Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 98 Proposed removal and recompaction and retaining wall backfill for a p Permit type: Grading | Permit status: Permit finaled | Current use: Apartment | Permit id: 12030-10000-039 | |||||
SCORE 98 Proposed retaining walls at the side of a proposed 4 story apartment/g Permit type: Nonbldg-new | Permit status: Permit finaled | Current use: Apartment | Permit id: 12020-10000-017 | |||||
SCORE 83 Plumbing Date: November 6, 2012 Contractor: Rick Dreyfus Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-30000-203 | |||||
SCORE 59 Handwreck demolition of (e) single family dwelling with detached garag Permit type: Bldg-demolition | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 12019-30000-019 | |||||
SCORE 98 Proposed 4 story, 25 unit apartment w/ garage. The 1st floor is a ty Permit type: Bldg-new | Permit status: Cofo issued | Current use: Apartment | Permit id: 12010-10000-017 | |||||
SCORE 56 Tear off existing roofing material. Apply torch down roofing system. Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: Apartment | Permit id: 11016-70000-233 | |||||
Fa for apartment 27 units. 1 panel and 38 devices. Date: May 30, 2013 Permit type: Electrical | Permit status: Permit finaled | Current use: Apartment | Permit id: 13041-10000-141 | |||||
SCORE 96 Pv2 multifamily dwelling. Total system size 16. 5 kw. Using 66 modules Date: July 22, 2013 Contractor: Jeff Farrington Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-177 | |||||
SCORE 99 Installation of hydro electric elevator for aparmtment. Date: February 7, 2013 Contractor: Brian Peterson Permit type: Elevator | Permit status: Permit finaled | Current use: Apartment | Permit id: 12046-20000-013 | |||||
SCORE 88 Potable water, waste and vent, low pressure gas system, and sump pump Date: January 9, 2013 Contractor: John Kivlen Permit type: Plumbing | Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-10000-218 | |||||
Plan check for power and energy. New 3 floor 25 unit apartment with a Date: January 18, 2013 Permit type: Electrical | Permit status: Permit finaled | Current use: Apartment | Permit id: 12041-20000-242 | |||||
Hvac Date: November 25, 2013 Permit status: Permit finaled | Current use: Apartment | Permit id: 13044-20001-051 | |||||
SCORE 100 New hvac for a 4 story-25 unit apartment. 3 stories over 1 level of g Date: June 5, 2013 Contractor: Kaveh Dolatabady Permit type: Hvac | Permit status: Permit finaled | Current use: Apartment | Permit id: 13044-10000-051 | |||||
SCORE 88 Plumbing Date: December 12, 2013 Contractor: John Kivlen Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-20001-218 | |||||
SCORE 93 Fa for apartment 27 units. 1 panel and 38 devices. Date: May 30, 2013 Contractor: Bear Contractors Inc Permit type: Electrical | Permit status: Permit finaled | Current use: Apartment | Permit id: 13041-10000-141 | |||||
SCORE 99 Plan check for power and energy. New 3 floor 25 unit apartment with a Date: January 18, 2013 Contractor: Waynes Electric Inc Permit type: Electrical | Permit status: Permit finaled | Current use: Apartment | Permit id: 12041-20000-242 | |||||
SCORE 86 Hvac Date: November 25, 2013 Contractor: Sylmar Air Conditioning Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 13044-20001-051 | |||||
SCORE 64 Electrical Date: June 5, 2013 Contractor: Ledcom Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 13041-30000-146 | |||||
SCORE 91 Proposed 4 story, 25 unit apartment w/ garage. The 1st floor is gara Permit type: Fire sprinkler | Permit status: Permit finaled | Current use: Apartment | Permit id: 13043-10000-001 | |||||
SCORE 93 Fa for apartment 27 units. 1 panel and 38 devices. Date: May 30, 2013 Contractor: Bear Contractors Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 13041-10000-141 | |||||
SCORE 99 Plan check for power and energy. New 3 floor 25 unit apartment with a Date: January 18, 2013 Contractor: Waynes Electric Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 12041-20000-242 | |||||
SCORE 86 Date: November 25, 2013 Contractor: Sylmar Air Conditioning Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 13044-20001-051 | |||||
SCORE 100 New hvac for a 4 story-25 unit apartment. 3 stories over 1 level of g Date: June 5, 2013 Contractor: Kaveh Dolatabady Permit status: Permit finaled | Current use: Apartment | Permit id: 13044-10000-051 | |||||
SCORE 64 Date: June 5, 2013 Contractor: Ledcom Inc Permit status: Permit finaled | Current use: Apartment | Permit id: 13041-30000-146 | |||||
SCORE 88 Date: December 12, 2013 Contractor: John Kivlen Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-20001-218 | |||||
SCORE 96 Pv2 multifamily dwelling. Total system size 16. 5 kw. Using 66 modules Date: July 22, 2013 Contractor: Jeff Farrington Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-177 | |||||
SCORE 99 Installation of hydro electric elevator for aparmtment. Date: February 7, 2013 Contractor: Brian Peterson Permit status: Permit finaled | Current use: Apartment | Permit id: 12046-20000-013 | |||||
SCORE 88 Potable water, waste and vent, low pressure gas system, and sump pump Date: January 9, 2013 Contractor: John Kivlen Permit status: Permit finaled | Current use: Apartment | Permit id: 12042-10000-218 | |||||
SCORE 91 Proposed 4 story, 25 unit apartment w garage. The 1st floor is gara Permit status: Permit finaled | Current use: Apartment | Permit id: 13043-10000-001 |