Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 83 Equipment work Date: March 9, 1998 Contractor: Stephen Touhey Co Permit status: Permit issued | Permit id: 10155243702 | |||||
SCORE 83 Equipment work Date: January 19, 1999 Contractor: Stephen Touhey Co Permit status: Permit issued | Permit id: 10155243703 | |||||
SCORE 82 Sign Date: June 3, 2005 Contractor: L S Sign Co. Inc Permit status: Permit issued | Permit id: 10410920601 | |||||
SCORE 67 Equipment work Date: September 14, 1995 Contractor: J. Stern Contracting Corp Permit status: Permit issued | Permit id: 10071684201 | |||||
Equipment work Date: November 1, 1996 Permit status: Permit issued | Permit id: 10071683301 | |||||
SCORE 56 Equipment work Date: February 6, 1996 Contractor: Chelsea Brewing Co Co Permit status: Permit issued | Permit id: 10123427301 | |||||
SCORE 99 Equipment work Date: July 8, 1998 Contractor: Sentinel Fire Control Permit status: Permit issued | Permit id: 10185259501 | |||||
SCORE 65 Equipment work Date: February 27, 1996 Contractor: Gc Contractors Permit status: Permit issued | Permit id: 10124480501 | |||||
SCORE 63 Equipment work Date: December 21, 1995 Contractor: Abcon Assoc Permit status: Permit issued | Permit id: 10116844201 | |||||
Equipment work Date: July 6, 1999 Permit status: Permit issued | Permit id: 10225501501 | |||||
SCORE 56 Equipment work Date: September 26, 2006 Contractor: Double Contracting Inc Permit status: Permit issued | Permit id: 10454645801 | |||||
SCORE 89 Plumbing Date: January 30, 2007 Contractor: Wagner Ziv Plumbing Permit status: Permit issued | Permit id: 10454645801 | |||||
SCORE 65 Equipment work Date: February 12, 2010 Contractor: Obo Llc Permit status: Permit issued | Permit id: 12026433801 | |||||
SCORE 56 Equipment work Date: January 28, 2008 Contractor: Chelsea Pers Management Permit status: Permit issued | Permit id: 11007430201 | |||||
SCORE 70 Equipment work Date: March 28, 2013 Contractor: Production Resource Group Permit status: Permit issued | Permit id: 12157096901 | |||||
SCORE 99 Equipment work Date: April 28, 2010 Contractor: Lmd Partners Inc Permit status: Permit issued | Permit id: 12027729901 | |||||
SCORE 61 Plumbing Date: April 22, 1996 Contractor: Bx Mechincal Corp Permit status: Permit issued | Permit id: 10102950201 | |||||
SCORE 83 Equipment work Date: June 1, 1995 Contractor: Stephen Touhey Co Permit status: Permit issued | Permit id: 10104522701 | |||||
SCORE 100 Plumbing Date: March 19, 1998 Contractor: J.M. Botto Inc Permit status: Permit issued | Permit id: 10174911901 | |||||
SCORE 98 Equipment work Date: May 15, 1998 Contractor: All City Metal Inc Permit status: Permit issued | Permit id: 10181208601 | |||||
SCORE 56 Equipment work Date: May 11, 1998 Contractor: Uni Mac Incorportated Permit status: Permit issued | Permit id: 10176368201 | |||||
SCORE 99 Equipment work Date: September 29, 1998 Contractor: Harvard Fire Protection Inc Permit status: Permit issued | Permit id: 10171688601 | |||||
SCORE 64 Plumbing Date: May 29, 1998 Contractor: Duo Pl And Ht Corp Permit status: Permit issued | Permit id: 10176368201 | |||||
SCORE 100 Equipment work Date: February 6, 2007 Contractor: Firemasters Permit status: Permit issued | Permit id: 10466701301 | |||||
SCORE 62 Plumbing Date: April 12, 2001 Contractor: Colhren Plumbing And Heating Permit status: Permit issued | Permit id: 10252199601 | |||||
SCORE 69 Equipment work Date: November 9, 2001 Contractor: Colbren Plumb Heat Permit status: Permit issued | Permit id: 10252199601 | |||||
SCORE 99 Sign Date: February 7, 2000 Contractor: Spectrum Sign Inc Permit status: Permit issued | Permit id: 10243564201 | |||||
SCORE 100 Plumbing Date: February 22, 2000 Contractor: Perfect Plumbing And Heating Permit status: Permit issued | Permit id: 10232606501 | |||||
SCORE 56 Equipment work Date: December 1, 1999 Contractor: Chelsea Piers Magt Permit status: Permit issued | Permit id: 10232606501 | |||||
SCORE 100 Equipment work Date: March 1, 1995 Contractor: A.J Contracting Co Inc Permit status: Permit issued | Permit id: 10094228702 | |||||
SCORE 89 Equipment work Date: April 23, 1996 Contractor: Stephen Touhey Company Permit status: Permit issued | Permit id: 10128131901 | |||||
SCORE 56 Equipment work Date: April 10, 2001 Contractor: Chelsea Piers Man Permit status: Permit issued | Permit id: 10252199601 | |||||
SCORE 56 Equipment work Date: April 18, 2001 Contractor: Korman Didign And Build Permit status: Permit issued | Permit id: 10252937301 | |||||
SCORE 100 Equipment work Date: March 1, 1995 Contractor: Aj Contracting Corp Permit status: Permit issued | Permit id: 10070697902 | |||||
SCORE 92 Equipment work Date: February 21, 2007 Contractor: Chelsea Piers Lp Permit status: Permit issued | Permit id: 10468096201 | |||||
SCORE 100 Equipment work Date: May 1, 2007 Contractor: Reliable Fire Protection Corp Permit status: Permit issued | Permit id: 10454892801 | |||||
SCORE 56 Equipment work Date: August 1, 2006 Contractor: Castlevale Construction Ent Permit status: Permit issued | Permit id: 10445250201 | |||||
SCORE 83 Equipment work Date: August 15, 1997 Contractor: Stephen Touhey Co Permit status: Permit issued | Permit id: 10155243701 | |||||
SCORE 98 Sign Date: December 16, 2005 Contractor: Ls Sign Co Inc Permit status: Permit issued | Permit id: 10425590301 | |||||
SCORE 98 Equipment work Date: March 28, 2007 Contractor: Lund Fire Product Co Inc Permit status: Permit issued | Permit id: 10469290401 | |||||
Equipment work Date: February 13, 2007 Permit status: Permit issued | Permit id: 10462299001 | |||||
SCORE 89 Equipment work Date: April 12, 1996 Contractor: Winter Construction Co Permit status: Permit issued | Permit id: 10127226701 | |||||
SCORE 56 Equipment work Date: April 16, 1997 Contractor: H.M Hughs Inc Permit status: Permit issued | Permit id: 10150478401 | |||||
Equipment work Date: July 22, 1997 Permit status: Permit issued | Permit id: 10148509101 | |||||
Sign Date: December 15, 2005 Permit status: Permit issued | Permit id: 10425414701 | |||||
SCORE 56 Sign Date: July 28, 2005 Contractor: North Sore Neon Sign Co Inc Permit status: Permit issued | Permit id: 10413296601 | |||||
SCORE 100 Sign Date: November 6, 2006 Contractor: Berger Signs Inc Permit status: Permit issued | Permit id: 10449024901 | |||||
SCORE 78 Equipment work Date: May 18, 2005 Contractor: Chelsea Piers Management Permit status: Permit issued | Permit id: 10410897501 | |||||
SCORE 62 Equipment work Date: November 14, 2006 Contractor: Chelsea Pier Lp Permit status: Permit issued | Permit id: 10404449103 | |||||
SCORE 100 Sign Date: January 16, 2007 Contractor: Berger Signs Inc Permit status: Permit issued | Permit id: 10448983001 | |||||
SCORE 82 Plumbing Date: July 18, 2008 Contractor: First Choice Plumbing Corp Permit status: Permit issued | Permit id: 10454645802 | |||||
SCORE 78 Equipment work Date: July 16, 2004 Contractor: Chelsea Piers Management Permit status: Permit issued | Permit id: 10383654701 | |||||
SCORE 93 Equipment work Date: June 11, 2004 Contractor: Air Force Mechanical Corp Permit status: Permit issued | Permit id: 10379466301 | |||||
SCORE 99 Plumbing Date: June 18, 2004 Contractor: Richard Lynes Plumbing And Heatin Permit status: Permit issued | Permit id: 10379466301 | |||||
SCORE 100 Equipment work Date: November 19, 1998 Contractor: Expert Sprinkler Permit status: Permit issued | Permit id: 10134885502 | |||||
SCORE 87 Equipment work Date: July 29, 1996 Contractor: Bronx Mechanical Corp Permit status: Permit issued | Permit id: 10134885501 | |||||
SCORE 99 Alteration Date: October 29, 1996 Contractor: Artkraft Strauss Sign Corp Permit status: Permit issued | Permit id: 10136727201 | |||||
SCORE 99 Alteration Date: March 18, 1997 Contractor: Artkraft Strauss Sign Corp Permit status: Permit issued | Permit id: 10136727202 | |||||
SCORE 83 Equipment work Date: September 17, 1996 Contractor: Stephen Touhey Co Permit status: Permit issued | Permit id: 10136970601 | |||||
SCORE 56 Sign Date: December 15, 2005 Contractor: I.S. Sign Co Inc Permit status: Permit issued | Permit id: 10425589601 | |||||
SCORE 62 Equipment work Date: December 20, 2005 Contractor: Chelsea Pier Lp Permit status: Permit issued | Permit id: 10404449102 | |||||
SCORE 99 Sign Date: September 14, 1998 Contractor: American Sign Crafters Permit status: Permit issued | Permit id: 10163436801 | |||||
SCORE 89 Equipment work Date: January 19, 1999 Contractor: Stephen Touhey Company Permit status: Permit issued | Permit id: 10158988003 | |||||
SCORE 62 Equipment work Date: November 17, 1997 Contractor: Chelsea Piers Mangement Permit status: Permit issued | Permit id: 10166219401 | |||||
SCORE 62 Equipment work Date: August 27, 1998 Contractor: Chelsea Piers Mangement Permit status: Permit issued | Permit id: 10166219402 | |||||
SCORE 89 Equipment work Date: October 16, 1997 Contractor: Stephen Touhey Company Permit status: Permit issued | Permit id: 10158988001 | |||||
SCORE 89 Equipment work Date: March 9, 1998 Contractor: Stephen Touhey Company Permit status: Permit issued | Permit id: 10158988002 | |||||
SCORE 98 Equipment work Date: November 26, 1997 Contractor: Stephen Touhey Permit status: Permit issued | Permit id: 10158987101 | |||||
SCORE 100 Sign Date: February 9, 1999 Contractor: National Maintenance Inc Permit status: Permit issued | Permit id: 10173860201 | |||||
SCORE 100 Plumbing Date: February 12, 1998 Contractor: Perfect Plg And Htg Permit status: Permit issued | Permit id: 10155243701 | |||||
SCORE 100 Equipment work Date: January 23, 1997 Contractor: Cw Brown Inc Permit status: Permit issued | Permit id: 10143007901 | |||||
SCORE 62 Equipment work Date: August 30, 1996 Contractor: Corporate Interiors Co Permit status: Permit issued | Permit id: 10136112501 | |||||
SCORE 56 Equipment work Date: March 18, 1998 Contractor: Chelsea Peirs Managenment Permit status: Permit issued | Permit id: 10174911901 | |||||
SCORE 99 Equipment work Date: March 9, 2006 Contractor: Richard Lynes Plbg And Htg Permit status: Permit issued | Permit id: 10225959201 | |||||
SCORE 100 Equipment work Date: April 18, 2001 Contractor: Korman Design And Build Permit status: Permit issued | Permit id: 10252937301 | |||||
SCORE 96 Equipment work Date: November 22, 1995 Contractor: Abcon Associates Permit status: Permit issued | Permit id: 10115453601 | |||||
Equipment work Date: August 15, 1995 Permit status: Permit issued | Permit id: 10104519201 | |||||
SCORE 56 Equipment work Date: July 12, 1995 Contractor: Agb Capital Properties Inc Permit status: Permit issued | Permit id: 10106723901 | |||||
SCORE 56 Equipment work Date: June 14, 1995 Contractor: Martack Co Permit status: Permit issued | Permit id: 10105375201 | |||||
SCORE 56 Equipment work Date: October 31, 1995 Contractor: Winter Constr. Co Permit status: Permit issued | Permit id: 10105713301 | |||||
SCORE 100 Equipment work Date: June 24, 1994 Contractor: Aj Contracting Corp Permit status: Permit issued | Permit id: 10070697901 | |||||
SCORE 65 Plumbing Date: October 12, 1995 Contractor: Jam Sewer Cleaning Serv Inc Permit status: Permit issued | Permit id: 10113274801 | |||||
SCORE 56 Equipment work Date: October 23, 1995 Contractor: Eric N Singer And Aasso Aia Permit status: Permit issued | Permit id: 10114128401 | |||||
SCORE 89 Equipment work Date: July 24, 1996 Contractor: J. Caiazzo Pl And Heating Corp Permit status: Permit issued | Permit id: 10131299101 | |||||
SCORE 96 Plumbing Date: February 6, 1996 Contractor: J. Caiazzo Plg And Htg Permit status: Permit issued | Permit id: 10123427301 | |||||
SCORE 78 Plumbing Date: July 30, 1996 Contractor: J. Caiazzo Plg Permit status: Permit issued | Permit id: 10130619601 | |||||
SCORE 100 Plumbing Date: July 29, 1996 Contractor: Perfect Plumbing And Heating Permit status: Permit reissued | Permit id: 10134885501 | |||||
Equipment work Date: August 16, 2012 Permit status: Permit issued | Permit id: 12022505003 | |||||
SCORE 56 Equipment work Date: July 6, 1994 Contractor: A.J. Contracing Permit status: Permit issued | Permit id: 10085647801 | |||||
SCORE 100 Equipment work Date: September 29, 1995 Contractor: Aj Contracting Co. Inc Permit status: Permit issued | Permit id: 10108820701 | |||||
SCORE 100 Sign Date: January 13, 1995 Contractor: L.S. Sign Co. Inc Permit status: Permit issued | Permit id: 10096439701 | |||||
SCORE 99 Equipment work Date: September 23, 1994 Contractor: Harvard Fire Protection Inc Permit status: Permit issued | Permit id: 10086721501 | |||||
SCORE 81 Plumbing Date: March 24, 1995 Contractor: Pace Plmb. Corp Permit status: Permit reissued | Permit id: 10085647801 | |||||
SCORE 100 Equipment work Date: November 23, 1994 Contractor: A.J Contracting Co Inc Permit status: Permit issued | Permit id: 10094228701 | |||||
SCORE 56 Plumbing Date: May 17, 1994 Contractor: Sparaco Plg. Htg. Corp Permit status: Permit issued | Permit id: 10079222401 | |||||
SCORE 56 Equipment work Date: May 1, 1995 Contractor: J.Stern Contracting Corp.On Permit status: Permit reissued | Permit id: 10079223301 | |||||
SCORE 56 Equipment work Date: March 28, 1994 Contractor: G.P Winter Assoaictes Permit status: Permit issued | Permit id: 10079222401 | |||||
SCORE 100 Plumbing Date: October 24, 1995 Contractor: George Breslaw And Sons Inc Permit status: Permit issued | Permit id: 10114128401 | |||||
SCORE 100 Equipment work Date: May 2, 1996 Contractor: Ideal Fire Control Permit status: Permit issued | Permit id: 10130619601 | |||||
Equipment work Date: May 15, 1998 Permit status: Permit issued | Permit id: 10181208601 | |||||
Equipment work Date: June 29, 2009 Permit status: Permit issued | Permit id: 11007430203 | |||||
Equipment work Date: January 6, 2010 Permit status: Permit issued | Permit id: 12023230001 | |||||
SCORE 99 Equipment work Date: August 30, 1995 Contractor: Pace Plg Corp Permit status: Permit issued | Permit id: 10071721701 | |||||
SCORE 100 Plumbing Date: December 1, 1995 Contractor: Ara Plumbing And Heating Permit status: Permit issued | Permit id: 10115453601 | |||||
SCORE 99 Equipment work Date: January 19, 2012 Contractor: J Caiazzo P And H Corp Permit status: Permit issued | Permit id: 12095024801 | |||||
SCORE 100 Plumbing Date: April 29, 1997 Contractor: Pace Plumbing Corp Permit status: Permit issued | Permit id: 10149923701 | |||||
SCORE 100 Plumbing Date: October 17, 1995 Contractor: Pace Plumbing Corp Permit status: Permit issued | Permit id: 10070697901 | |||||
SCORE 97 Equipment work Date: October 30, 2009 Contractor: Double R Contracting Inc Permit status: Permit issued | Permit id: 12015488502 | |||||
SCORE 97 Equipment work Date: May 3, 2010 Contractor: Double R Contracting Inc Permit status: Permit issued | Permit id: 12031102801 | |||||
Equipment work Date: February 4, 2011 Permit status: Permit issued | Permit id: 12022505002 | |||||
SCORE 99 Alteration Date: November 23, 2011 Contractor: Vertical Solutions Inc Permit status: Permit issued | Permit id: 12075411101 | |||||
SCORE 89 Equipment work Date: March 28, 2012 Contractor: T.C. Air Conditioning Cor Permit status: Permit issued | Permit id: 12099407701 | |||||
SCORE 99 Equipment work Date: May 15, 1998 Contractor: Reliable Fire Protection Plumbing Contractor: Reliable Fire Protection, Inc Permit status: Permit issued | Permit id: 10181208601 | |||||
SCORE 92 Equipment work Date: January 6, 2010 Contractor: Chelsea Piers Lp Permit status: Permit issued | Permit id: 12023230001 | |||||
SCORE 92 Equipment work Date: June 29, 2009 Contractor: Chelsea Piers Lp Permit status: Permit issued | Permit id: 11007430203 | |||||
SCORE 100 Equipment work Date: November 1, 1996 Contractor: Aj Contracting Co. Inc Permit status: Permit issued | Permit id: 10071683301 | |||||
SCORE 87 Equipment work Date: August 15, 1995 Contractor: A.J. Contracting Inc Permit status: Permit issued | Permit id: 10104519201 | |||||
SCORE 99 Equipment work Date: June 10, 1997 Contractor: Reliable Fire Protection Plumbing Contractor: Reliable Fire Protection, Inc Permit status: Permit issued | Permit id: 10153248701 | |||||
SCORE 99 Equipment work Date: August 16, 2012 Contractor: Capitol Fire Spkl Co Inc Permit status: Permit issued | Permit id: 12022505003 | |||||
SCORE 100 Plumbing Date: May 15, 1997 Contractor: Lab Plumbing And Heating Co. Inc Permit status: Permit issued | Permit id: 10150478401 | |||||
SCORE 56 Equipment work Date: July 6, 1999 Contractor: Miel Square Construction Inc Permit status: Permit issued | Permit id: 10225501501 | |||||
SCORE 87 Sign Date: December 16, 2005 Contractor: Ls Sign Co. Inc Permit status: Permit issued | Permit id: 10426415401 | |||||
SCORE 100 Sign Date: December 15, 2005 Contractor: L.S. Sign Co. Inc Permit status: Permit issued | Permit id: 10425414701 | |||||
SCORE 99 Equipment work Date: December 22, 2009 Contractor: Capitol Fire Spkl Co Inc Permit status: Permit issued | Permit id: 12022505001 | |||||
SCORE 99 Equipment work Date: February 4, 2011 Contractor: Capitol Fire Spkl Co Inc Permit status: Permit issued | Permit id: 12022505002 | |||||
SCORE 98 Date: January 28, 2008 Contractor: Michael Braito Permit status: Initial | Permit id: 110074302 | |||||
SCORE 98 Date: February 21, 2007 Contractor: Michael Braito Permit status: Initial | Permit id: 104680962 | |||||
SCORE 99 Date: June 11, 2004 Contractor: Kevin Kossi Client: Michael Braito | Client Address: Chelsea Pier 62 Ste 3 Ny Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Managem | Permit status: Initial | Permit id: 103794663 | |||||
SCORE 99 Date: November 23, 2011 Contractor: Raymond Otazu Client: Eric Mitchell | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (201) 571-0700 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 120754111 | |||||
SCORE 74 Date: March 28, 2007 Contractor: Reynold Alezander Client: Sal Santangelo | Client Address: 111a 11th Ave Pier 62 New York Ny 10011 | Client Phone: (212) 336-6037 | Client Company: The Light House C/o Pier Llc | Permit status: Initial | Permit id: 104692904 | |||||
SCORE 100 Date: January 30, 2007 Contractor: Dario Diaz Permit status: Renewal | Permit id: 104546458 | |||||
SCORE 97 Date: January 30, 2007 Contractor: Theodore Wagner Permit status: Initial | Permit id: 104546458 | |||||
SCORE 100 Date: December 23, 2009 Contractor: Richard Levine Client: Michael Braito | Client Address: Pier 62 Ny Ny 10011 | Client Phone: (212) 691-5959 | Client Company: Chelsea Piers Management Inc | Permit status: Renewal | Permit id: 120225050 | |||||
SCORE 59 Date: August 1, 2006 Contractor: James Mulvey Client: Michael Braito | Client Address: Chelsea Piers Ny Ny 10011 | Client Phone: (212) 336-6837 | Client Company: Pier 62 | Permit status: Initial | Permit id: 104452502 | |||||
Date: June 6, 2002 Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103181511 | |||||
SCORE 100 Date: May 1, 2007 Contractor: John Goode Client: Michael Braito | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 104548928 | |||||
SCORE 98 Date: February 22, 2005 Contractor: Michael Braito Client: David Tewksbury | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Renewal | Permit id: 104044491 | |||||
SCORE 98 Date: December 9, 2005 Contractor: Michael Braito Client: Michael Braito | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 104308214 | |||||
SCORE 77 Date: September 26, 2006 Contractor: Rodney Ragen Permit status: Renewal | Permit id: 104546458 | |||||
SCORE 100 Date: February 6, 2007 Contractor: James Meyer Client: Michael Braito | Client Address: Pier 62 Chelsea Piers Ny Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 104667013 | |||||
SCORE 100 Date: June 7, 2002 Contractor: Pat Fitzpatrick Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103180950 | |||||
SCORE 98 Date: January 28, 2008 Contractor: Michael Braito Client: Michael Braito | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Renewal | Permit id: 110074302 | |||||
SCORE 98 Date: April 28, 2010 Contractor: Stephen Touhey Permit status: Initial | Permit id: 120277299 | |||||
SCORE 98 Date: February 13, 2007 Contractor: Michael Braito Client: Michael Braito | Client Address: Pier 62 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 104622990 | |||||
SCORE 98 Date: May 7, 2002 Contractor: Michael Braito Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103154033 | |||||
SCORE 99 Date: June 18, 2004 Contractor: Richard Lyne Client: Michael Braito | Client Address: Chelsea Pier 62 Ste 3 Ny Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Managem | Permit status: Initial | Permit id: 103794663 | |||||
SCORE 100 Date: January 10, 2002 Contractor: Reynold Alexander Client: Sal Santangelo | Client Address: Pier 61 West 23rd Street New York Ny 10011 | Client Phone: (212) 538-6062 | Client Company: The Lighthouse | Permit status: Initial | Permit id: 103050252 | |||||
SCORE 72 Date: June 20, 2003 Contractor: William Wadding Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103457670 | |||||
SCORE 59 Date: August 7, 2003 Contractor: Mihcela Braito Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103534579 | |||||
SCORE 100 Date: May 20, 2009 Contractor: Douglas Coger Client: David Tewksbury | Client Address: 3 Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6837 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 120034275 | |||||
SCORE 100 Date: June 21, 2002 Contractor: Douglas Coger Client: Adam Hirsh | Client Address: Pier 59 North River Manhattan Ny 10011 | Client Phone: (212) 835-2695 | Client Company: Amf Chelsea Piers Lanes | Permit status: Initial | Permit id: 103181272 | |||||
SCORE 78 Equipment work Date: February 13, 2007 Contractor: Chelsea Piers, Lp Permit status: Permit issued | Permit id: 10462299001 | |||||
SCORE 99 Sign Date: December 15, 2005 Contractor: L.S. Sign Co., Inc Permit status: Permit issued | Permit id: 10425414701 | |||||
SCORE 65 Sign Date: December 16, 2005 Contractor: Ls Sign Co., Inc Permit status: Permit issued | Permit id: 10426415401 | |||||
SCORE 56 Sign Date: June 3, 2005 Contractor: L S Sign Co., Inc Permit status: Permit issued | Permit id: 10410921501 | |||||
SCORE 56 Equipment work Date: July 6, 1999 Contractor: Miel Square Construction, Inc Permit status: Permit issued | Permit id: 10225501501 | |||||
SCORE 95 Equipment work Date: July 22, 1997 Contractor: Absolute Fire Protection Permit status: Permit issued | Permit id: 10148509101 | |||||
SCORE 99 Plumbing Date: May 15, 1997 Contractor: Lab Plumbing And Heating Co.,Inc Permit status: Permit issued | Permit id: 10150478401 | |||||
SCORE 100 Equipment work Date: August 16, 2012 Contractor: Capitol Fire Spkl Co,Inc Permit status: Permit issued | Permit id: 12022505003 | |||||
SCORE 65 Equipment work Date: August 15, 1995 Contractor: A.J. Contracting, Inc Permit status: Permit issued | Permit id: 10104519201 | |||||
SCORE 100 Equipment work Date: November 1, 1996 Contractor: Aj Contracting Co.,Inc Permit status: Permit issued | Permit id: 10071683301 | |||||
SCORE 78 Equipment work Date: June 29, 2009 Contractor: Chelsea Piers, Lp Permit status: Permit issued | Permit id: 11007430203 | |||||
SCORE 78 Equipment work Date: January 6, 2010 Contractor: Chelsea Piers, Lp Permit status: Permit issued | Permit id: 12023230001 | |||||
SCORE 99 Date: June 6, 2002 Contractor: Enda Mccormack Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103181511 | |||||
SCORE 96 Date: July 1, 2002 Contractor: Anthony Brannan Client: Pat Greene | Client Address: 111 A 11 Avenue New York Ny 10011 | Client Phone: (212) 336-6440 | Client Company: Chelsea Brewing Company | Permit status: Initial | Permit id: 103184199 | |||||
SCORE 100 Equipment work Date: December 22, 2009 Contractor: Capitol Fire Spkl Co,Inc Permit status: Permit issued | Permit id: 12022505001 | |||||
SCORE 100 Equipment work Date: February 4, 2011 Contractor: Capitol Fire Spkl Co,Inc Permit status: Permit issued | Permit id: 12022505002 | |||||
SCORE 100 Date: September 12, 2002 Contractor: Paul Quinn Client: Michael Braito | Client Address: Pier 62, Chelsea Piers New York Ny 10011 | Client Phone: (212) 336-6800 | Client Company: Chelsea Piers Management | Permit status: Initial | Permit id: 103181511 | |||||
SCORE 99 Plumbing Date: May 15, 1997 Contractor: Lab Plumbing And Heating Co.,Inc Permit status: Permit issued | Permit id: 10150478401 |