Utility test pits (denoted by red circles in plan) in alley west of 11 15th st nw, west of 15th st nw and north of l st nw. Date: May 22, 2015 Client: Mid-Atlantic Utility Locating, Llc | Permit type: Excavation; boring t | Permit id: Pa110565 | |||||
Application is for the removal of the existing street trees fronting the project site along 15th street and l street, nw. Per on-site meeting with simoun buana on 10/22/2015, application is being resubmitted for approval with the tree diameters provided by simoun. Date: December 2, 2015 Client: James Berkon | Permit type: Landscaping; tree re | Permit id: Pa116328-R1 | |||||
SCORE 99 Abandon in 15th st nw: 1 large water service. Abandon in rear alley: 1 sanitary service lateral. Permit type: Excavation; sewer se | |||||
SCORE 62 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Date: October 25, 2012 Contractor: Wsp Environment And Energy Llc Wsp Client: Cris Flack | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: April 27, 2013 | Permit id: Pa76497 | |||||
SCORE 62 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Date: April 29, 2013 Contractor: Wsp Environment And Energy Llc Wsp Client: Cris Flack | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: May 1, 2013 | |||||
SCORE 100 Place 81 of (2) 1-1/2" hdpe e/w (1) 48 fiber and tracer wire Date: January 17, 2014 Contractor: Level Communications Llc Jody Williams Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: May 1, 2014 | Permit id: Pa90816 | |||||
Abandon in 15th st nw: 2 large water services, 1 sewer lateral, 1 storm connection. Abandon in l st nw: 1 large water service. Date: November 9, 2015 Permit type: Excavation; sewer service lateral abandonment, excavation; storm service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: January 29, 2016 | Permit id: Pa118958 | |||||
Abandon in 15th st nw: 1 large water service. Abandon in rear alley: 1 sanitary service lateral. Date: December 4, 2015 Permit type: Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: March 13, 2016 | Permit id: Pa120076 | |||||
SCORE 98 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25 wide, down to 15. Wide. - widening of the existing l street alley entrance width to wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaults located along l s Date: November 19, 2015 Contractor: Clark Construction Group Llc Client: James Berkon | Permit type: Paving; ada curb ramp, paving; alley | Permit status: Cancel/withdrawn | Expiration date: February 28, 2017 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Date: March 4, 2016 Contractor: Fort Myer Construction Corporation Client: Carr Properties Llc | Permit type: Excavation; electric connection | Permit status: Permit expired | Expiration date: July 16, 2016 | Permit id: Pa124184 | |||||
SCORE 86 Abandonment and backfilling of 15th street vault (the location of which is indicated on the attached plan) in accordance with regularly scheduled excavation activities associated with the redevelopment of 11 15th street, nw. Date: April 12, 2016 Contractor: 11 15th Street Llc 11 15th Street Llc Permit type: Excavation; vault abandonment | Permit status: Cancel/withdrawn | Expiration date: September 30, 2016 | |||||
SCORE 86 Re-use of existing vault for underground parking associated with the re-development of 11 15th street, nw. During construction, the existing vault will be converted from a three (3) level vault to a two (2) level vault. Date: April 12, 2016 Contractor: 11 15th Street Llc 11 15th Street Llc Permit type: Excavation; underground garage projection (total levels) | Permit status: Denied | Expiration date: December 31, 2016 | |||||
To drill and construct 6 - six inch diameter dewatering wells in 12 inch boreholes to 78 feet deep and two 2 - 2 inch observation wells in 8 inch boreholes to 59 feet deep by mud rotary drilling methods. All drill spoils and fluids will be contained, tested and disposed of per doee regulations. Date: April 28, 2016 Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: June 9, 2017 | |||||
SCORE 100 Repair water main line in sidewalk 6x6. Date: June 3, 2016 Contractor: Dcwater Ops Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: July 30, 2016 | Permit id: Pa168520 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Date: June 16, 2016 Contractor: Fort Myer Construction Corporation Client: Carr Properties Llc | Permit type: Excavation; electric connection | Permit status: Issued | Expiration date: September 14, 2016 | Permit id: Pa124184-R1 | |||||
SCORE 69 On the west side of 15th street, nw north of l street remove two metal 28 ft pendant poles sl id #26602 and #26603, for the construction of a new building, will install two 4 watt hps tempoorary lights on top of jersey wall about 3 ft higher then the pedestrian over head protection structure. Power for the tempoary lights will be fed out of the pedestrian walkway structure. Clark construction will make sure power is provided the entire time the tempoary lights are in place, contact person with clark construction is john mader, cell #(571) 329-5261 email: john. Mader@clarkconstruction. Com Date: August 2, 2016 Client: Sarah Huber | Permit type: Over head work; pole installation | Permit status: Assigned | Expiration date: July 1, 2017 | |||||
SCORE 91 Utility test pits (denoted by red circles in plan) in alley west of 11 15th st nw, west of 15th st nw and north of l st nw. Date: May 22, 2015 Contractor: Midatlantic Utility Locating Llc Permit type: Excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: August 8, 2015 | Permit id: Pa110565 | |||||
SCORE 98 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25 wide, down to 15. Wide. - widening of the existing l street alley entrance width to wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaults located along l s Date: November 19, 2015 Contractor: Clark Construction Group Llc Client: James Berkon | Permit type: Paving; ada curb ramp, paving; alley | Permit status: Assigned | Expiration date: February 28, 2017 | |||||
SCORE 69 On the west side of 15th street, nw north of l street remove two metal 28 ft pendant poles sl id #26602 and #26603, for the construction of a new building, will install two 4 watt hps tempoorary lights on top of jersey wall about 3 ft higher then the pedestrian over head protection structure. Power for the tempoary lights will be fed out of the pedestrian walkway structure. Clark construction will make sure power is provided the entire time the tempoary lights are in place, contact person with clark construction is john mader, cell #(571) 329-5261 email: john. Mader@clarkconstruction. Com Date: August 2, 2016 Client: Sarah Huber | Permit type: Over head work; streetlight damage deposit (office use only), excavation; electric ml conduit (trench) | Permit status: Permit expired | Expiration date: October 21, 2016 | Permit id: Pa181603 | |||||
SCORE 100 Installation of a complete streetlighting system. Cast iron #16 poles, 1 28 pp pole and 3 alley poles. Powered by 3 new manhole installations. To be owned by ddot after final acceptance. Date: November 16, 2016 Contractor: Fort Myer Construction Corp Permit type: Excavation; electric ml conduit | Permit status: Assigned | Expiration date: March 31, 2017 | |||||
SCORE 67 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Date: April 29, 2013 Contractor: Wsp Environment And Energy, Llc Wsp Client: Cris Flack | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: May 1, 2013 | |||||
SCORE 98 To drill and construct 6 - six inch diameter dewatering wells in 12 inch boreholes to 78 feet deep and two 2 - 2 inch observation wells in 8 inch boreholes to 59 feet deep by mud rotary drilling methods. All drill spoils and fluids will be contained, tested and disposed of per doee regulations. Date: April 28, 2016 Contractor: George King Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Cancel/withdrawn | Expiration date: June 9, 2017 | |||||
SCORE 95 Insert 75' of 4" pla-20# along l st nw, address of 11 15th st nw cut on l st nw, p 723564 w 3054774 Date: December 20, 2016 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench) | Permit status: Assigned | Expiration date: February 28, 2017 | |||||
SCORE 96 Make necessary excavation to install 74 feet of mainline conduit and miscellaneous equipment in front of 11 15th st nw, as indicated on attached prints. Tcp site specific. Wr #3524012; cut #30510; ward 2; walter altemburger waltemburger@pepco. Com 202-388-2576 (jshorts raclan) Date: December 28, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench) | Permit status: Assigned | Expiration date: April 3, 2017 | |||||
SCORE 100 Installation of a complete streetlighting system. Cast iron #16 poles, 1 28' pp pole and 3 alley poles. Powered by 3 new manhole installations. To be owned by ddot after final acceptance. Date: November 16, 2016 Contractor: Fort Myer Construction Corp Permit type: Excavation; electric ml conduit | Permit status: Assigned | Expiration date: March 31, 2017 | |||||
SCORE 95 Insert 75' of 4" pla-20# along l st nw, address of 11 15th st nw cut on l st nw, p 723564 w 3054774 Date: December 20, 2016 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench), excavation; gas service abandonment | Permit status: Revise and resubmit | Expiration date: February 28, 2017 | |||||
SCORE 99 Install in 15th st nw: approx 77 lf of 8 in water main; 8 in fire service; 6 in domestic service with meter vault; fire hydrant with lateral. 6 in sanitary lateral, 8 in sanitary lateral w 2 manholes. Install in l st nw: 8 in sanitary lateral w 1 manhole; 18 in storm lateral w 2 manholes. 8 in water main replacement in 6 ft sections - approx 3 locations. Date: January 16, 2017 Contractor: Kalos Construction Permit type: Excavation; fire hydrant | Permit status: Assigned | Expiration date: April 5, 2017 | |||||
SCORE 56 Wedding Date: August 5, 2012 Contractor: David Mcmillian Permit status: Expired | Expiration date: August 18, 2012 | Permit id: Pa10067102 | |||||
SCORE 93 Other reserved parking Contractor: Marcparc Inc Permit status: Notpaid | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 69 Other reserved parking Date: November 1, 2013 Contractor: Julie Perlstein Permit status: Expired | Expiration date: November 5, 2013 | Permit id: Pa10118570 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Rejected | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 69 Other reserved parking Contractor: Julie Perlstein Permit status: Rejected | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: January 17, 2013 Contractor: Dcwater Permit status: Expired | Expiration date: March 20, 2013 | Permit id: Pa10083460 | |||||
SCORE 55 Other reserved parking Contractor: Tatiana Medina Permit status: Notpaid | Expiration date: February 20, 2011 | Permit id: 0 | |||||
SCORE 98 Excavation; monitoring well (each addl), excavation; monitoring well (single) Contractor: George King Permit status: 3 | Expiration date: June 9, 2017 | Permit id: 0 | |||||
SCORE 100 Excavation; electric connection (trench), over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one) Date: June 14, 2016 Contractor: Fort Myer Construction Corporation Permit status: 8 | Expiration date: July 16, 2016 | Permit id: Pa124184 | |||||
SCORE 100 Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Fort Myer Construction Corp Permit status: 12 | Expiration date: March 31, 2017 | Permit id: 0 | |||||
SCORE 86 Excavation; vault abandonment Contractor: 11 15th Street Llc 11 15th Street Llc Permit status: 3 | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Excavation; underground garage projection (total levels) Contractor: 11 15th Street Llc 11 15th Street Llc Permit status: 2 | Expiration date: December 31, 2016 | Permit id: 0 | |||||
SCORE 88 Other reserved parking Date: September 16, 2010 Contractor: Lyn Stout Permit status: Resubmit | Expiration date: September 27, 2010 | Permit id: 0 | |||||
SCORE 69 Over head work; streetlight damage deposit (office use only), excavation; electric ml conduit (trench) Date: August 23, 2016 Permit status: 8 | Expiration date: October 21, 2016 | Permit id: Pa181603 | |||||
SCORE 95 Excavation; gas main line (trench), excavation; gas service abandonment Contractor: Wash Gas And Light Co Permit status: 3 | Expiration date: February 28, 2017 | Permit id: 0 | |||||
SCORE 100 Excavation; electric connection (trench), over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one) Date: March 2, 2017 Contractor: Fort Myer Construction Corporation Permit status: 8 | Expiration date: May 30, 2017 | Permit id: Pa124184-R5 | |||||
SCORE 67 Excavation; monitoring well (each addl), excavation; monitoring well (single) Contractor: Wsp Environment And Energy, Llc Wsp Permit status: 3 | Expiration date: May 1, 2013 | Permit id: 0 | |||||
SCORE 95 Insert 75 of 4" pla-20# along l st nw, 11 15th st nw, p 723564 w 3054774 Date: June 6, 2017 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench) | Permit status: Issued | Expiration date: July 10, 2017 | Permit id: Pa200814-R1 | |||||
SCORE 96 Make necessary excavation to install 44 feet of mainline conduit, feet of service conduit and miscellaneous equipment in front of 11 15th st nw, as indicated on attached prints. Tcp site specific. Wr #3524012; cut #30510; ward 2; walter altemburger waltemburger@pepco. Com 202-388-2576 (jshorts raclan) Date: March 9, 2017 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: June 7, 2017 | Permit id: Pa198489-R1 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Date: March 1, 2017 Contractor: Fort Myer Construction Corporation Client: Carr Properties Llc | Permit type: Excavation; electric connection | Permit status: Permit expired | Expiration date: May 30, 2017 | Permit id: Pa124184-R5 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Withdrawn | Expiration date: May 5, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: September 22, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Resubmit | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 23, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Date: October 13, 2016 Contractor: Clark Concrete Contractors, Llc Permit status: Expired | Expiration date: October 23, 2016 | Permit id: Pa10349975 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: March 6, 2017 Contractor: Potomac Electric Power Company Permit status: Expired | Expiration date: April 18, 2017 | Permit id: Pa10379118 | |||||
SCORE 95 Steel plate- single location Date: March 27, 2017 Contractor: Pepco Holdings Inc Permit status: Expired | Expiration date: March 31, 2017 | Permit id: Pa10392672 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 16, 2017 | Permit id: 0 | |||||
SCORE 79 Steel plate- single location Contractor: R.B. Hinkle Construction Inc Permit status: Withdrawn | Expiration date: June 30, 2017 | Permit id: 0 | |||||
SCORE 86 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Date: December 11, 2012 Contractor: Jason Griggs Permit status: Permit expired | Expiration date: April 27, 2013 | Permit id: Pa76497 | |||||
SCORE 86 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Contractor: Jason Griggs Permit status: Cancel/withdrawn | Expiration date: May 1, 2013 | Permit id: 0 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Date: March 2, 2017 Contractor: Fort Myer Construction Corp Permit status: Permit expired | Expiration date: May 30, 2017 | Permit id: Pa124184-R5 | |||||
SCORE 99 Install in 15th st nw: approx 77 lf of 8 in water main; 8 in fire service; 6 in domestic service with meter vault; fire hydrant with lateral. 6 in sanitary lateral, 8 in sanitary lateral w 2 manholes. Install in l st nw: 8 in sanitary lateral w 1 manhole; 18 in storm lateral w 2 manholes. 8 in water main replacement in 6 ft sections - approx 3 locations. Date: March 30, 2017 Contractor: Kalos Construction Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: June 5, 2017 | Permit id: Pa199364-R1 | |||||
SCORE 63 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25' wide, down to 15. 90' wide. - widening of the existing l street alley entrance width to 20' wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaul Date: June 15, 2017 Contractor: James Berkon Permit status: Issued | Expiration date: August 5, 2017 | Permit id: Pa119498 | |||||
SCORE 100 Installation of a complete streetlighting system. Cast iron #16 poles, 1 28 pp pole and 3 alley poles. Powered by 3 new manhole installations. To be owned by ddot after final acceptance. Contractor: Fort Myer Construction Corp Permit status: Assigned | Expiration date: March 31, 2017 | Permit id: 0 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Date: December 27, 2016 Contractor: Fort Myer Construction Corp Permit status: Permit expired | Expiration date: March 31, 2017 | Permit id: Pa124184-R4 | |||||
SCORE 100 Construction staging area Date: January 17, 2013 Contractor: Dcwater Ops Permit status: Permit expired | Expiration date: March 20, 2013 | Permit id: Pa10083460 | |||||
SCORE 69 Other reserved parking Contractor: Julie Perlstein Permit status: Rejected | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 69 Other reserved parking Date: May 21, 2013 Contractor: Julie Perlstein Permit status: Permit expired | Expiration date: May 22, 2013 | Permit id: Pa10096981 | |||||
SCORE 93 Other reserved parking Contractor: Marcparc Inc Permit status: Not paid | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Rejected | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: September 22, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Withdrawn | Expiration date: May 5, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Date: October 19, 2016 Contractor: Clark Concrete Contractors, Llc Permit status: Permit expired | Expiration date: October 22, 2016 | Permit id: Pa10351278 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 23, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Resubmit | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Date: April 7, 2017 Contractor: Potomac Electric Power Company Permit status: Permit expired | Expiration date: May 17, 2017 | Permit id: Pa10379118-R1 | |||||
SCORE 79 Steel plate- single location Contractor: R.B. Hinkle Construction Inc Permit status: Withdrawn | Expiration date: June 30, 2017 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 16, 2017 | Permit id: 0 | |||||
SCORE 63 Application is for the removal of the existing street trees fronting the project site along 15th street and l street, nw. Per on-site meeting with simoun buana on 10/22/2015, application is being resubmitted for approval with the tree diameters provided by simoun. Date: December 2, 2015 Contractor: James Berkon Permit type: Landscaping; tree removal | Permit status: Permit expired | Expiration date: March 1, 2016 | Permit id: Pa116328-R1 | |||||
SCORE 98 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25' wide, down to 15. 90' wide. - widening of the existing l street alley entrance width to 20' wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaul Date: November 19, 2015 Contractor: Clark Construction Group Llc Client: James Berkon | Permit type: Paving; ada curb ramp, paving; alley | Permit status: Permit expired | Expiration date: August 5, 2017 | Permit id: Pa119498 | |||||
SCORE 99 Install in 15th st nw: approx 77 lf of 8 in water main; 8 in fire service; 6 in domestic service with meter vault; fire hydrant with lateral. 6 in sanitary lateral, 8 in sanitary lateral w 2 manholes. Install in l st nw: 8 in sanitary lateral w 1 manhole; 18 in storm lateral w 2 manholes. 8 in water main replacement in 6 ft sections - approx 3 locations. Date: May 30, 2017 Contractor: Kalos Construction Permit type: Excavation; fire hydrant | Permit status: Permit expired | Expiration date: August 4, 2017 | Permit id: Pa199364-R2 | |||||
SCORE 71 Place 21 of (1) 4" pvc e w (3) 1-1 4" indt and (1) 48 fiber and tracer wire Date: June 30, 2017 Contractor: Level Communications, Llc Scott Foy Permit type: Excavation; telecom ml conduits (trench) | Permit status: Approved (pending payment | Expiration date: October 13, 2017 | Permit id: 0 | |||||
SCORE 98 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25' wide, down to 15. 90' wide. - widening of the existing l street alley entrance width to 20' wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaul Date: July 6, 2017 Contractor: Clark Construction Group Llc Client: James Berkon | Permit type: Paving; ada curb ramp, paving; alley | Permit status: Permit expired | Expiration date: October 4, 2017 | Permit id: Pa119498-R1 | |||||
SCORE 95 Excavate in roadway of 15th street to build approx 47 of new verizon conduit from mh4276 to property line of 11 15th street nw and approx 25 of verizon conduit from mh3906 to property line to provide new service bounded by l street nw. Date: July 10, 2017 Contractor: Verizon Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: September 6, 2017 | Permit id: Pa202953-R1 | |||||
SCORE 95 Insert 75 of 4" pla-20# along l st nw, 11 15th st nw, p 723564 w 3054774 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench) | Permit status: Issued | Expiration date: November 7, 2017 | Permit id: Pa200814-R3 | |||||
SCORE 100 At the northwest corner of 15th and l street, nw, we are to remove and place the two traffic signal poles onto a temporary state. Once the corner has been reconstructed by others, we are to reinstall a new pole foundations, traffic signal poles at a new location for ada compliance. A total of 65 lf of conduit trench is to be installed Contractor: Fort Myer Construction Corporation Client: Carr Properties Llc | Permit type: Excavation; electric connection | Permit status: Issued | Expiration date: November 26, 2017 | Permit id: Pa124184-R8 | |||||
SCORE 99 Install in 15th st nw: approx 77 lf of 8 in water main; 8 in fire service; 6 in domestic service with meter vault; fire hydrant with lateral. 6 in sanitary lateral, 8 in sanitary lateral w 2 manholes. Install in l st nw: 8 in sanitary lateral w 1 manhole; 18 in storm lateral w 2 manholes. 8 in water main replacement in 6 ft sections - approx 3 locations. Contractor: Kalos Construction Permit type: Excavation; fire hydrant | Permit status: Issued | Expiration date: December 2, 2017 | Permit id: Pa199364-R4 | |||||
SCORE 67 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Date: October 25, 2012 Contractor: Wsp Environment And Energy, Llc Wsp Client: Cris Flack | Permit type: Excavation; monitoring well (each addl), excavation; monitoring well (single) | Permit status: Permit expired | Expiration date: April 27, 2013 | Permit id: Pa76497 | |||||
SCORE 100 Repair water main line in roadway (6x16). Date: January 8, 2013 Contractor: Dcwater Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 9, 2013 | Permit id: Pa78381 | |||||
SCORE 67 Excavation; monitoring well (each addl), excavation; monitoring well (single) Contractor: Wsp Environment And Energy, Llc Wsp Permit status: 3 | Expiration date: May 1, 2013 | Permit id: 0 | |||||
SCORE 79 Permission to install 2 bike racks in the public space in front of the l street facade of 11 15th street nw. Date: April 20, 2010 Contractor: Matt Pearson Permit type: Fixture; bike rack(s) | Permit status: Permit expired | Expiration date: August 2, 2010 | Permit id: Pa55039 | |||||
SCORE 56 Excavation; sheeting & shoring (for buildings), over head work; streetlight damage deposit (office use only) Date: September 16, 2015 Contractor: 11 15 Street Llc 11 15 Street Llc Permit type: Excavation; sheeting & shoring (for buildings), over head work; streetlight damage deposit (office use only) | Permit status: Permit expired | Expiration date: February 15, 2017 | Permit id: Pa116110 | |||||
SCORE 98 The proposed streetscape work fronting the new building, located at the nw corner of the intersection of l street and 15th street nw, will include the following items: - new ddot standard sidewalks, curb, and gutter, along l street and 15th street nw fronting the project - 14 new street trees and tree pits, which will adhere to the ddot lid soil volume requirements - slight relocation of the existing bikeshare station to move it away from the property line to the curb line along l street nw - 2 new ada curb ramps at the nw corner of the l street nw and 15th street nw intersection - new alley paving for the existing north-south public alley off of l street nw - shrinking of the existing curb cut on 15th street nw, which is currently 25' wide, down to 15. 90' wide. - widening of the existing l street alley entrance width to 20' wide - all loading and parking activities will occur off of the north-south public alley (or on other areas of private space) - all existing pepco vaul Date: June 15, 2017 Contractor: Clark Construction Group Llc Client: James Berkon | Permit type: Paving; ada curb ramp, paving; alley | Permit status: Issued | Expiration date: August 5, 2017 | Permit id: Pa119498 | |||||
SCORE 99 Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) Date: December 4, 2015 Contractor: Kalos Construction Permit type: Excavation; sewer service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: March 13, 2016 | Permit id: Pa120076 | |||||
SCORE 86 Abandonment and back filling of existing l street (17 x 44) vault and existing 15th street (9 x 146) vault (the location of which is indicated on the attached plan) in accordance with regularly scheduled excavation activities associated with the redevelopment of 11 15th street, nw. Re-use existing vault for underground parking associated with the re-development of 11 15th street, nw. During construction the existing vault will be converted from a three (3) level vault to a two (2) level vault. Date: April 12, 2016 Contractor: 11 15th Street Llc 11 15th Street Llc Client: Carr Properties Carr Properties | Permit type: Excavation; vault abandonment, excavation; vault(s) lxw | Permit status: Issued | Expiration date: January 13, 2017 | Permit id: Pa126140 | |||||
SCORE 86 Excavation; vault abandonment Contractor: 11 15th Street Llc 11 15th Street Llc Permit status: 3 | Expiration date: September 30, 2016 | Permit id: 0 | |||||
SCORE 86 Excavation; underground garage projection (total levels) Contractor: 11 15th Street Llc 11 15th Street Llc Permit status: 2 | Expiration date: December 31, 2016 | Permit id: 0 | |||||
SCORE 96 Wr#3509856 cut#40242-closing alley to repair feeder outage-13 north of the north curb of 16th street nw and 1 west of the east curb of l street nw (quick) Date: April 20, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; repair electric service (exavation) | Permit status: Permit expired | Expiration date: June 18, 2016 | Permit id: Pa136616 | |||||
SCORE 98 Excavation; monitoring well (each addl), excavation; monitoring well (single) Contractor: George King Permit status: 3 | Expiration date: June 9, 2017 | Permit id: 0 | |||||
SCORE 100 Repair water main line in sidewalk 6x6. Date: June 3, 2016 Contractor: Dcwater Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: July 30, 2016 | Permit id: Pa168520 | |||||
SCORE 56 Bill brummel has been granted permission to film at various location that fall under the jurisdiction of district government. Final details shall be work out with mpd & tsa. Must notify when possible a min of 5 days advance notification of final plans to residences & businesses of proposed activity. No parking signs are to be posted 72 hours in advance. Not to obstruct or impede access to residence, place of worship, or businesses. The attached list of locations is a part of this permit. Date: November 8, 2006 Contractor: Bill Brummel Permit type: Occupancy; tv & film, occupancy; motion picture as per attached list | Permit status: Permit expired | Expiration date: November 13, 2006 | Permit id: Pa23637 | |||||
SCORE 95 Excavation; gas main line (trench), excavation; gas service abandonment Contractor: Wash Gas And Light Co Permit status: 3 | Expiration date: February 28, 2017 | Permit id: 0 | |||||
SCORE 71 Excavation; telecom ml conduits (trench) Contractor: Level Communications, Llc Scott Foy Permit status: 1 | Expiration date: October 13, 2017 | Permit id: 0 | |||||
SCORE 93 Other reserved parking Contractor: Marcparc Inc Permit status: Notpaid | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 69 Other reserved parking Contractor: Julie Perlstein Permit status: Rejected | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Rejected | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 55 Other reserved parking Contractor: Tatiana Medina Permit status: Notpaid | Expiration date: February 20, 2011 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Withdrawn | Expiration date: May 5, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: September 22, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Permit status: Notpaid | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Resubmit | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 23, 2016 | Permit id: 0 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Notpaid | Expiration date: June 16, 2017 | Permit id: 0 | |||||
SCORE 79 Steel plate- single location Contractor: R.B. Hinkle Construction Inc Permit status: Withdrawn | Expiration date: June 30, 2017 | Permit id: 0 | |||||
SCORE 71 Construction staging area Contractor: Level Communications, Llc Scott Foy Permit status: Notpaid | Expiration date: September 19, 2017 | Permit id: 0 | |||||
SCORE 98 Mobile crane work zone Contractor: Crane Service Permit status: Assigned | Expiration date: November 5, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Washington Gas Permit status: Pending | Expiration date: November 14, 2017 | Permit id: 0 | |||||
SCORE 100 Repair water main line in roadway (6x16). Date: January 8, 2013 Contractor: Dcwater Ops Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: March 9, 2013 | Permit id: Pa78381 | |||||
SCORE 86 Install one groundwaterv monitoring well (mw-13) on the corbnor of l street nw between 15th st nw and 16th st nw. Install one temporary monitoring well (tmw-14) approximately feet east of mw-3 in the private alley north of the washington post builing. Install two soil monitoring points (sg-10-15 and sg-11-15) in the public alley west of the washington post building Contractor: Jason Griggs Permit status: Cancel/withdrawn | Expiration date: May 1, 2013 | Permit id: 0 | |||||
SCORE 100 Place 81 of (2) 1-1 2" hdpe e w (1) 48 fiber and tracer wire Date: January 17, 2014 Contractor: Level Communications, Llc Jody Williams Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: May 1, 2014 | Permit id: Pa90816 | |||||
SCORE 89 Utility test pits (denoted by red circles in plan) in alley west of 11 15th st nw, west of 15th st nw and north of l st nw. Date: May 22, 2015 Contractor: Midatlantic Utility Locating, Llc Permit type: Excavation; boring test pit (each addl) | Permit status: Permit expired | Expiration date: August 8, 2015 | Permit id: Pa110565 | |||||
SCORE 99 Excavation; sewer service lateral abandonment, excavation; storm service lateral abandonment, excavation; water service lateral abandonment (trench) Date: November 9, 2015 Contractor: Kalos Construction Permit type: Excavation; sewer service lateral abandonment, excavation; storm service lateral abandonment, excavation; water service lateral abandonment (trench) | Permit status: Permit expired | Expiration date: January 29, 2016 | Permit id: Pa118958 | |||||
SCORE 63 Application is for the removal of the existing street trees fronting the project site along 15th street and l street, nw. Per on-site meeting with simoun buana on 10/22/2015, application is being resubmitted for approval with the tree diameters provided by simoun. Date: September 21, 2015 Contractor: James Berkon Permit type: Landscaping; tree removal | Permit status: Permit expired | Expiration date: January 1, 2016 | Permit id: Pa116328 | |||||
SCORE 100 Excavation; electric ml conduit (trench), excavation; manhole installation, over head work; pole installation (each addl), over head work; pole installation (single or first one), over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight(s) installation Date: November 16, 2016 Contractor: Fort Myer Construction Corp Permit type: Excavation; electric ml conduit | Permit status: Issued | Expiration date: December 8, 2017 | Permit id: Pa186737 | |||||
SCORE 99 Excavation; fire hydrant(s), excavation; manhole installation, excavation; repair water main line, excavation; sewer lateral connection over 4" pipe (trench), excavation; storm lateral conn over 4" (trench), excavation; valves (excavation), excavation; water lateral conn over 2" pipe (trench), excavation; water meter manhole (over 2" pipe), excavation; water ml (trench) Date: February 2, 2017 Contractor: Kalos Construction Permit status: Permit expired | Expiration date: April 6, 2017 | Permit id: Pa199364 | |||||
SCORE 96 Make necessary excavation to install 44 feet of mainline conduit, feet of service conduit and miscellaneous equipment in front of 11 15th st nw, as indicated on attached prints. Tcp site specific. Wr #3524012; cut #30510; ward 2; walter altemburger waltemburger@pepco. Com 202-388-2576 (jshorts raclan) Date: December 28, 2016 Contractor: Potomac Electric Power Company Permit type: Excavation; electric ml conduit (trench), excavation; electric connection (trench) | Permit status: Permit expired | Expiration date: April 8, 2017 | Permit id: Pa198489 | |||||
SCORE 95 Insert 75 of 4" pla-20# along l st nw, 11 15th st nw, p 723564 w 3054774 Date: March 6, 2017 Contractor: Wash Gas And Light Co Permit type: Excavation; gas main line (trench) | Permit status: Permit expired | Expiration date: May 11, 2017 | Permit id: Pa200814 | |||||
SCORE 95 Excavate in roadway of 15th street to build approx 47 of new verizon conduit from mh4276 to property line of 11 15th street nw and approx 25 of verizon conduit from mh3906 to property line to provide new service bounded by l street nw. Date: May 11, 2017 Contractor: Verizon Permit type: Excavation; telecom connection (trench) | Permit status: Permit expired | Expiration date: July 8, 2017 | Permit id: Pa202953 | |||||
SCORE 56 A suspended roadway letter was received installing 219 of fiber optic cable in the roadway of 15th street and l street n. W of (1) 4" pvc e w (3) 1-1 4" indt e w (1) 24 osp fiber and tracer wire Date: June 26, 2017 Permit type: Excavation; telecom ml conduits (trench) | Permit status: Permit expired | Expiration date: September 28, 2017 | Permit id: Pa207754 | |||||
SCORE 71 Place 21 of (1) 4" pvc e w (3) 1-1 4" indt and (1) 48 fiber and tracer wire Contractor: Level Communications, Llc Scott Foy Permit status: Approved (pending payment | Expiration date: October 13, 2017 | Permit id: 0 | |||||
SCORE 71 A suspended roadway letter was received installing 102 of maine line fiber optic conduit in the roadway and sidewalk of l street and 15th street n. W placing 68 of (1) 4" pvc e w 1-1 4" indt (1) 48 osp fiber and tracer while, pull 34 (1) 48 osp fiber thru verizon conduit Date: July 12, 2017 Contractor: Level Communications, Llc Scott Foy Permit type: Excavation; telecom ml conduits (trench) | Permit status: Issued | Expiration date: October 26, 2017 | Permit id: Pa208942 | |||||
SCORE 95 Permit 774730, wr 3086999. 4x5 cut for gas service install at 11 15th st nw. Install 4" svc off 12"-20# main locd on l st nw Date: September 5, 2017 Contractor: Wash Gas And Light Co Permit type: Excavation; gas connection (trench) | Permit status: Issued | Expiration date: December 18, 2017 | Permit id: Pa221315 | |||||
SCORE 69 Other reserved parking Contractor: Julie Perlstein Permit status: Rejected | Expiration date: May 22, 2013 | Permit id: 0 | |||||
SCORE 93 Other reserved parking Contractor: Marcparc Inc Permit status: Not paid | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 96 Other reserved parking Contractor: Mj Valet, Llc Permit status: Rejected | Expiration date: August 21, 2013 | Permit id: 0 | |||||
SCORE 100 Construction staging area Date: February 26, 2014 Contractor: Level Communications, Llc Jody Williams Permit status: Permit expired | Expiration date: April 1, 2014 | Permit id: Pa10129958 | |||||
SCORE 99 Construction staging area Date: December 9, 2015 Contractor: Kalos Construction Permit status: Permit expired | Expiration date: January 7, 2016 | Permit id: Pa10220926 | |||||
SCORE 98 Mobile crane work zone Date: April 19, 2016 Contractor: Crane Service Permit status: Permit expired | Expiration date: April 23, 2016 | Permit id: Pa10250074 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Withdrawn | Expiration date: May 5, 2016 | Permit id: 0 | |||||
SCORE 100 Mobile crane work zone Date: August 16, 2016 Contractor: Miller And Long Permit status: Permit expired | Expiration date: August 21, 2016 | Permit id: Pa10330022 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: November 10, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Resubmit | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 23, 2016 | Permit id: 0 | |||||
SCORE 89 Mobile crane work zone Contractor: Clark Concrete Contractors, Llc Permit status: Rejected | Expiration date: October 16, 2016 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Dcwater Ops Permit status: Not paid | Expiration date: September 22, 2016 | Permit id: 0 | |||||
SCORE 98 Mobile crane work zone Date: February 8, 2017 Contractor: Crane Service Permit status: Permit expired | Expiration date: February 18, 2017 | Permit id: Pa10375454 | |||||
SCORE 100 Mobile crane work zone Date: June 12, 2017 Contractor: Miller And Long Permit status: Permit expired | Expiration date: June 17, 2017 | Permit id: Pa10412864 | |||||
SCORE 79 Steel plate- single location Contractor: R.B. Hinkle Construction Inc Permit status: Withdrawn | Expiration date: June 30, 2017 | Permit id: 0 | |||||
SCORE 79 Steel plate- single location Date: June 9, 2017 Contractor: R.B. Hinkle Construction Inc Permit status: Permit expired | Expiration date: July 3, 2017 | Permit id: Pa10425465 | |||||
SCORE 71 Construction staging area Date: September 7, 2017 Contractor: Level Communications, Llc Scott Foy Permit status: Issued | Expiration date: October 12, 2017 | Permit id: Pa10460984 | |||||
SCORE 96 Construction staging area Contractor: Potomac Electric Power Company Permit status: Not paid | Expiration date: June 16, 2017 | Permit id: 0 | |||||
SCORE 61 Steel plate- single location Date: July 21, 2017 Contractor: R.B. Hinkle Inc Permit status: Permit expired | Expiration date: August 14, 2017 | Permit id: Pa10453948 | |||||
SCORE 100 Construction staging area Date: July 31, 2017 Contractor: Washington Gas Permit status: Permit expired | Expiration date: August 29, 2017 | Permit id: Pa10455432 | |||||
SCORE 56 Construction staging area Date: August 14, 2017 Permit status: Permit expired | Expiration date: September 19, 2017 | Permit id: Pa10456295 | |||||
SCORE 71 Construction staging area Contractor: Level Communications, Llc Scott Foy Permit status: Not paid | Expiration date: September 19, 2017 | Permit id: 0 | |||||
SCORE 98 Mobile crane work zone Contractor: Crane Service Permit status: Assigned | Expiration date: November 5, 2017 | Permit id: 0 | |||||
SCORE 100 Construction staging area Contractor: Washington Gas Permit status: Pending assignment | Expiration date: November 14, 2017 | Permit id: 0 |