Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 79 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 29, 2016 Contractor: Ecosolargy Inc Permit type: Residential alteration-addn | Permit status: Completed | Completion date: August 17, 2016 | Permit id: Pds2016-Resalt- | |||||
SCORE 72 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 20, 2017 Contractor: Comfort Air Zone Permit type: Addn | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
Final Date: August 15, 2016 Permit status: Pass | Permit id: Pds2016-Resalt- | |||||
SCORE 72 Hvac change out - split system - this project must comply with the current building energy efficiency standards. Registered title 24 forms must be provided to the inspector in the field. Date: September 20, 2017 Contractor: Comfort Air Zone Permit type: Hvac change out | Permit status: Issued | Permit id: Pds2017-Resalt- | |||||
SCORE 79 Roof mount residential solar pv for existing sfd with existing residential main electrical service upgrade - 125a - the scope of work is limited to upgrade of the existing main service panel. No new sub-panels or relocation permitted. Per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: May 25, 2016 Contractor: Ecosolargy Inc Permit type: Electrical - existing main svc upgrade (max 400a) | Permit status: Completed | Permit id: Pds2016-Resalt- |