Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Repair 4" fireline leak between building and sidewalk. Set up pedestrian control for excavation equipment in row. ![]() ![]() Client: Hospital Community | Applicant: Drain O Rooter | Permit type: Right-of-way | Permit status: Iss | Current use: Hospital/instit | |||||
SCORE 91 Repair of existing spanner - directional bore of 2 to replace . 625 coaxial cable. ![]() ![]() Client: Hospital Community | Applicant: Tetra Tech Construction Services | Permit type: Right-of-way, flood | Permit status: Act | |||||
SCORE 91 Maintenance repair - directional bore of 2 to replace . 625 coaxial cable (emergency) ![]() ![]() Client: Hospital Community | Applicant: Tetra Tech Construction Services | Permit type: Right-of-way, flood | Permit status: Iss | |||||
SCORE 95 Emergency repair of underground waterline at boulder community hospital. ![]() ![]() Client: Hospital Community | Applicant: Drain-O-Rooter | Permit type: Plumbing | Permit status: N&v | Current use: Hospital/instit | |||||
SCORE 95 Fire sprinkler system - 3rd floor ![]() ![]() Client: Community Hospital Association Inc | Applicant: Simplex Grinnell | Permit type: Fire, flood not requ | Permit status: Cmp | Completion date: January 13, 2003 | Current use: Medical and den | |||||
SCORE 88 Fire sprinkler system - pain management ![]() ![]() Client: Community Hospital Association | Applicant: Faehnrich Fire Protection Inc | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/instit | |||||
SCORE 99 Remodel of a portion (1084 s. F.) of the first floor medical offices. Treatment and recovery room. No increase in floor area. Client: Community Hospital Assoc. | Applicant: Gerald H Phipps Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 9, 2001 | Current use: Hospital/instit | |||||
SCORE 100 Interior remodel on first floor for boulder surgery center - pain center to install additional patient chair, 1 interio door, 4 electrical outlets and relocate medical gas shut-off. Client: Hospital Community | Applicant: Faurot Construction Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Medical and den | |||||
SCORE 95 Intrerior non-structural remodel permit to remove partition walls, plumbing fixtures, and minor repair due to scope of work. Work includes associated pes. Client: Hospital Community | Permit type: Building, electrical, plumbing | Permit status: Cmp | Completion date: March 28, 2016 | Current use: Government uses, remodel | Permit id: Pmt2016-00804 | |||||
SCORE 99 Remodel of a portion (1084 s. F.) of the first floor medical offices. Treatment and recovery room. No increase in floor area. Client: Community Hospital Assoc. | Permit type: Building, electrical, mechanical, plumbing, flood not required | Permit status: Cmp | Completion date: November 9, 2001 | Current use: Hospital/institutional, remodel | Permit id: Pmt2001-02766 | |||||
SCORE 88 Fire sprinkler system - pain management Client: Community Hospital Association | Permit type: Fire | Permit status: Cmp | Completion date: December 5, 2001 | Current use: Hospital/institutional, existing | Permit id: Pmt2001-03759 | |||||
SCORE 100 Interior remodel on first floor for boulder surgery center - pain center to install additional patient chair, 1 interio door, 4 electrical outlets and relocate medical gas shut-off. Client: Hospital Community | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Medical and dental clinics, tenant remod | Permit id: Pmt2012-04407 | |||||
SCORE 95 Interior non-structural demolition and demolition of roof covering for the brenton building in advance of issuance of permit for tenant finish for new city staff offices. Demo includes removal of mechanical equipment and screening. ![]() ![]() Client: City Of Boulder | Permit type: Demolition | Permit status: Iss | Current use: Government uses, existing | Permit id: Pmt2017-01194 | |||||
SCORE 95 Fire sprinkler system - 3rd floor Client: Community Hospital Association Inc | Permit type: Fire, flood not required | Permit status: Cmp | Completion date: January 13, 2003 | Current use: Medical and dental clinics, existing | Permit id: Pmt2002-02991 | |||||
SCORE 91 Maintenance repair - directional bore of 220foot to replace . 625 coaxial cable (emergency) ![]() ![]() Client: Hospital Community | Permit type: Right-of-way, flood not required | Permit status: Iss | Permit id: Pmt2002-04825 | |||||
SCORE 91 Repair of existing spanner - directional bore of 220foot to replace . 625 coaxial cable. ![]() Client: Hospital Community | Permit type: Right-of-way, flood not required | Permit status: Act | Permit id: Pmt2002-04925 | |||||
SCORE 95 Emergency repair of underground waterline at boulder community hospital. Client: Hospital Community | Permit type: Plumbing | Permit status: N&v | Current use: Hospital/institutional, existing | Permit id: Pmt2005-03414 | |||||
SCORE 95 Repair 4inch fireline leak between building and sidewalk. Set up pedestrian control for excavation equipment in row. ![]() ![]() Client: Hospital Community | Permit type: Right-of-way | Permit status: Iss | Current use: Hospital/institutional, existing | Permit id: Pmt2005-03455 | |||||
SCORE 95 Interior tenant remodel. Scope includes remodel of all 4 levels of building, removal of interior partition walls, all new finishes, plumbing fixtures (decreasing number of fixtures). Structural changes include new stairwell openings and new accessible ramp. Exterior changes limited to exterior ramp, removal of small addition, and new main entry doorway in existing opening. Includes associated mep. Associated with adr2017-00142 (sitework deferral) and adr2017-00143 (front setback variance). Client: Of City | Permit type: Building, electrical, mechanical, plumbing | Permit status: Def | Current use: Government uses, tenant remodel | Permit id: Pmt2017-01869 | |||||
SCORE 86 Fa - fire alarm system for four floors of brenton building tenant finish. See pmt 2017-01869 for general building permit. Client: Of City | Permit type: Fire | Permit status: Iss | Current use: Government uses, existing | Permit id: Pmt2017-03153 | |||||
SCORE 98 Fire sprinkler system - tentent finish and completely sprinkler the remaining of the building Client: Of City | Permit type: Fire | Permit status: Iss | Current use: Government uses, existing | Permit id: Pmt2017-03322 | |||||
SCORE 99 Total tear-off & reroof of a government building, 55 squares of tpo on a pitch represented as 1 4inch ft. All roof materials shall be installed per manufacturerfoots specs. Client: Of City | Permit type: Roofing | Permit status: Iss | Current use: Government uses, existing | Permit id: Pmt2017-03739 |