Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Revise permit# b1209246 to include elevator review Date: September 6, 2012 Client: Hotel Monticello | Applicant: Hotel Monticello; Stevens | Permit type: Addition alteration | Permit status: Completed | Permit id: B1213961 | |||||
An after hours permit is respectfully requested from 7am to 7pm sunday Date: December 5, 2012 Client: Crane Service Co | Applicant: Christine Long | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300188 | |||||
Facade renovation of existing hotel & new elevator penthouse. Date: August 24, 2012 Client: Mast Capital | Applicant: Mast Capital; Rojas | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1207590 | |||||
Interior renovation of existing 7 story hotel all interior work Date: July 11, 2012 Client: Mh Owner, Llc | Applicant: Carlos Rojas; Mh Owner, Llc; Rojas | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1209246 | |||||
Interior demolition partitions, mechanical, electrical, an selected structural. See drawings Date: May 23, 2012 Client: Mast Capital | Applicant: Mast Capital; Rojas | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200571 | |||||
Install one (1) new g2l 5-4x6-8 withthe capacity of 3500lbs Date: December 4, 2012 Client: Hotel Monticcllo | Applicant: Otis Elevator | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1300361 | |||||
Replace elevator equiptmment including motors, door equiptment, car door, fixtures,govenor ropes, controller and wiring one (1) traction overhead elevator Date: November 29, 2012 Client: Mh Owner Llc | Applicant: Potomac Elevator | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1300441 | |||||
Plumbing and gas Date: October 3, 2012 Client: Mh Owner Llc | Applicant: Joe Saffer | Permit status: Completed | Permit id: P1300075 | |||||
Renovation of kitchen and bar at b1 level and add bar at roof. Date: March 8, 2013 Client: Mast Capital | Applicant: Mast Capital; Rojas | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1214039 | |||||
This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildxpkm4diocgtsumpl1wjwk Date: April 8, 2013 Client: Mh Owner, Lic | Applicant: Mark Sleeman; Mh Owner, Lic; Paul Warren | Permit type: Electrical | Permit status: Completed | Permit id: E92468721 | |||||
SCORE 56 Interior renovation of existing 7 story hotel all interior work Date: July 11, 2012 Contractor: Carlos Rojas; Mh Owner Llc; Rojas Client: Mh Owner, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209246 | |||||
SCORE 93 Electrical Date: November 13, 2012 Contractor: Larry K Deal Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1301049 | |||||
SCORE 96 Electrical Date: November 14, 2012 Contractor: Paul E Warren Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1301075 | |||||
SCORE 96 Mechanical Date: August 16, 2012 Contractor: Bernard R Atkins Client: Mh Owner Llc | Permit status: Completed | Permit id: M1202692 | |||||
SCORE 96 Plumbing and gas Date: October 3, 2012 Contractor: Joe Saffer Client: Mh Owner Llc | Permit status: Completed | Permit id: P1300075 | |||||
Plumbing and gas Date: August 16, 2012 Client: Mh Owner Llc | Permit status: Completed | Permit id: P1207353 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildxpkm4diocgtsumpl1wjwk Date: April 8, 2013 Contractor: Mark Sleeman Mh Owner Lic Paul Warren Client: Mh Owner, Lic | Permit type: Electrical | Permit status: Completed | Permit id: E92468721 | |||||
SCORE 96 Plumbing and gas Date: October 3, 2012 Contractor: Joe Saffer Client: Mh Owner Llc | Permit status: Completed | Permit id: P1300075 | |||||
Plumbing and gas Date: August 16, 2012 Client: Mh Owner Llc | Permit status: Completed | Permit id: P1207353 | |||||
SCORE 96 Electrical Date: August 8, 2012 Contractor: Paul E Warren Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1208426 | |||||
SCORE 93 Electrical Date: November 13, 2012 Contractor: Larry K Deal Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1301049 | |||||
SCORE 96 Mechanical Date: August 16, 2012 Contractor: Bernard R Atkins Client: Mh Owner Llc | Permit status: Completed | Permit id: M1202692 | |||||
SCORE 65 Renovation of kitchen and bar at b1 level and add bar at roof. Date: March 8, 2013 Contractor: Mast Capital Rojas Client: Mast Capital | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214039 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https:/ospi. Dcra. Dc. Gov/ospi/printpermit. Aspx? Param=zi8iggjeildxpkm4diocgtsumpl1wjwk Date: April 8, 2013 Contractor: Mark Sleeman; Mh Owner Lic; Paul Warren Client: Mh Owner, Lic | Permit type: Electrical | Permit status: Completed | Permit id: E92468721 | |||||
SCORE 65 Interior demolition partitions, mechanical, electrical, an selected structural. See drawings Date: May 23, 2012 Contractor: Mast Capital Rojas Client: Mast Capital | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200571 | |||||
SCORE 65 Facade renovation of existing hotel & new elevator penthouse. Date: August 24, 2012 Contractor: Mast Capital Rojas Client: Mast Capital | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207590 | |||||
SCORE 56 Interior renovation of existing 7 story hotel all interior work Date: July 11, 2012 Contractor: Carlos Rojas Mh Owner Llc Rojas Client: Mh Owner, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209246 | |||||
SCORE 56 Revise permit# b1209246 to include elevator review Date: September 6, 2012 Contractor: Hotel Monticello Stevens Client: Hotel Monticello | Permit type: Addition alteration repair | Permit status: Completed | Permit id: B1213961 | |||||
SCORE 59 Install a 6 x tent, a x tent and a 24 x 33 tent for a two day event on 5/21/2016-5/22/2016. Date: May 20, 2016 Contractor: N A Mh Owner Llc; Sheila Linn Client: Na Mh Owner, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600144 | |||||
SCORE 59 Assemble tents to cover rooftop patio in below formation 3 x tents Date: June 17, 2016 Contractor: N A Mh Owner Llc; Sheila Linn Client: Mh Owner Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600164 | |||||
SCORE 65 Renovation of kitchen and bar at b1 level and add bar at roof. Date: March 8, 2013 Contractor: Mast Capital; Rojas Client: Mast Capital | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1214039 | |||||
SCORE 65 Interior demolition partitions, mechanical, electrical, an selected structural. See drawings Date: May 23, 2012 Contractor: Mast Capital; Rojas Client: Mast Capital | Permit type: Demolition | Permit status: Permit issued | Permit id: D1200571 | |||||
SCORE 56 Interior renovation of existing 7 story hotel all interior work Date: July 11, 2012 Contractor: Carlos Rojas; Mh Owner, Llc; Rojas Client: Mh Owner, Llc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1209246 | |||||
SCORE 65 Facade renovation of existing hotel & new elevator penthouse. Date: August 24, 2012 Contractor: Mast Capital; Rojas Client: Mast Capital | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1207590 | |||||
SCORE 56 Revise permit# b1209246 to include elevator review Date: September 6, 2012 Contractor: Hotel Monticello; Stevens Client: Hotel Monticello | Permit type: Addition alteration repair | Permit status: Completed | Permit id: B1213961 | |||||
SCORE 99 An after hours permit is respectfully requested from 7am to 7pm sunday Date: December 5, 2012 Contractor: Christine Long Client: Crane Service Co | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Ah1300188 | |||||
SCORE 79 Replace elevator equiptmment including motors, door equiptment, car door, fixtures,govenor ropes, controller and wiring one (1) traction overhead elevator Date: November 29, 2012 Contractor: Potomac Elevator Client: Mh Owner Llc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1300441 | |||||
SCORE 98 Install one (1) new g2l 5-4x6-8 withthe capacity of 3500lbs Date: December 4, 2012 Contractor: Otis Elevator Client: Hotel Monticcllo | Permit type: Elevator - new | Permit status: Permit issued | Permit id: En1300361 | |||||
SCORE 96 Electrical Date: August 8, 2012 Contractor: Paul E Warren Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1208426 | |||||
SCORE 96 Electrical Date: November 14, 2012 Contractor: Paul E Warren Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1301075 | |||||
SCORE 93 Electrical Date: November 13, 2012 Contractor: Larry K Deal Client: Mh Owner Llc | Permit status: Permit issued | Permit id: E1301049 | |||||
SCORE 96 Plumbing and gas Date: October 3, 2012 Contractor: Joe Saffer Client: Mh Owner Llc | Permit status: Completed | Permit id: P1300075 | |||||
Plumbing and gas Date: August 16, 2012 Client: Mh Owner Llc | Permit status: Completed | Permit id: P1207353 | |||||
SCORE 96 Mechanical Date: August 16, 2012 Contractor: Bernard R Atkins Client: Mh Owner Llc | Permit status: Completed | Permit id: M1202692 | |||||
SCORE 56 This supplemental permit was issued online. Use the online permit view application on dcra intranet to view the details and print a copy of the permit. Alternatively, you can copy and paste the following url into an internet browser. Https: ospi. Dcra. Dc. Gov ospi printpermit. Aspx? Param=zi8iggjeildxpkm4diocgtsumpl1wjwk Date: April 8, 2013 Contractor: Mark Sleeman; Mh Owner, Lic; Paul Warren Client: Mh Owner, Lic | Permit type: Electrical | Permit status: Completed | Permit id: E92468721 | |||||
SCORE 56 Special event: holiday festivities 1 . 6x tent 2 . 10x tent 3. 24x33 tent Date: December 14, 2015 Contractor: Sheila Linn Client: Mh Owner Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600046 | |||||
SCORE 56 Special event toys for tots and winter weekend 1 6x tent 1 10x tent 1 24x33 tent Date: November 25, 2015 Contractor: Elizabeth Power Graham Georgetown Hotel Client: Elizabeth Power Graham Georgetown Hotel | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600040 | |||||
SCORE 56 Special event new years festivities 1 60x tent 1 10x tent 1 24x33 tent Date: November 25, 2015 Contractor: Elizabeth Power The Graham Georgetown Hotel Client: Elizabeth Power The Graham Georgetown Hotel | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600039 | |||||
SCORE 56 A total for five temporary tents will be erected to cover the existing rooftop patio of the hotel. Three tents are 10x and will be arranged side by side running parallel to thomas jefferson street, nw on the thomas jefferson street, nw side of the rooftop. The fourth tent is also 10x and will be on the opposite side of the roof as the other three and positioned parallel to thomas jefferson street, nw. The fifth tent is 6x will be positioned perpendicular to thomas jefferson street, nw. Date: November 18, 2016 Contractor: Legacy Hotel Group, Llc; Matthew Minora Client: N A Legacy Hotel Group, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600212 | |||||
SCORE 59 Assemble tents to cover rooftop patio in below formation 3 x tents Date: June 17, 2016 Contractor: Mh Owner, Llc; Sheila Linn Client: Mh Owner Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600164 | |||||
SCORE 59 Install a 6 x tent, a x tent and a 24 x 33 tent for a two day event on 5 21 2016-5 22 2016. Date: May 20, 2016 Contractor: Mh Owner, Llc; Sheila Linn Client: N A Mh Owner, Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1600144 | |||||
SCORE 56 A total of 5 tents will be erected to cover the existing rooftop patio of the hotel. Three tents are 10x and will be arranged side by side running parallel to thomas jefferson street, nw on the thomas jefferson street, nw side of the rooftop. The fourth tent is also 10x and will be on the opposite side of the roof as the other three positioned parallel to thomas jefferson street, nw. The fifth tent is 6x will be positioned perpendicular to thomas jefferson street, nw. Date: April 19, 2017 Client: Lagacy Hotel Group Llc | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Tn1700090 | |||||
SCORE 88 Body of work: replace armor machine ( type 2) with new hollister whitney type 44 ch. Replace imperial 12. 3 hp ac motor with new reuland 12. 5 hp ac motor. Replace hoist ropes. Date: April 5, 2017 Contractor: Potomac Elevator Company Client: The Graham Georgetown | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1701716 |