Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 96 Install 5 kw grid tied solar pv system Permit type: Renovation (non-structural) | Permit status: Certificate of occupancy | Current use: Single family | |||||
SCORE 98 Solar panels- 13-12254 Date: May 10, 2013 Contractor: Herman Mcclain Client: Dietrich A Thomas | Permit type: Solar | Permit status: Permit issued | Current use: Single family | |||||
SCORE 96 Shoring job- raise ac unit/brad 382-9672/ck#11597. Date: July 10, 2012 Contractor: Brad Galpin Client: Dietrich A Thomas | Permit type: General mechanical | Permit status: Certificate of completion | Current use: Single family | |||||
SCORE 89 Elevate single to or above the requred base flood elevation of -4. 00navd. Foundation plans required on site at all inspections. No change in praking or square footage. Client: Dietrich A Thomas | Permit type: Renovation (structural) | Permit status: Certificate of occupancy | Current use: Single family | |||||
SCORE 89 Lowering service- 12-bld-08053 Date: July 16, 2012 Contractor: Christopher Robert Hoke Client: Dietrich A Thomas | Permit type: Electrical repair / replacement / addition | Permit status: Permit issued | Current use: Single family | |||||
SCORE 96 Shoring job- raise ac unit brad 382-9672 ck#11597. Date: July 10, 2012 Contractor: Brad Galpin Client: Dietrich A Thomas | Permit type: General mechanical | Permit status: Certificate of completion | Current use: Single family |