
SCORE 100 Installation of two new windows in existing residential unit. No mep included. Client: Anne Holland | Applicant: Faurot Construction Inc | Permit type: Building | Permit status: Iss | Current use: Multifamily dwe | |||||
SCORE 60 Replace surface mounted light fixtures with recessed fixtures in two locations in parking garage (first lower level) by elevators. Light fixtures to be same or lesser wattage than existing. Permit type: Electrical | Permit status: N&v | Current use: Parking garage, existing | Permit id: Pmt2009-00550 | |||||
SCORE 95 Second and third floor. Build new bathrooms. Tenant finish permit future. Piffoots approved as part of core and shell Client: Condominiu Canyon | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 27, 2009 | Current use: Commercial/retail, tenant remodel | Permit id: Pmt2006-04538 | |||||
SCORE 95 Sign permit for externally illuminated blade sign "first national bank" see rev2007-00006 Date: April 18, 2007 Contractor: Young Electric Sign Co Client: Condominiu Canyon | Applicant: Young Electric Sign Co | Permit type: Electrical, sign | Permit status: Cmp | Completion date: November 4, 2009 | Current use: Financial insti | |||||
SCORE 93 Suite 1 -- demolition of interior non-loadbearing walls to allow for reconfiguration of walls for revised layout of office space to include minor ceiling grid work and modify (lower) sink at breakroom. Includes minor electrical, mechanical and plumbing work. Existing lighting whips and fixtures to be utilized Client: Limited 1155.0 | Applicant: Precision Development Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 30, 2013 | Current use: Office - profes | |||||
SCORE 100 Fs - relocate 1 and add 3 Date: May 21, 2013 Contractor: Flow Fire Protection Inc Client: Limited 1155.0 | Applicant: Flow Fire Protection, Inc | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - admini | |||||
SCORE 95 Sign. Replace internally illuminated wall sign on southeast corner of building inchfirst national bankinch. Associated reface of atm blade sign does not require sign permit. Date: July 24, 2013 Contractor: Davinci Sign Systems Inc Client: Limited 1155.0 | Applicant: Davinci Sign Systems Inc | Permit type: Sign | Permit status: Cmp | Completion date: October 31, 2013 | Current use: Financial insti | |||||
SCORE 93 Sign. Permit for new non-illuminated suspended sign inchslice of limeinch at at building entrance (11th and canyon). See rev2013-00031. Date: January 8, 2014 Contractor: Broomfield Sign Co Inc Client: Limited 1155.0 | Applicant: Broomfield Sign Co, Inc | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Commercial/reta | |||||
SCORE 95 Alteration of existing storage units closets in parking garage. Proposal is to enclose existing chain link storage areas with floor to deck framing and drywall, same size and location. Client: Limited 1155.0 | Applicant: Duggan Construction, Llc | Permit type: Building, flood acce | Permit status: Cmp | Completion date: April 29, 2014 | Current use: Parking garage, | |||||
SCORE 100 Fs - sowl - inchrelocate 1 upright sprinkler for new tenant finish. Adding 8 uprights for new enclosed stroage area. Total of 9. Inch Date: April 2, 2014 Contractor: Fire Defense Inc Client: Limited 1155.0 | Applicant: Fire Defense, Inc | Permit type: Fire | Permit status: Iss | Current use: Office - admini | |||||
SCORE 95 Fa - sowl - inchrelocate 30cd horn strobe and add one 15cd strobe. Inch Date: March 11, 2014 Contractor: Surelock Plus Llc Client: Limited 1155.0 | Applicant: Surelock Plus Llc | Permit type: Fire | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Office - admini | |||||
SCORE 82 Units 209 &307: interior component demolition of finishes and spiral stair connecting the two units to investigate floor system construction for future permit to infill floors and separate units. Date: January 21, 2016 Contractor: Kbc Remodel Service Client: Limited | Permit type: Demolition | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-00289 | |||||
SCORE 82 Units 209 and 307: construction permit to infill floor at previous location of spiral stairs between multi-family units. Infill will separate both units. Client: Limited | Permit type: Building, flood accessory/remodel | Permit status: Cmp | Completion date: July 29, 2016 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2016-00603 | |||||
SCORE 93 Suite 1 -- demolition of interior non-loadbearing walls to allow for reconfiguration of walls for revised layout of office space to include minor ceiling grid work and modify (lower) sink at breakroom. Includes minor electrical, mechanical and plumbing work. Existing lighting whips and fixtures to be utilized Client: Limited | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 30, 2013 | Current use: Office - professional, remodel | Permit id: Pmt2013-01816 | |||||
SCORE 95 Fs - relocate 1 and add 3 Client: Limited | Permit type: Fire | Permit status: Cmp | Completion date: July 29, 2013 | Current use: Office - administrative, existing | Permit id: Pmt2013-02232 | |||||
SCORE 95 Sign. Replace internally illuminated wall sign on southeast corner of building inchfirst national bankinch. Associated reface of atm blade sign does not require sign permit. Client: Limited | Permit type: Sign | Permit status: Cmp | Completion date: October 31, 2013 | Current use: Financial institution, existing | Permit id: Pmt2013-03167 | |||||
SCORE 95 Sign. Permit for new non-illuminated suspended sign inchslice of limeinch at at building entrance (11th and canyon). See rev2013-00031. Client: Limited | Permit type: Sign | Permit status: Cmp | Completion date: March 14, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2013-05862 | |||||
SCORE 95 Alteration of existing storage units closets in parking garage. Proposal is to enclose existing chain link storage areas with floor to deck framing and drywall, same size and location. Client: Limited | Permit type: Building, flood accessory/remodel | Permit status: Cmp | Completion date: April 29, 2014 | Current use: Parking garage, alteration | Permit id: Pmt2013-06623 | |||||
SCORE 95 Fs - sowl - inchrelocate 1 upright sprinkler for new tenant finish. Adding 8 uprights for new enclosed stroage area. Total of 9. Inch Client: Limited | Permit type: Fire | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2014-00103 | |||||
SCORE 95 Fa - sowl - inchrelocate 30cd horn strobe and add one 15cd strobe. Inch Client: Limited | Permit type: Fire | Permit status: Cmp | Completion date: July 3, 2014 | Current use: Office - administrative, existing | Permit id: Pmt2014-01043 | |||||
SCORE 59 Window cleaning using a lift machine Date: April 6, 2017 Contractor: North Star Window Cleaning Client: Limited | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-01310 | |||||
SCORE 95 Interior tenant remodel on the main level of a commercial building that currently houses a bank. Scope of work to include 32 sf to convert a hallway into an it room and associated electrical. Client: Limited | Permit type: Building, electrical, flood accessory/remodel | Permit status: Iss | Current use: Financial institution, tenant remodel | Permit id: Pmt2017-00219 | |||||
SCORE 95 Sign permit for externally illuminated blade sign inchfirst national bankinch see rev2007-00006 Client: Condominiu Canyon | Permit type: Electrical, sign | Permit status: Cmp | Completion date: November 4, 2009 | Current use: Financial institution, existing | Permit id: Pmt2007-01221 | |||||
SCORE 95 Sidewalk impacts for pressure washing building, lift Date: June 26, 2017 Contractor: E Z Excavating Inc Client: Limited | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-02671 | |||||
Access mh in broadway for splicing nightwork only #n. 297661 cdfs Date: October 10, 2017 Client: Limited | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2017-04332 | |||||
SCORE 95 Installation of a single wall sign "eks&h" Date: March 26, 2008 Contractor: Rainbow Signs Inc Client: Limited 1155.0 | Applicant: Rainbow Signs Inc | Permit type: Sign | Permit status: N&v | Current use: Commercial/reta | |||||
SCORE 95 Installation of a single wall sign "eks&h" on south elevation. Date: May 14, 2008 Contractor: Rainbow Signs Inc Applicant: Rainbow Signs Inc | Permit type: Sign | Permit status: Cmp | Completion date: September 2, 2008 | Current use: Commercial/reta | |||||
SCORE 95 Installation of a single wall sign incheks&hinch Value: $600 Contractor: Rainbow Signs Inc Client: Limited | Permit type: Sign | Permit status: N&v | Current use: Commercial/retail, existing | Permit id: Pmt2008-01124 | |||||
SCORE 95 Installation of a single wall sign incheks&hinch on south elevation. Permit type: Sign | Permit status: Cmp | Completion date: September 2, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2008-01562 | |||||
SCORE 95 Build new elevator vestibule in existing parking garage. 98 sf. Client: Limited 1155.0 | Applicant: Wyatt Construction Company | Permit type: Building, electrical | Permit status: N&v | Current use: Parking garage, | |||||
SCORE 100 Trench at ped 1137 connect conduit between ped & hh. Pull fiber from hh to customer at 1155 canyon and splice Date: November 17, 2008 Contractor: Qwest Comm Centurylink Client: Limited 1155.0 | Applicant: Qwest Comm/centurylink | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 100 Scope of work letter parking garage add 5 new heads for tennant finish Date: February 11, 2009 Contractor: Fire Defense Inc Client: Limited 1155.0 | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Parking garage, | |||||
SCORE 98 Sign permit - non illuminated wall sign. For replacement of inchwachovia securitiesinch with inchwells fargo advisorsinch on first floor near main entrance. Date: September 23, 2009 Contractor: Rusch Signs And Graphics Inc Client: Limited 1155.0 | Applicant: Rusch Signs & Graphics, Inc. | Permit type: Sign | Permit status: Cmp | Completion date: December 21, 2009 | Current use: Financial insti | |||||
SCORE 96 Close sidewalk to power wash & paint building - 3 weeks Date: October 31, 2012 Contractor: Krische Construction Inc Client: Limited 1155.0 | Applicant: Krische Construction, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Scope of work letter parking garage add 5 new heads for tennant finish Client: Limited | Permit type: Fire | Permit status: Cmp | Completion date: June 29, 2009 | Current use: Parking garage, existing | Permit id: Pmt2009-00442 | |||||
SCORE 95 Sign permit - non illuminated wall sign. For replacement of inchwachovia securitiesinch with inchwells fargo advisorsinch on first floor near main entrance. Client: Limited | Permit type: Sign | Permit status: Cmp | Completion date: December 21, 2009 | Current use: Financial institution, existing | Permit id: Pmt2009-03794 | |||||
SCORE 95 Close sidewalk to power wash & paint building - 3 weeks Date: October 31, 2012 Contractor: Krische Construction, Inc Client: Limited | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2012-05135 | |||||
SCORE 95 Build new elevator vestibule in existing parking garage. 98 sf. Client: Limited | Permit type: Building, electrical, mechanical | Permit status: N&v | Current use: Parking garage, existing | Permit id: Pmt2008-02112 | |||||
SCORE 96 Trench 10foot at ped 1137 connect conduit between ped & hh. Pull fiber from hh to customer at 1155 canyon and splice Date: November 17, 2008 Contractor: Infrasource Construction Services Client: Limited | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-05020 | |||||
SCORE 92 Installation of (1) new, non-electric, double-sided, suspended projecting wall sign. - inch brandzookainch - inchbcvinch Client: Limited | Permit type: Flood fence flood permit, sign | Permit status: Iss | Current use: Office - administrative, existing | Permit id: Pmt2017-02524 | |||||
SCORE 93 Interior demolition of an existing office suite to remove non-bearing partitions and remove affected electrical and mechanical, in order to market the suite to future tenants. All building permit requirements (energy code, accessibility, etc..) to be reviewed under future tenant remodel permit. Client: Limited | Permit type: Electrical, mechanical, demolition | Permit status: Cmp | Completion date: November 1, 2017 | Current use: Financial institution, existing | Permit id: Pmt2017-03775 | |||||
SCORE 95 Fs - due to demolition of existing finished tenant space, change pendant soprinkler heads into upright sprinkler heads. See pmt 2017-03775 for general building permit. Suite 100 Client: Limited | Permit type: Fire | Permit status: Iss | Current use: Financial institution, existing | Permit id: Pmt2017-04409 | |||||
SCORE 95 Temporary crane set-up to install planter on 3rd floor roof Date: August 27, 2008 Contractor: Black Roofing Inc Client: Larry Macarthur | Applicant: Black Roofing, Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 95 Temporary crane set-up to install planter on 3rd floor roof Date: August 27, 2008 Contractor: Black Roofing, Inc Client: Larry Macarthur | Permit type: Right-of-way | Permit status: Iss | Permit id: Pmt2008-03738 | |||||
SCORE 95 Remodel permit - to include interior finishes, shower addition, minor framing modifications, and relocation of washer dryer. Client: Robert Greenlee,Diane Greenlee | Applicant: Duggan Construction, Llc | Permit type: Building, electrical | Permit status: Cmp | Completion date: April 6, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 Scope of work letter relocation of five sprinkler heads for new tennant finish Date: November 10, 2011 Contractor: Fire Defense Inc Client: Diane Greenlee,Robert Greenlee | Applicant: Fire Defense, Inc. | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Multifamily dwe | |||||
SCORE 95 Tennant finish fire alarm for residential unit addition of one horn and relocation of one horn. Date: January 10, 2012 Contractor: Surelock Plus Llc Client: Jill Safari | Applicant: Surelock Plus, Llc | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Single family a | |||||
SCORE 95 Addition of indoor outdoor gas fireplace to storefront glass wall and relocating door in same in condo unit. Scope also includes partial remodel of kitchen to include second sink in kitchen island and relocation of gas supply for exterior barbeque. Client: Burguete Llc | Applicant: Colorado Choice Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 10, 2015 | Current use: Multifamily dwe | |||||
SCORE 95 Tennant finish fire alarm for residential unit addition of one horn and relocation of one horn. Client: Jill Safari | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Single family attached dwelling, existin | Permit id: Pmt2012-00104 | |||||
SCORE 95 Remodel permit - to include interior finishes, shower addition, minor framing modifications, and relocation of washer dryer. Client: Robert Greenlee | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: April 6, 2012 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2011-04386 | |||||
SCORE 95 Scope of work letter relocation of five sprinkler heads for new tennant finish Client: Diane Greenlee | Permit type: Fire | Permit status: Cmp | Completion date: June 18, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04940 | |||||
SCORE 95 Addition of indoor outdoor gas fireplace to storefront glass wall and relocating door in same in condo unit. Scope also includes partial remodel of kitchen to include second sink in kitchen island and relocation of gas supply for exterior barbeque. Client: Burguete Llc | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Cmp | Completion date: June 10, 2015 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2015-01339 |