Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 Upgrade main electrical panel from 100amp to 200amp panel with shut off Date: April 1, 2011 Contractor: Laine Mohican And Jenack Scott E Permit type: Electrical | Permit status: Closed | Current use: Residential | Permit id: Bld2011-01889 | |||||
SCORE 100 Reroof house, strip to deck, remove and replace any damaged decking w /7/16osb, ice & water shield required, tiger pay felt, shingles, ventilation to code, crickets where required, 45 mil flex membrane for flat roof. Not hist/wd. Zone r-1-5000, sfd, reroof house only. Date: March 21, 2012 Contractor: Shaw Roofing And General Contracting Inc Permit status: Closed | Current use: Residential | Permit id: Bld2012-02117 |