King county to install approximately 5 feet c-curb on ne 124th street eastbound left-turn lane. Date: August 13, 2014 Applicant: George Dudley | Permit type: Right of way | Permit id: Row-2014-06878 | Parcel: 2526059023 | |||||
King county to collect miovision traffic turning movement counts 6am and 9am at three intersections. Date: June 21, 2016 Applicant: Trinh Truong | Permit type: Right of way | Permit id: Row-2016-05420 | Parcel: 2526059147 | |||||
SCORE 80 Frontage conversion - remove existing pole within right-of-way. Install conduit within developer easement. Date: October 6, 2014 Contractor: Paul Peterson Permit type: Right of way | Permit id: Row-2014-07892 | Parcel: 2526059068 | |||||
SCORE 86 Frontage conversion - remove existing pole within right-of-way. Install conduit within developer easement. Date: October 6, 2014 Contractor: Pse Potelco Permit type: Right of way | Permit id: Row-2014-07892 | Parcel: 2526059068 | |||||
SCORE 86 Frontage conversion - remove existing pole within right-of-way. Install conduit within developer easement. Date: October 6, 2014 Contractor: Pse Potelco Permit type: Right of way | Permit id: Row-2014-07892 | |||||
SCORE 56 Performing emergency temporary service restoration 24 hours daily involving mh13/ mh14/ mh15/ mh16 along redmond way. Date: October 8, 2014 Contractor: Marilee Crivello Applicant: Mike Hakahan | Permit type: Right of way | Permit id: Row-2014-08140 | Parcel: 7792400230 | |||||
Performing emergency temporary service restoration 24 hours daily involving mh13 mh14 mh15 mh16 along redmond way. Date: October 8, 2014 Applicant: Mike Hakahan | Permit type: Right of way | Permit id: Row-2014-08140 | Parcel: 7792400230 | |||||
Frontier maintenance technicians to enter multiple manholes for brief or extended periods of time. Work on redmond way tentatively to be performed between 9pm-5am. Work on all other streets to be performed during normal business hours. Referenced permit 12-031. Date: November 21, 2014 Applicant: Mike Hakahan | Permit type: Right of way | Permit id: Row-2014-09244 | Parcel: 1225059031 | |||||
Installing a city of redmond street light pole that was previously knocked down/ per city of redmond direction. An accompanying traffic control plan for a right lane closure of avondale way is included. The work site is south of ne union hill road on the se side of the street right by the bear creek trail. Date: November 26, 2014 Applicant: Bob Bracco | Permit type: Right of way | Permit id: Row-2014-09393 | Parcel: 1225059064 | |||||
Chablis demo-demolish one story w/ basement 33 sq ft single family building and 3 sq ft shed. (2 structures total) abandon gas and electric by pse/ phone and cable by provider/ abandon any septic/drainfield areas per health department. Abandon well/water. Date: August 29, 2014 Value: $15,000 Applicant: Eric Weisenstein | Permit type: Demolition | Permit id: Demo-2014-06850 | Parcel: 3526059005 | |||||
Trench 4 feet for overhead to underground conversion along the frontage of chablis development including installation of underground conduit and installation of cable within those conduits. Remove overhead wires and pole along frontage. Date: September 21, 2015 Permit type: Right of way | Permit id: Row-2015-06857 | Parcel: 3526059005 | |||||
Installing a city of redmond street light pole that was previously knocked down/ per city of redmond direction. An accompanying traffic control plan for a right lane closure of avondale way is included. The work site is south of ne union hill road on the se side of the street right by the bear creek trail. Date: November 26, 2014 Applicant: Bob Bracco | Permit type: Right of way | Permit id: Row-2014-09393 | Parcel: 1225059064 | |||||
Installing a city of redmond street light pole that was previously knocked down per city of redmond direction. An accompanying traffic control plan for a right lane closure of avondale way is included. The work site is south of ne union hill road on the se side of the street right by the bear creek trail. Date: November 26, 2014 Applicant: Bob Bracco | Permit type: Right of way | Permit id: Row-2014-09393 | Parcel: 1225059064 | |||||
SCORE 99 Chablis demo-demolish one story w basement 33 sq ft single family building and 3 sq ft shed. (2 structures total) abandon gas and electric by pse phone and cable by provider abandon any septic drainfield areas per health department. Abandon well water. Applicant: Eric Weisenstein | Permit type: Demolition | Permit id: Demo-2014-06850 | Parcel: 3526059005 | |||||
Trench 4 feet for overhead to underground conversion along the frontage of chablis development including installation of underground conduit and installation of cable within those conduits. Remove overhead wires and pole along frontage. Date: September 21, 2015 Permit type: Right of way | Permit id: Row-2015-06857 | Parcel: 3526059005 | |||||
SCORE 99 Chablis demo-demolish one story w basement 33 sq ft single family building and 3 sq ft shed. (2 structures total) abandon gas and electric by pse phone and cable by provider abandon any septic drainfield areas per health department. Abandon well water. Applicant: Eric Weisenstein | Permit type: Demolition | Permit id: Demo-2014-06850 |