Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 64 Install new racking in new warehouse t. B. K. B. Deferred sprinkler & alarm 1)fire access door every 1 (lineal) 2) 1-1 2" wet outlet @ fire access door 3) 2a10bc exinguisher every 75 4) letter from sprinkler company to verify density of system is adequate for products to be stored d. W. Date: March 12, 2014 Contractor: Stewart Specialty Services Inc.Restaurant Depot Permit status: Completed | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2014-01578 | |||||
SCORE 64 3 underground fire line 2 hydrants 1 water main tap Date: October 1, 2013 Contractor: K W Excavation Increstaurant Depot Permit type: Fire | Permit status: Completed | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-07170 | |||||
SCORE 64 Fire alarm system Date: November 21, 2013 Contractor: Powered Control Systemsrestaurant Depot Permit type: Low voltage | Permit status: Completed | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-08693 | |||||
SCORE 64 Warehouse building power to panel Date: February 6, 2014 Permit type: Electrical | Permit status: No certificate req | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2014-00796 | |||||
SCORE 100 1-flat sign Date: February 18, 2014 Contractor: Allied Awning And Rental Inc Permit type: Sign | Permit status: Pass | Completion date: May 16, 2014 | Permit id: Bld2014-01056 | |||||
SCORE 64 : deliver pole with 2 amp meter base. Set in existing hole Date: April 3, 2013 Contractor: Hunt Electricpole Replacement Permit type: Electrical | Permit status: Pass | Completion date: May 14, 2014 | Current use: Commercial | Permit id: Bld2013-01972 | |||||
SCORE 64 Commercial site development consisting of an approximatly 54,6 s. F. Building. Date: December 24, 2012 Contractor: Oltmans Construction Corestaurant Depot Permit status: Cert occ no warranty | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2012-09304 | |||||
SCORE 64 Install new flat signs (3) on two elevations and (2) directional signs a. M. Date: June 4, 2013 Contractor: Allied Awning And Rental Increstaurant Depot Permit type: Sign | Permit status: Pass | Completion date: May 16, 2014 | Permit id: Bld2013-03650 | |||||
SCORE 64 37 plumbing fixtures, 3 water heaters, water piping, 4 hose bibbs, 2 backflow preventors, & gas piping. Date: November 19, 2013 Contractor: Kozco Mechanical Increstaurant Depot Permit type: Plumbing | Permit status: No certificate req | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-08592 | |||||
SCORE 64 All power and lighting as per plans and specs temp power, power to panel, and fire alarm authorized by seperate permits. Date: October 3, 2013 Contractor: Electrical Contractors North Increstaurant Depot Permit type: Electrical | Permit status: Completed | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-07261 | |||||
SCORE 64 Install new refrigeration system. For new store construction. Date: October 30, 2013 Contractor: Source Refrigeration And Hvacrestaurant Depot Permit type: Mechanical | Permit status: No certificate req | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-08244 | |||||
SCORE 72 Ground up construction. Fire sprinkler drawings were pre-engineered and submitted with the permit construction documents. We have used the same drawings but have done a flow test and re-issued flow calculations. Date: July 31, 2013 Contractor: Restaurant Depot Permit type: Fire | Permit status: No certificate req | Completion date: May 21, 2014 | Current use: Commercial | Permit id: Bld2013-05343 |