Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 88 Plumbing and gas Date: January 15, 2013 Contractor: Phillip Anderson Permit status: Permit issued | Permit id: P1302199 | |||||
SCORE 96 Electrical Date: April 10, 2013 Contractor: John H Thomson Permit status: Completed | Permit id: E1304401 | |||||
SCORE 96 Electrical Date: July 2, 2013 Contractor: John H Thomson Client: The Washington Post Company | Permit status: Completed | Permit id: E1306509 | |||||
SCORE 84 Electrical Date: July 25, 2013 Contractor: Donald J. Simmel Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1307112 | |||||
SCORE 98 Electrical Date: May 14, 2013 Contractor: Roger Lewis Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1305288 | |||||
SCORE 96 Plumbing and gas Date: December 15, 2015 Contractor: David F Ross Permit status: Permit issued | Permit id: P1602129 | |||||
After hours work at daytime dba levels during demolition phase- from 01/18/2016-04/18/2016. Date: December 16, 2015 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600211 | |||||
After hours work at daytime dbs levels during demolition phase from 02/10/16-03/25/16. Date: February 10, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600375 | |||||
After hours work at daytime dbs levels during demolition phase from 03/25/16 to 05/08/2016. Date: March 14, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600466 | |||||
SCORE 96 Electrical Date: March 30, 2016 Contractor: Michael F. Dugan Permit status: Permit issued | Permit id: E1605054 | |||||
SCORE 96 Plumbing and gas Date: August 1, 2016 Contractor: Sheldon J. Shapiro Permit status: Permit issued | Permit id: P1608324 | |||||
SCORE 93 Interior renovation to 9th and 11th floor office space. Partitions, mep and life safety. National committee for quality assurance ncqa Date: June 11, 2014 Contractor: Sam Hollen Ramco Of Dc Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406383 | |||||
SCORE 89 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfwxrq7pmcm%2f2vbdqr%2fkz6i Date: June 26, 2013 Contractor: John Giuseppe John Giuseppe Phil Hauhn Client: John Giuseppe | Permit type: Electrical | Permit status: Completed | Permit id: E51115455 | |||||
SCORE 93 Interior renovation to 7th floor office space. Partitions, mep and life safety work. Masland division 9 suite 721 Date: June 17, 2013 Contractor: Sam Hollen Ramco Of Dc Inc Client: The Washington Post Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1307834 | |||||
SCORE 98 Electrical Date: May 14, 2013 Contractor: Roger Lewis Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1305288 | |||||
SCORE 84 Electrical Date: July 25, 2013 Contractor: Donald J. Simmel Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1307112 | |||||
SCORE 96 Electrical Date: July 2, 2013 Contractor: John H Thomson Client: The Washington Post Company | Permit status: Completed | Permit id: E1306509 | |||||
SCORE 88 Plumbing and gas Date: January 15, 2013 Contractor: Phillip Anderson Permit status: Permit issued | Permit id: P1302199 | |||||
SCORE 96 Plumbing and gas Date: August 1, 2016 Contractor: Sheldon J. Shapiro Permit status: Permit issued | Permit id: P1608324 | |||||
After hours work at daytime dbs levels during demolition phase from 02/10/16-03/25/16. Date: February 10, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600375 | |||||
After hours work at daytime dbs levels during demolition phase from 03/25/16 to 05/08/2016. Date: March 14, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600466 | |||||
After hours work at daytime dba levels during demolition phase- from 01 18 2016-04 18 2016. Date: December 16, 2015 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600211 | |||||
After hours work at daytime dbs levels during demolition phase from 02 10 16-03 25 16. Date: February 10, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600375 | |||||
After hours work at daytime dbs levels during demolition phase from 03 25 16 to 05 08 2016. Date: March 14, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600466 | |||||
SCORE 93 Renovations to existing 4th floor office space for results for development as shown on the attached mechanical, electrical, fire, and architectural dwgs. Interior work only. Date: April 2, 2013 Contractor: John Giusepperamco Client: Carr Properties | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1305289 | |||||
SCORE 67 Advance a total of 2 direct-push or hand auger soil borings for environmental assessment of soil and groundwater. Date: January 3, 2014 Contractor: Cardno Atc Client: The Washington Post Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400107 | |||||
SCORE 93 Interior renovation to 7th floor office space. Partitions, mep and life safety work. Masland division 9 suite 721 Date: June 17, 2013 Contractor: Sam Hollen Ramco Of Dc, Inc Client: The Washington Post Company | Permit type: Alteration and repair | Permit status: Completed | Permit id: B1307834 | |||||
SCORE 84 Electrical Date: July 25, 2013 Contractor: Donald J. Simmel Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1307112 | |||||
SCORE 98 Electrical Date: May 14, 2013 Contractor: Roger Lewis Client: The Washington Post Company | Permit status: Permit issued | Permit id: E1305288 | |||||
SCORE 96 Electrical Date: April 10, 2013 Contractor: John H Thomson Permit status: Completed | Permit id: E1304401 | |||||
SCORE 96 Electrical Date: July 2, 2013 Contractor: John H Thomson Client: The Washington Post Company | Permit status: Completed | Permit id: E1306509 | |||||
SCORE 88 Plumbing and gas Date: January 15, 2013 Contractor: Phillip Anderson Permit status: Permit issued | Permit id: P1302199 | |||||
SCORE 93 Interior renovation to 9th and 11th floor office space. Partitions, mep and life safety. National committee for quality assurance ncqa Date: June 11, 2014 Contractor: Sam Hollen Ramco Of Dc, Inc Permit type: Alteration and repair | Permit status: Completed | Permit id: B1406383 | |||||
SCORE 98 Demolition of interior partitions, mechanical and electrical. Not structural work will be remove. Under this permit Date: October 6, 2015 Contractor: Rojas Client: Carr Properties Carr Properties | Permit type: Demolition | Permit status: Permit issued | Permit id: D1600004 | |||||
SCORE 84 12 story concrete office building Date: December 22, 2015 Contractor: Clark Constr Permit type: Raze | Permit status: Permit issued | Permit id: R1500149 | |||||
After hours work at daytime dba levels during demolition phase- from 01 18 2016-04 18 2016. Date: December 16, 2015 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600211 | |||||
SCORE 96 Plumbing and gas Date: December 15, 2015 Contractor: David F Ross Permit status: Permit issued | Permit id: P1602129 | |||||
SCORE 100 To erect a 13 story above grade office building with 3 levels of below grade parking Date: November 4, 2016 Contractor: Carlos Rojas Permit type: New building | Permit status: Permit issued | Permit id: B1602512 | |||||
SCORE 56 Foundations to grade Date: July 26, 2016 Contractor: 11 15th Stree Llc Permit type: Foundation only | Permit status: Permit issued | Permit id: Fd1600012 | |||||
SCORE 56 An after hours permit is respectfully being requested from april 22, 2016 at 8: pm thru 11:59 pm on april 23, 2016. Date: April 21, 2016 Contractor: Crane Service; Christinelong Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600638 | |||||
After hours work at daytime dbs levels during demolition phase from 03 25 16 to 05 08 2016. Date: March 14, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600466 | |||||
SCORE 64 Erect a 13 story above grade office building with 3 levels below grade parking between the hours of 6: am and 9: pm monday thru saturday Date: December 13, 2016 Contractor: Carr Properties; John Pfeiffer Client: Carr Properties | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700252 | |||||
SCORE 56 To work after hours from 12: am dec 23 11:59 pm - december 26 we are not working december 25. Date: December 22, 2016 Contractor: 11 15th Street Llc 11 15th Street Nw Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700286 | |||||
SCORE 56 After hours work november 24 16 from 9:am to 5:pm Date: November 22, 2016 Contractor: Carlos Rojas; Rojas Client: Carlos Rojas | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700202 | |||||
SCORE 86 Afterhours to place mobile crane saturday at 12am until sunday at 11pm to take down tower crane and repair Date: November 3, 2016 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700122 | |||||
SCORE 56 To work after hours from november 2016 from 12: trough 11:59 november 11 Date: November 9, 2016 Contractor: 11 15th Street Llc 11 15 Street Llc Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700143 | |||||
After hours work at daytime dbs levels during demolition phase from 02 10 16-03 25 16. Date: February 10, 2016 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600375 | |||||
SCORE 86 Afterhours to pour concrete with pump truck from 9pm to 7am from 12 10 2016 to 1 10 2017 Date: December 9, 2016 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700242 | |||||
SCORE 56 After-hours request dec 31 11:59 2 january 2017 Date: December 28, 2016 Contractor: 11 15 Street Nw Llc Llc; Rojas Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700302 | |||||
SCORE 86 Afterhours to work on jobsite sundays from 12 4 2016 to 1 4 2017 from 7am to 7pm Date: December 2, 2016 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700225 | |||||
SCORE 56 Excavation sheeting and shoring, underpinning. Date: February 12, 2016 Contractor: 11 15th Stree 11 15th Street Llc Permit type: Sheeting and shoring | Permit status: Permit issued | Permit id: Sh1600006 | |||||
SCORE 96 Electrical Date: March 30, 2016 Contractor: Michael F. Dugan Permit status: Permit issued | Permit id: E1605054 | |||||
SCORE 96 Plumbing and gas Date: August 1, 2016 Contractor: Sheldon J. Shapiro Permit status: Permit issued | Permit id: P1608324 | |||||
SCORE 56 Erect a 13 story above ground office building with 3 levels of below grade parking between the hours of 6: am and 9: pm monday thru saturday. No work january 16 martin luther king jr. Day or january 20, 2017 - inauguration day please note additional restrictions on work may apply 1 16 2017 - 1 21 2017 due to inauguration activities Date: January 18, 2017 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700390 | |||||
SCORE 86 Afterhours to pour concrete on jobsite from 9pm to 7am from 1 13 2017 to 2 13 2017 no work january 16 martin luther king jr. Day or january 20, 2017 - inauguration day please note additional restrictions on work may apply 1 16 2017 - 1 21 2017 due to inauguration activities Date: January 13, 2017 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700382 | |||||
SCORE 99 Place a crane on l street to set pedestrian bridge between buildings. Will be operating from friday night to monday morning Date: May 24, 2017 Contractor: United Crane And Rigging Client: United Crane And Rigging | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700854 | |||||
SCORE 56 Erect 13 story office building with 3 below grade parking levels. Between the hours of 7pm and 7am monday thru saturday and 7am to 7pm sundays. Date: May 22, 2017 Contractor: 11 15th Street Llc Carr Properties; John Pfeifer Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700845 | |||||
SCORE 56 To abandon the dewatering wells under permit sb1600225 being they are not longer required for the project. Date: January 12, 2017 Client: Jim Berkon - 11 15th Street, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700083 | |||||
SCORE 56 To abandon 8 temporary dewatering wells under permit # sb16002 that are not longer required for this project Date: January 12, 2017 Client: John Berkon- 11 15th Street, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700082 | |||||
SCORE 99 Place a crane on l street to set pedestrian bridges to building. Agreed to maintain a lane of traffic in conjunction with the agreement with the hotel. Date: May 11, 2017 Contractor: United Crane And Rigging Client: United Crane And Rigging | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700818 | |||||
SCORE 61 Erect 13 story office building with 3 levels below grade parking between the hours of 7pm and 7am monday thru saturday and 7am to 7pm sundays Date: April 20, 2017 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700750 | |||||
SCORE 61 Erect 13 story office building with 3 levels below grade parking between the hours of 7pm to 7am monday thru saturday and 7am to 7pm sundays Date: March 21, 2017 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700591 | |||||
SCORE 86 Afterhours to pour concrete on jobsite from 3 17 2017 to 4 17 2017 from 9pm to 7am Date: March 16, 2017 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700585 | |||||
SCORE 56 After hours for april 17th to work from 9:00am to 5: pm Date: April 11, 2017 Contractor: 11 15 Street Llc 11 15 Street Llc; Rojas Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700658 | |||||
SCORE 56 After hours for 2 20 17 from 7: am to 5:00pm Date: February 16, 2017 Contractor: 11 15 Street Nw Llc 11 15 Street Nw Llc Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700502 | |||||
SCORE 61 Erect 13 story office building with 3 levels of below grade parking between the hours of 6: am and 9pm monday thru saturday Date: February 16, 2017 Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700491 | |||||
SCORE 56 Construction of new office space for fannie mae at midtown center on the 5th thru 14th floors, with employee cafeteria for 6 located on the 13th and 14th floors, 2 large conference rooms located on the 13th floor, 1 multipurpose room and a board room located on the 14th floor, mail room, broadcast studio, distributed antenna systems and network switches room, storage, ups, tenant electrical rooms located on p1 level, a new 12k gal. Diesel oil tank located on the p2 level, 2 emg. Generators with 2 - 325 gal. Diesel day tanks located on 14th fl. Tenant will also install 6 convenience stairs between the 7th and 14th floors. Additionally tenant will install 1 stair as a component of the horizontal egress as per code sheet i1. 023, 3 spaces spanning 3 stories between floors 7 and 9, 9 and 11, and 11 and 13 with a 2 hr rated glass and water curtain on levels 9, 11, and 13. All as per the electronically submitted third party reviewed and approved mech., plumb., elect., fire protection, structu Date: May 16, 2017 Contractor: 11 15th Street Llc; John Giusepperamco Permit type: Tenant layout | Permit status: Permit issued | Permit id: Tl1700028 | |||||
SCORE 89 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeilfwxrq7pmcm%2f2vbdqr%2fkz6i Date: June 26, 2013 Contractor: John Giuseppe; John Giuseppe; Phil Hauhn Client: John Giuseppe | Permit type: Electrical | Permit status: Completed | Permit id: E51115455 | |||||
SCORE 56 To work 7: am to 7: pm 10/3/16 to work 7: am to 7: pm 10/10/16 Date: October 3, 2016 Contractor: 11 15 Street Llc; Rojas Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1601090 | |||||
SCORE 56 Afterhours to put up tower crane with mobile crane friday 10/21/2016 from 8pm to 10/22/2016 at 259 am Date: October 19, 2016 Contractor: Clark Construction Clark Consrtuction Client: Clark Construction Clark Consrtuction | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700065 | |||||
SCORE 86 Afterhours to pour concrete with pump truck from 10/28/2016 at 11pm to 11/28/2016 at 7am Date: October 27, 2016 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700098 | |||||
SCORE 86 Afterhours to put up tower crane with mobile crane saturday from 10/28/2016 at 10pm to sunday 10/30/2016 at 1159pm Date: October 27, 2016 Contractor: Miller And Long Miller And Long Client: Miller&long Miller&long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700099 | |||||
SCORE 82 Afterhours to put up tower crane with mobile crane 10/22/2016 from 3am to 10/23/2016 at 1159pm Date: October 14, 2016 Contractor: Clark Concrete Clark Concrete Client: Clark Concrete Clark Concrete | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1700049 | |||||
SCORE 100 Dc water g8 project sewer relining project 18hr timeframe 5 vehicles 1100-1199 block 15th street nw 1100-1199 16th street nw 1500-1599 block l street nw 04/10/2016 to 04/11/2016 Date: April 7, 2016 Contractor: Dc Water Client: Dc Water | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1600575 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildlmohs9cd27rxiggte%2fqop Date: April 1, 2016 Permit type: Electrical | Permit status: Permit issued | Permit id: E40774401 | |||||
Electrical Date: June 28, 2017 Permit status: Permit issued | Permit id: E1707820 | |||||
Electrical Date: June 28, 2017 Permit status: Permit issued | Permit id: E1707822 | |||||
SCORE 97 Mechanical Date: June 19, 2017 Contractor: David Shapiro Permit status: Permit issued | Permit id: M1702667 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Kenneth B. Beechner Client: The Washington Post Company | Permit status: Completed | Permit id: P1306357 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Kenneth B. Beechner Client: The Washington Post Company | Permit status: Completed | Permit id: P1306357 | |||||
SCORE 96 Plumbing and gas Date: July 15, 2013 Contractor: Kenneth B. Beechner Client: The Washington Post Company | Permit status: Completed | Permit id: P1306357 | |||||
SCORE 84 Plumbing and gas Date: July 9, 2013 Contractor: Mark West Client: The Washington Post Company | Permit status: Permit issued | Permit id: P1306232 | |||||
SCORE 84 Plumbing and gas Date: July 9, 2013 Contractor: Mark West Client: The Washington Post Company | Permit status: Permit issued | Permit id: P1306232 | |||||
SCORE 84 Plumbing and gas Date: July 9, 2013 Contractor: Mark West Client: The Washington Post Company | Permit status: Permit issued | Permit id: P1306232 |