Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 3 sqft pool (master plan 92) for sfd (1003-20090202) (sfd still under construction hold final till sfd finals) Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2011-1023-20 | Parcel: 379-040-47-00 | |||||
Sfd demolition permit -- demo existing sfd. Note: _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa dplu offices (5201 ruffin road) for more information. Date: December 23, 2008 Permit type: Residential alterati | Permit status: Completed | Permit id: Pds2008-1005-20 | Parcel: 379-040-47-00 | |||||
SCORE 89 Roof mount residential solar pv for existing sfd (no meter upgrade). Persection 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roof. Date: July 22, 2015 Contractor: Mc Wire Electric Inc Permit type: Residential alterati | Permit status: Open | Permit id: Pds2015-Resalt- | |||||
Sfd demolition permit -- demo existing sfd. Note _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not "grandfather" its use if it is removed. Please see the zoning counter at the kearny mesa dplu offices (5201 ruffin road) for more information. Date: December 23, 2008 Permit type: Demolition sfd | Permit status: Completed | Permit id: Pds2008-1005-20 | Parcel: 3790404700 | |||||
SCORE 87 Roof mount residential solar pv for existing sfd no. Of modules: 30 no. Of inverters: 1 total system size in kilowatts: 7. 35 per section 46 (i) of the zoning ordinance, roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roof. Date: November 23, 2011 Contractor: All Seasons General Contracting Permit type: Solar photovoltaic residential (hra) | Permit status: Completed | Permit id: Pds2011-1031-20 | Parcel: 379-040-47-00 | |||||
SCORE 90 3075 sq ft single story sfd w ac & fs, 786 sq ft att fin garage w fs and 374 sq ft covered patios. 2 amperes service, temporary power notice to permittee: temp power shall be inspected prior to framing inspection 08 20 20 plan change from slab on grade to partial stem wall due to elevation issues jle vmd also relocate sfd... Vmd 6 25 10: changed contractors (new application received with contractors signature); see c of a other text detail... Vmt 04 21 plan change to revise plot plan see c of a... Vmd 10 21 09: plan clarification see conditions of approval for details. 1srs Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2009-1003-20 | Parcel: 379-040-47-00 | |||||
SCORE 56 3075 sq ft single story sfd w ac & fs, 786 sq ft att fin garage w fs and 374 sq ft covered patios. 2 amperes service, temporary power notice to permittee: temp power shall be inspected prior to framing inspection 10 21 09: plan clarification see conditions of approval for details. 1srs Permit type: New primary residential structure | Permit status: Completed | Permit id: Pds2009-1001-20 | Parcel: 379-040-47-00 |