Building Permits at 113 Holton St Brighton MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 113 Holton St Brighton MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
Replace existing dry sidewall sprinkler heads with new code compliant dry sidewall sprinkler heads to avoid future freezing. 12 total heads. Bfd paid detail required - 1 officer &; 3 firefighters w pump (per dfc: only 1 detail for holton and litchfield streets contractor project is all in the same area).
Date:  April 24, 2017

Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk693936 | Parcel: 2200863010
2017/04/24082113 Holton St Brighton MaCovenant Fire Protection Inc
Install one ten [10] foot driveway opening ; boston police area d; 343-4210; maintain pedestrian safety ; completed driveway must meet ada and city standards.
Date:  April 22, 2015

Client: Harvard Re Allston Inc | Permit type: Driveway excavation permit | Expiration date: May 4, 2015 | Permit id: Drive-462018 | Parcel: 2200863010
2015/04/22095113 Holton St Brighton Ma
SCORE
100
New construction of townhouses
Date:  July 18, 2014
Value:   $140,000
Contractor: Bruce Dubeau

Client: Harvard Re Allston Inc | Permit type: Electrical permit | Expiration date: January 18, 2015 | Current use: Multi | Permit id: E384856 | Parcel: 2200863010
2014/07/18140000100113 Holton St Brighton MaBruce Dubeau
Sidewalk construction ; boston police area d; 343-4210; 7 am to 4 pm; weekdays only; ; no street closure ;
Date:  April 9, 2015

Client: Harvard Re Allston Inc | Permit type: Excavation permit | Expiration date: April 19, 2015 | Permit id: Exca-461519 | Parcel: 2200863010
2015/04/09095113 Holton St Brighton Ma
SCORE
100
4 ranges and 4 navien combo boiler water heater units
Date:  May 12, 2014
Value:   $20,000
Contractor: Keith Rhodes

Client: Harvard Re Allston Inc | Permit type: Gas permit | Expiration date: November 12, 2014 | Current use: 1-4fam | Permit id: G358593 | Parcel: 2200863010
2014/05/1220000100113 Holton St Brighton MaKeith Rhodes
Install one ten [10] residential driveway for 113-115 holton street; ; deposit will be held until a;written request is sent to public works requesting a site visit by a;pwd engineer to verify that the completed work meets city &; ada standards.
Date:  April 22, 2015

Client: Harvard Re Allston Inc | Permit type: Sidewalk deposit | Permit id: Sdep-462254 | Parcel: 2200863010
2015/04/22095113 Holton St Brighton Ma
SCORE
100
New plumbing
Date:  May 12, 2014
Value:   $19,000
Contractor: Keith Rhodes

Client: Harvard Re Allston Inc | Permit type: Plumbing permit | Expiration date: November 12, 2014 | Current use: 1-4fam | Permit id: Pl358631 | Parcel: 2200863010
2014/05/1219000100113 Holton St Brighton MaKeith Rhodes
SCORE
79
Complete new nfpa-13r sprinkler system
Date:  September 30, 2014
Value:   $10,000
Contractor: Christopher Hadik

Client: Harvard Re Allston Inc | Permit type: Long form/alteration permit | Expiration date: March 30, 2015 | Current use: 1-4fam | Permit id: Alt405284 | Parcel: 2200863010
2014/09/301000079113 Holton St Brighton MaChristopher Hadik
Sidewalk deposit during construction ; this is not a permit to excavate occupy or install driveways- separate permits are required.; deposit will be returned if restored sidewalks meet city specifications and slope requirements; permit; 60. 00; inspection 200. 00; deposit
Date:  September 25, 2014

Client: Harvard Re Allston Inc | Permit type: Sidewalk deposit | Permit id: Sdep-411117 | Parcel: 2200863010
2014/09/25095113 Holton St Brighton Ma
SCORE
82
Charlesview redevelopment project; -;erect a new 3 story wood-frame;building of four ( 4 );residential units.;
Date:  March 5, 2014
Value:   $580,766
Contractor: Kenneth Calder

Client: Harvard Re Allston Inc | Permit type: Erect/new construction | Expiration date: September 5, 2014 | Current use: 1-4fam | Permit id: Ert283303 | Parcel: 2200863010
2014/03/0558076682113 Holton St Brighton MaKenneth Calder
SCORE
82
4 family dwelling coo for 4 family dwelling ert2833303 issued: 3 5 2014;
Date:  January 29, 2015
Value:   $580,766
Contractor: Kenneth Calder

Client: Harvard Re Allston Inc | Permit type: Certificate of occupancy | Current use: 1-4fam | Permit id: Coo442587 | Parcel: 2200863010
2015/01/2958076682113 Holton St Brighton MaKenneth Calder
SCORE
100
New construction of townhouses 113 to 123a holton street.
Date:  August 14, 2014
Value:   $7,200
Contractor: Bruce Dubeau

Client: Harvard Re Allston Inc | Permit type: Electrical fire alarms | Expiration date: February 14, 2015 | Current use: 1-2fam | Permit id: Efa390614 | Parcel: 2200863010
2014/08/147200100113 Holton St Brighton MaBruce Dubeau
Temporary placement of dumpster for debris removal
Date:  April 18, 2014

Client: Harvard Re Allston Inc | Permit type: Bfd temporary dumpster | Permit id: Td353498 | Parcel: 2200863010
2014/04/18095113 Holton St Brighton Ma
Work being done from 113 - 113a holton st. - complete new nfpa-13r. Work to be done per nfpa stands 7 cmr.
Date:  September 2, 2014

Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk394741 | Parcel: 2200863010
2014/09/02095113 Holton St Brighton Ma
Bfd smoke/co inspection and
Date:  February 11, 2015

Client: Harvard Re Allston Inc | Expiration date: April 12, 2015 | Current use: 1unit | Permit id: Smk446922 | Parcel: 2200863010
2015/02/11095113 Holton St Brighton Ma
SCORE
100
New construction of 2 2 unit townhouses.
Date:  August 25, 2014
Value:   $3,000
Contractor: Bruce Dubeau

Client: Harvard Re Allston Inc | Permit type: Electrical low voltage | Expiration date: February 25, 2015 | Current use: 1-4fam | Permit id: Elv395381 | Parcel: 2200863010
2014/08/253000100113 Holton St Brighton MaBruce Dubeau
Installation of new fire alarm system doc#20141615; new construction of residential townhouse development.
Date:  January 8, 2015

Client: Harvard Re Allston Inc | Permit type: Bfd fire alarm installations | Permit id: Bfdf430153 | Parcel: 2200863010
2015/01/08095113 Holton St Brighton Ma
SCORE
100
4 temp heater 1 0 btus each
Date:  December 11, 2014
Value:   $20,000
Contractor: Keith Rhodes

Client: Harvard Re Allston Inc | Permit type: Gas permit | Expiration date: June 11, 2015 | Current use: 1-4fam | Permit id: G433132 | Parcel: 2200863010
2014/12/1120000100113 Holton St Brighton MaKeith Rhodes
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.