Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Zoning/use permit Date: November 2, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 309523 | |||||
Mechanical permit Date: January 18, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 321089 | |||||
Plumbing permit Date: January 19, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 321495 | |||||
New construction permit Date: November 19, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 310938 | |||||
Zoning permit Date: October 26, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 288296 | |||||
Electrical permit Date: February 10, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 324402 | |||||
Suppression permit Date: March 14, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 316852 | |||||
Permit for the relocation of lot lines to create two lots from one lot, for the demolition of existing one story frame building and one each lot the erection of one three story attached structure, with cellar, not to exceed 35 high, with a roof top deck with a 36" high protective railing (roof top surface to be used as deck floor surface to be accessed from interior stair at 3rd story ot to extend above the roof surface), size & location as shown in the application. Date: July 14, 2010 Client: Bekas Katherine Angela | Applicant: Hercules Grigos, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 5, 2010 | Permit id: 12222 | |||||
Suppression permit Date: March 14, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 316852 | |||||
Electrical permit Date: February 10, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 324402 | |||||
Zoning permit Date: October 26, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 288296 | |||||
Plumbing permit Date: February 28, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 326587 | |||||
Mechanical permit Date: January 18, 2011 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 321089 | |||||
New construction permit Date: November 19, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 310938 | |||||
Zoning use permit Date: November 2, 2010 Client: Bekas Katherine Angela | Permit status: Completed | Permit id: 309523 | |||||
Permit for the relocation of lot lines to create two lots from one lot, for the demolition of existing one story frame building and one each lot the erection of one three story attached structure, with cellar, not to exceed 35 high, with a roof top deck with a 36" high protective railing (roof top surface to be used as deck floor surface to be accessed from interior stair at 3rd story ot to extend above the roof surface), size & location as shown in the application. Date: July 14, 2010 Client: Bekas Katherine Angela | Applicant: Hercules Grigos, Esquire | Permit type: Appeal | Permit status: Granted/prov | Completion date: October 5, 2010 | Permit id: 12222 | |||||
Relocatioin of lot lines to create 2 lots from 1. Erection of a sfd. Full cellar. Attached with rooftop deck (roof top used as deck floor) no parking Date: October 26, 2010 Client: Bekas Katherine Angela | Permit type: Zoning permit | Permit status: Completed | Completion date: October 26, 2010 | Permit id: 288296 | |||||
Erection of a sfd. Full cellar. Attached with rooftop deck (roof top used as deck floor) no parking Date: November 2, 2010 Client: Bekas Katherine Angela | Permit type: Zoning/use permit | Permit status: Completed | Completion date: November 2, 2010 | Permit id: 309523 | |||||
SCORE 100 New construction of a 3 story wood framed sfd with rooftop deck on roof surface and full cellar. Date: November 19, 2010 Contractor: U S Construction Inc Client: Bekas Katherine Angela | Permit type: New construction permit | Permit status: Completed | Completion date: August 19, 2011 | Permit id: 310938 | |||||
SCORE 100 Install new fire sprinkler system within single family dwelling. Date: March 14, 2011 Contractor: Fire Protection Services Inc Client: Bekas Katherine Angela | Permit type: Suppression permit | Permit status: Completed | Completion date: August 19, 2011 | Permit id: 316852 | |||||
SCORE 100 Install 1 hvac unit(sfd) Date: January 18, 2011 Contractor: Talgar Inc Client: Bekas Katherine Angela | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 22, 2011 | Permit id: 321089 | |||||
SCORE 100 To install 1 house drain waste line for 2 toilets, 2 lav sinks, 2 bathtubs, 1 laundry box, 1 kitchen sink, 1 shower, water supply and branch lines for all listed fixtures, set all listed fixtures Date: January 19, 2011 Contractor: Garry Dabney Client: Bekas Katherine Angela | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 22, 2011 | Permit id: 321495 | |||||
SCORE 100 Install 200a service install 25 circuit total, 45 outlets, switches,15 lights,(8) 120v smoke detectors,(2) phone cable jacks, all as per 2008 nec Date: February 10, 2011 Contractor: Sean Kearns Client: Bekas Katherine Angela | Permit type: Electrical permit | Permit status: Completed | Completion date: September 7, 2011 | Permit id: 324402 | |||||
SCORE 96 Install 5" trap, 5" lateral, 3 4" water service Date: February 28, 2011 Contractor: Lepore Plumbing And Excavating Client: Bekas Katherine Angela | Permit type: Plumbing permit | Permit status: Completed | Completion date: March 29, 2011 | Permit id: 326587 |